• Title/Summary/Keyword: 건설 기능인력

Search Result 105, Processing Time 0.032 seconds

Structural Performance Test of A Rahmen Bridge with Inverted-T Girder (Inverted-T형 거더 라멘교의 구조성능 시험)

  • Lee, Yeon-Hun;Park, Yong-Kwon;Yang, Dong-Wook;Lim, Hyeon-Sik;Chung, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.99-100
    • /
    • 2010
  • The objective of this research aims at improving the structural and economical efficiency of small and medium-span reinforced concrete bridges by importing the Inverted-T girders (hereinafter, called as IT). This new Rahmen bridge with IT girders has an advantage over minimizing the construction process which could cause environmental pollution and traffic congestion. Especially it is thought that this new composite bridge can give better aesthetic and view than existing old bridges, and can be a good construction method to solve labor shortage problems due to coming aging society. Therefore, this IT method should be one of very effective construction technologies to improve the constructibility and to reduce the construction cost.

  • PDF

A Development of Lineman Training Program for Bare-hand Work in 765kV Vertical Double Circuit T/L (765kV 수직2회선 송전선로 직접활선작업을 위한 인력양성 프로그램개발)

  • Choi, B.S.;Kim, H.J.;Kim, D.S.;Baek, S.H.;Won, S.H.;Lee, H.K.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2064-2065
    • /
    • 2007
  • 우리나라는 1960년대 이후 계속적인 경제성장에 따라 전력에너지의 수요도 끊임없이 증가하였고, 이후 꾸준한 전력계통의 설비 및 용량의 증가로 인해 현재에는 선진국 수준의 송전망을 구축하고 있으며, 765kV급 초고압 송전선로를 자체기술로 건설하여 운영하고 있는 상황이다. 향후 대용량 송전을 위한 초고압 송전계통 구성설비 증대가 계속 될 전망이다. 따라서, 전력의 신뢰도와 안전성 확보가 가능한 유지보수 방안이 필요 할 것이다. 특히 765kV 송전선로 고장시 전력계통에 미치는 영향은 막대할 것으로 사료되며 유지보수를 위해 휴전시 1일 수 억원의 발전제약비용이 발생 될 것으로 예상된다. 이에 765kV 송전선로의 휴전 없는 활선공법 활용의 필요성이 대두되고 있던 바, 산업자원부 전력산업연구개발사업으로 추진된 "초고압 송전선로 활선공법 및 관련장비 개발"(한국전기공사협회, 2006)과제가 성공적으로 개발되었고, 활선작업에서 중요한 직접활선작업원에 대한 전기적 안전성을 충분히 검토 분석되었다. (참고문헌 [1], [2], [3] 분석). 따라서 본 연구에서는 초고압 직접활선 기능을 보유할 수 있는 현장인력 양성을 위한 보다 효율적이고 안전한 교육 프로그램 개발 방안을 제시하고자 한다.

  • PDF

기계공업시장전망과 대응전략 (공작기계 중심으로)

  • Jeong, Hyeon-Ryul
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.4 no.1
    • /
    • pp.9-20
    • /
    • 1987
  • 지난해 우리나라는 주요 10대업종중 <조선>과 <건설>을 제외하고 대부분의 업종이 3저의 영향으로 생산, 내수, 수출등 제분야에서 고루 균형을 가진 호황의 한 해였다. 우리나라는 본원적으로 부존자원이 없는데다가 외채자본에 의존한 결과, 경제적 자립성을 유지하기 위해서는 부득이 해외시장에 의존하지 않을 수 없다. 그러기 때문에 정부는 지 금까지 수출주도형 고도성장정책을 견지해 왔으며 이 결과 국제수지의 적자와 물가상승등 부작용이 뒤따른것도 사실이다. 아뭏든 지난해의 우리나라 경제를 요약하면 경제성장- 물가안정-국제수지흑자로 이어졌는데 결국 세마리의 토끼를 한꺼번에 잡은 행운의 한 해 였음이 분명하다. 특히 값진 보람이라고 한다면 지금까지의 만성적인 국제수지적자가 추 방되고 사상초유의 흑자원년을 기록했다는 사실이다. 이렇게 볼 때, 우리기업인들은 행운이였다고 하기 이전에 주어진 기회를 재빠르게 포착하여 이용했다는 사실에서 그 저력을 과시하는 표현이 더욱 적절할 것 같다. 금년에도 또 몇마리의 토끼를 잡기 위해서는 고속성장보다는 안정된 기조하에서 수출주도형의 경제정책이 계속 밀고나가야할 것으로 생각 된다. 3저현상은 무한히 지속하는 것이 아니며 언제 무산될지 모르는 미래에 대비하여 사전 에 그 대응책이 마련되어야 하며 이 처방은 경쟁 우위력에서 구해내야할 것이다. 따라서 우리 는 축적된 경험과 <노우하우>를 바탕으로 품질의 고급화, 생산성향상, 부가가치의 증진등으로 선진국 대열에 진입할 수 있는 힘을 키워야 하며 이것은 오직 노사협조라는 평범한 진리에서 얻을 수 있다. 금년도 년초에 대통령의 국정연설에서 <올해는 우수한 기술. 기능인이 대폭 육성되고 이들이 산업현장에서 자기의 꿈을 키울 수 있도록 더욱 효과있는 지원제도를 발전해 나갈 것이다...>라고 하였고 또 <이같은 과학기술의 진흥과 산업현장의 기술. 기능인력을 양 성하는 데 역점을 둔다...>는 최고지도자의 구상은 바로 우리가 기대했던 공감대를 형성하였 다고 본다.

  • PDF

Development of the Rebar Auto Placing System Using 3D Structural Information Model (3차원 골조정보모델을 이용한 철근배근 자동생성 시스템)

  • Lee, Byeong-Kwun;Kim, Chee-Kyeong;Kim, Gye-Joong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.72-75
    • /
    • 2009
  • 본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.

  • PDF

An Imported Case of Kala-azar in Korea (중동에서 유입된 Kala-azar 1예)

  • 지제근;송영기
    • Parasites, Hosts and Diseases
    • /
    • v.21 no.1
    • /
    • pp.87-94
    • /
    • 1983
  • Kala-azar는 우리나라에는 분포하지 않는 것으로 인정되고 있으나 과거 중국에서 감염되어 국내에서 관찰된 보고가 있는 질병이다. 최근에 중동 지방에서 감염되어 귀국하고 발병하였다고 생각되는 예를 보고한다. 서울에 주소를 둔 26세의 한국인 남자가 1년간 사우디 아라비아에서 건설기능공으로 근무하고 1981년 9월 귀국하여 약 8개월 후인 1982년 5월 경부터 심한 피로감, 전신쇠약, 복부의 수물등을 느끼기 시작하였다. 환자가 국립서울병원을 거쳐 서울대학교병원에 1982년 9월 17일 입원할 당시에는 간과 비장이 모두 14cm정도 만져질 만큼 부어있었고, 심한 체중 감소(4개월간 14kg의 감소), 적혈구, 백혈구, 혈소판등 모든 혈구의 감소등이 관찰되었다. 간생검을 통해 amastigote가 관찰되고 이는 투사전자현미경을 통해서 전형적인 amastigote형으로 확인되었다. 환자는 국외에서 구한 약제인 sodium antimony gluconate(Pentostam )와 각종 보조요법에 의해 치료를 받았다. 퇴원 직전에 시행한 간생검에서 괴사된 간 조직이 섬유화로 대치된 것이 확인되었고 충체는 관찰되지 않았다. 이 Kala-azar 에는 1952년 만주에 유입되어 보고된 3예 이후로는 처음 관찰된 것으로 중동에서 유입된 것으로는 첫번째 보고례이다. 최근 급격히 늘어난 해외 인력진출을 감안하면 해당 지역의 열대 풍토병에 대한 다각적인 대책이 절실히 요청된다.

  • PDF

An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction (공동주택 골조공기단축을 위한 요소기술의 현장 적용성 평가)

  • Kim, Kyu-Hoi;Park, Moon-Seo;Lee, Hyun-Soo;Park, Song-Woo;Joo, Sun-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.368-372
    • /
    • 2007
  • Recently, construction companies prefer to use large scale system forms to prepare for lacking of skilled workers, aging and the chances of application of pre-build&post-sale policy. In result of the effort and interest, the duration for framework of domestic high rise buildings has been accomplished to 3-4days per floor but for the apartment housing which form over 90% of the domestic construction industry, and especially the middle story RC apartments which is the main part, the duration for framework is only about 6-8days per level. This is only about 50% of the duration per level of RC residential buildings in North America. In previous researches elementary technology, which has potential of duration reduction, was proposed and this research suggest the applicability in construction sites and ways to improve it using elementary technology applied Mock-up Test. Furthermore, we analyze the productivity and T/C usage rate of the 6day-Cycle and suggest an improved model.

  • PDF

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

On Slimming down the Functions Room of Light Rail Transit Stations by Utilizing an Enhanced DSM Method (개선된 DSM 기법을 통한 경전철 정거장 기능실의 슬림화에 관한 연구)

  • Kim, Joo-Uk;Park, Kee-Jun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.927-939
    • /
    • 2015
  • It appears that the rapid advance in technology has allowed to broaden the variety of rail systems technology, thereby fostering new business opportunity in rail industry. The direction of rail systems operations is mainly two fold. In one direction, long distance operations between mega cities are pursued with help of high speed trains under development. In the other case, relatively short distance operations for covering intra-city or suburban area are becoming popular. A good example of the latter case is light rail transit (LRT) systems. Due to the short distance operation, it is thus expected that both the development and operation cost for LRT systems be reduced to some extent. The cost reduction desired in there can be gained by scaling down the sizes of both the trains and stations as compared to those of normal rail systems. However, it is not well known how the LRT stations can be scaled down. The objective of this paper is to study on how to slim down the stations (particularly, the functions room) of LRT systems. To achieve the objective, an approach is studied based on a modified method of design structure matrix (DSM). Specifically, using the enhanced DSM method, an integrated architecture is developed for the functions room, in which equipments are housed to perform the functions of electricity, signaling, and communication for LRT stations. The use of the result indicates that the desired reduction can be obtained with the approach taken in the paper.

An Analysis on the Problems of the Serious Disaster Punishment Act from the Construction Industry's Perspective and Proposed Improvement Measures (건설업계 관점에서의 중대재해처벌법 시행에 따른 문제점 분석 및 개선방안)

  • Lee, Dae-Hyeong;Lee, Jun-Yong;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.187-196
    • /
    • 2023
  • The objective of this study was to analyze the awareness, necessity, and challenges of the Serious Disaster Punishment Act within the domestic construction industry, which is subject to the legislation implemented by the government. The research aimed to propose future improvement measures. According to the findings, safety officials consider securing more young and competent domestic skilled workers, as well as improving safety management standards and workers' safety awareness, to be the most crucial factors in preventing and reducing safety accidents. Furthermore, the primary improvement plan for the Serious Disaster Punishment Act involves clarifying ambiguous provisions in the current law. Government policy support is necessary to enhance the effectiveness of the Serious Disaster Punishment Act, and revisions should focus on preventive measures that contribute to the establishment of a safe working environment.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.