A Study of the Strategic Advanced Project Management Application in the Korean Construction Industry (한국 건설산업의 전략적 선진 프로젝트 매니지먼트 적용에 대한 연구)

  • Park, Chang-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.572-577
    • /
    • 2008
  • In order to apply strategic advanced project management to the Korean construction industry, the study conducted a comparative analysis of the project management body of knowledge of the advanced countries such as the USA and Japan as well as Europe. As a result, it was found that the connection to 'execution' of 'strategy' was highlighted as a common main issue in the theoretical background of project management body of knowledge, and strategic planning, which aligns 'program management' based on the integration of multiple project management and operations in single project with 'portfolio management' for selection and concentration, has been emphasized. Accordingly, the study built up the framework for the application of strategic advanced project management for strategic action in the Korean construction industry and proposed the following applicable solutions for implementation into the current Korean construction industry: 1) Innovate global competitiveness by preparing an 'ideology and philosophy' for the strategic action of an organization, 2) Establish a strategic 'environment' in consideration of the culture and structure of an organization, 3) Propose a strategic 'vision' for attaining a realizable goal within an organization, 4) Create an 'investment' on the portfolio in line with the strategy, 5) 'Execute' the program through the portfolio and project management. Lastly, the study brought up strategies for sustainable growth by applying strategic advanced project management to the Korean construction industry with a view to acquiring 'Performance' through the implementation and operation of their integrated system.

  • PDF

A Study on BIM based Process Risk Management Model (BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구)

  • Jeon, Seung-Ho;Choi, Myung-Seok;Lee, Joo-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2010
  • Recently a construction industry introduces information technology that brings about many advantages in the early planning phase, design phase and construction phase. Nevertheless a BIM has a many benefits, it has limits which are not only usually using 3D modeling but also limit of making full use of practical affairs because of a lack of connecting varietals of progress of work. To solve these uppermost limits, this research is presenting unified systems to use in risk management which are efficient management of space and non-space information, space analysis.

  • PDF

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

Program Management Strategy for Mu1tifuntional Administrative City Construction (행정중심복합도시 건설의 종합사업관리방안)

  • Kim, Woo-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.29-36
    • /
    • 2006
  • 행정중심복합도시의 건설의 우리나라의 국가적인 전략도시를 건설하기 위한 중대한 사업이며, 사업의 특성상 기존의 신도시나 대형 건설프로젝트와는 상이한 속성을 가지고 있다. 행복도시 건설사업을 효과적으로 성공시키기 위한 방안으로서 종합사업관리방안에 대하여 분석하고 그 대안을 마련하고 있다. 우선 기존의 신도시건설사업과 어떠한 차이가 있는지 알아보고, 해외의 사례중에서 말레이시아의 푸트라자야 건설사업을 조사하여 그 유사성과 차이점을 분석함으로써, 행복도시 건설사업에서의 종합건설사업관리방안에 대한 단초를 마련하고자 한다. 본 고에서 언급하는 내용은 현재 행복도시건설청이 사업관리방안을 마련하기 위하여 연구중에 있는 사안으로서, 구체적인 대안들을 제시하는 것에는 한계가 있다. 다만 건설청의 바람직한 사업관리체계에 대한 향후의 논의전개와 국내의 종합사업관리체계에 대한 관심과 연구를 촉진하는 데에 도움이 되었으면 하는 바람으로 본고를 제출하고자 한다.

  • PDF

A Study On Information Classification Systems For Civil Construction (토목공사 정보분류체계에 관한 연구)

  • Kim Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.102-111
    • /
    • 2003
  • It is very important to improve the overall efficiency in exchanging construction information among project Parties from the project set-up through the project completion. However, each government agency in Korea tendering construction projects has different structures in classifying information. This results in inefficiency of overall construction projects and cost increasing. This requires establishing a new construction information classification system. This research suggests a framework for an analysis of a standard classification system in setting up a standard classification system and in evaluating its applicability to business processes. According to the identified requirements of the classification system, this research analyzes and compares existing information classification systems such as Uniclass, Uniformat, and Korean Standard Classification System of Construction Information, and then identifies problems and approaches for the improvement.

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

A Study on the Model for Construction Records Classification System (건설기록물 분류체계 모형에 관한 연구)

  • Park, Yong-Boo;Kim, Tae-Soo
    • Journal of the Korean Society for information Management
    • /
    • v.28 no.3
    • /
    • pp.83-101
    • /
    • 2011
  • The international standards, ISO 15489 and Family Code, recommend using functional classification method both in public and private organizations. In this study made a comparative analysis of the details of classification systems through case studies on records classification systems of a total of seven comprehensive construction companies in Korea including three large corporations and four small and medium-size businesses. Findings of this study suggester the direction of developing construction records classification system and its methodology. By summarizing classification standards derived from these case studies, key construction records classification standards were presented.

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information (설계모델과 문서정보의 효율적 연계를 위한 BIM기반 데이터베이스 체계 구축방안)

  • Lee, Donggun;Cha, Heesung;Kim, Kyungrai;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.42-53
    • /
    • 2015
  • Construction industry has the form of industry progressed through mutual cooperation among participants in various fields. Accordingly, it may be referred to as an aggregate of information where various pieces of information are generated and managed according to each construction phase. Most of the information on the construction project is issued in the form of a document. And document management of the site is critical to successful execution of the project. Therefore, in the construction site to use IT technology for efficient information management. But, most of the information on the construction site is managed by the non-structured document. and Information management in the construction site is difficult to lack of information management systems. In this study, proposed construction information database structure and breakdown structure to the information management of the construction site through the BIM technology. Therefore, previous studies were reviewed about the document management and information link management. and Space breakdown structure and information breakdown structure was proposed to structure the information of the construction site and Database for information storage is designed. And, BIM-based construction information database was examined through the application scenario.