• Title/Summary/Keyword: 건설업체

Search Result 977, Processing Time 0.028 seconds

A Status Analysis on the Field Management of Professional Construction Firms after Abrogation of Construction Participants System (시공참여자제도 폐지 이후 전문건설업체의 현장관리 실태분석)

  • Park, Kyoung-Hun;Kim, Hwa-Joong;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.199-203
    • /
    • 2009
  • After the construction participants system is abolished, expectations are high for its consequences such as liquidating paper-companies, holding back low price contracts, and improving multi-stepwise subcontract structure. However, the professional construction firms have been took responsibilities and obligations as businessmen employing the chief workmen and construction workers. For this reason, it is expected that they will be charged a great deal of expenses such as increase in labor management services and laborers, the occurrence of an retirement grants, insurance fees, etc. Since the hold on power of field managers are getting weaker toward the construction workers, it is most likely to have loss in efficiency of production in the long term. Therefore purpose of this research is to analyze difficulties and the point at issues with which professional construction firms are undergoing after abolishing the construction participants system by investigating on the actual condition in the field management. For this research, we got a grip on the actual condition and analyzed the rise of a primary factor on reinforced concrete construction.

  • PDF

Security Policy Framework for Home Network (홈 네트워크 보안 정책 프레임워크)

  • Kim, Geon-Woo;Kim, Do-Woo;Lee, Jun-Ho;Han, Jong-Wook
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • v.9 no.1
    • /
    • pp.839-842
    • /
    • 2005
  • As various mobile technologies, sensor technologies, and remote control technologies are growing and quality of life is enhanced, researches and developments on home network are actively on going. Currently, some network service providers and construction corporations are going to provide home network service, but neither secure nor efficient, So, in this paper, we propose a security framework for providing various secure user authentication mechanisms and efficiently controlling services in home network. Namely, we are going to provide active home network security services with home gateway-based security policy, which locates on the gateway of each home.

  • PDF

Development of 400kV XLPE Cable and Accessories (400kV XLPE 케이블 및 부속재 개발)

  • Shin, H.D.;Nam, J.S.;Choi, Y.H.;Choi, B.N.;Kim, H.J.;Song, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2268-2270
    • /
    • 2005
  • 전력계통분야에서 송전전압의 초고압화는 꾸준히 연구가 진행되는 과제중의 하나이다. 국내에서는 당사가 참여한 한전(KEPCO)의 영서${\sim}$ 영등포 345kV XLPE 지중T/L 건설공사가 2003년 6월 20일 국내 최초로 준공된 이후 현재까지 아무런 문제없이 운전중에 있으며, 향후 그 수요가 꾸준히 증대될 것으로 예상되고 있다. 전 세계적으로 살펴보더라도 400KV급 XLPE 케이블 및 부속재에 대한 수요가 꾸준히 확대되고 있다. 그러므로, 당사에서는 국내에서 345KV 케이블 및 부속재를 개발한 기술력을 바탕으로, 한 단계 업그레이드된 해외시장에서 세계의 업체들과 경쟁하기 위해, 400KV 2500sq.mm XLPE 케이블 및 부속재를 성공적으로 개발하였다. 이에 관해 소개하고자 한다.

  • PDF

Test Run for the Production of Aluminum Hydroxide by Recycling of Waste Aluminum Dross (알루미늄 폐드로스로부터 수산화알루미늄 생산 시운전 결과)

  • Lee Hooin;Park Ryungkyu;Kim Joonsoo
    • Resources Recycling
    • /
    • v.13 no.2
    • /
    • pp.47-53
    • /
    • 2004
  • Waste aluminum dross is a major waste in the aluminum scrap smelters, and some metallic aluminum remains in the waste dross. In the previous study, waste aluminum dross was leached with sodium hydroxide solution to extract the remained aluminum into the solution, and aluminum hydroxide precipitate was recovered from the leached solution. A pilot plant was constructed and tested to demonstrate the developed technology. One thousand tons of waste aluminum dross could be processed, and about five hundred tons of aluminum hydroxide could be produced in the pilot plant. From the test run of the pilot plant, it was confirmed that the developed technology could be employed as a commercial scale and the produced aluminum hydroxide could be used for water treatment agent.

A Study on The Causes and Outcomes of Relationship-Orientedness between Businesses (관계지향성의 구성요인 및 원인과 성과에 관한 연구)

  • 최낙환;김영아;이호정
    • Asia Marketing Journal
    • /
    • v.3 no.3
    • /
    • pp.1-24
    • /
    • 2001
  • 본 연구는 자원의존이론, 거래비용이론, 관계계약이론 등의 선행연구를 검토하여 관계지향성의 원인과 성과를 밝히고자 하였다. 먼저 구매기업과 공급기업간의 행동적 관계지향요인과 관계지향성 분석을 실시하였다. 행동적 관계지향요인으로는 정보교환, 조화노력, 행동적 규범, 업무결속을 들고, 관계지향성 분석을 위해 군집분석을 실시하였다. 연구표본에는 C지역의 전문건설업체를 대상으로 500부의 설문지를 배포, 그 중 185부를 회수하여, 적합한 설문 140부가 사용되었다. 군집분석결과 관계지향성 집단은 정보교환, 조화 노력, 협동규범 수용, 업무결속이 모두 높게 나타났고, 비관계지향성 집단은 정보교환, 조화노력, 협동규범 수용, 업무결속이 모두 낮게 나타나 기업간의 관계지향성을 의미있는 2개의 집단으로 나눌 수 있었다. 둘째, 기업간 관계지향성의 영향요인으로 환경의 역동성, 대안의 이용가능성, 공급의 중요성, 상호호혜전략, 신뢰성을 검토하였다. 본 연구에서 선정한 관계지향성에 대한 영향요인들이 관계지향집단과 비관계지향집단으로 분류하는데 얼마나 유용하게 이용될 수 있는가를 알아보기 위해 판별분석을 실시하였다. 관계지향집단과 비관계지향집단의 분류에 환경의 역동성, 대안의 이용가능성, 공급의 중요성은 영향이 없는 것으로 나타났으며, 호혜전략, 신뢰성은 의미가 있는 것으로 나타났다. 셋째, 기업간 관계지향성의 성과로서 실현경쟁우위와 관계유지의도를 검토하였다. 관계지향성이 성과에 어떠한 영향을 미치는가를 검증하기 위해 MANOVA(multivariatee analysis of variance)분석을 실시하였다. 실증 결과, 관계 정도가 높은 집단이 관계 정도가 낮은 집단보다 실현 경쟁우위수준을 높게 지각하고 관계를 유지하려는 의도가 높은 것으로 나타났다.

  • PDF

A Study on Effect of Psychological Capital on Turnover Intention & Mediating Effect of Organizational Commitment: Focusing on Construction Industry Workers (심리적 자본이 이직의도에 미치는 영향과 조직몰입의 매개효과에 대한 연구 : 건설업 종사자를 중심으로)

  • Lee, Su-jin
    • Journal of Venture Innovation
    • /
    • v.7 no.1
    • /
    • pp.151-166
    • /
    • 2024
  • The global economic growth rate has been slowed due to changes in the economic and social environment related to the recent trends in the construction market and construction industry, prolonged inflation, intense tensions among countries, and increased interest rates. Since the workers in the construction industry, due to the nature of the industry, move to another site after the completion of an awarded project rather than staying for a long time while performing work at one workplace, various issues are brought out such as poor working environment resulting from unfairness in construction contracts, aging of workers, their anxiety, and job instability. The previous studies on the turnover intention of construction industry workers mainly dealt with external aspects such as leadership, job embeddedness, and organizational citizenship behavior, while the psychological impact was overlooked. The purpose of this study was to develop a measure to reduce or alleviate turnover intention of construction industry workers by verifying empirically the relationship among psychological capital, organizational commitment, and turnover intention among them. For the purpose, whether psychological capital influences organizational commitment and turnover intention, the impact of organizational commitment on turnover intention, and whether organizational commitment has a mediating effect in the relationship between psychological capital and turnover intention, among 310 construction industry workers in the metropolitan area. The results are as follows: First, hope and self-efficacy were found to have a negative (-) effect on turnover intention, while resilience and optimism from psychological capital did not have a significant effect. Second, hope, resilience, and optimism from psychological capital were found to have a positive (+) effect on organizational commitment, while self-efficacy from psychological capital had no significant effect. Third, organizational commitment was found to have a significant mediating effect on the relationship between hope from psychological capital and turnover intention. The results of this study showed that, in construction industry workers, psychological capital affects turnover intention through the mediating effect of organizational commitment. While previous studies mainly considered external influences on the turnover intention of construction industry workers, this study has academic implications in that it sought to strengthen organizational commitment and alleviate turnover intention by approaching psychological aspects. As a practical implication, it was found that higher self-efficacy and hope for work in the organization, from psychological capital, in the construction industry workers were found to lower turnover intention through job performance in a psychologically stable state. It is considered, therefore, that various systems, including job autonomy and flexible work, should be established to improve self-efficacy and hope.

Development of the Accelerated Life Test Method & Life Test Equipment for the Counterweight of the Construction Machinery (건설기계용 카운터웨이트 시험장비 및 가속수명시험법 개발)

  • Lee, Gi-Chun;Lee, Young-Bum;Choi, Byung-Oh;Kang, Bo-Sik;Kim, Do-Sik;Choi, Jong-Sik;Kim, Jae-Hoon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.12
    • /
    • pp.1275-1280
    • /
    • 2015
  • A large-sized exciter that vibrates a two-ton component is required to simulate the field operating conditions of a counterweight of an excavator. However, it is difficult for a small-medium sized company to obtain a large exciter for the life test of a counterweight which is an equivalent counterbalancing weight that balances a load. Therefore, in this study, we developed life test equipment for evaluating the reliability of construction machinery weighing about two tons. It simulates the field operating conditions using rotational vibrators consisting of electric motors. A failure analysis of the counterweight was also performed for the major components. Field data acquired from various sites were applied to the life test design of the counterweight. Finally, a zero-failure qualification test based on the accelerated life test was designed, and there was no failure during the test, which guarantees a life of $B_5$ 10,000 hours.

Compressive Strength and Chloride Permeability of High Strength Concrete according to the Variety of Mineral Admixtures (광물질혼화재 종류별 고강도콘크리트의 압축강도 및 촉진 염소이온침투 특성)

  • Moon Han-Young;Kim Byoung-Kwon
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.3 s.81
    • /
    • pp.407-414
    • /
    • 2004
  • The purpose of this study is to evaluate the ability to resist chloride ions penetration of the concrete structure under marine environment in south-east asia especially. In this study, high strength concrete(HSC) with various combination of ordinary portland cement(OPC), blast-furnace slag(SG) and silica fume(SF) are cured 23 and $35^{\circ}C$ considering the site weather, and are cured in water for 3, 7 or 56 days respectively. And to investigate the fundamental properties and the resistance of chloride penetration of various HSC, setting time, slump flow, compressive strength, void and ASTM C 1202 test were conducted. Test results show that the compressive strength of HSC is similar regardless of SG replacement ratio and total charge passed of chloride is the smallest at 40% replacement of SG. The compressive strength of G4FS HSC is, besides, outstandingly high at early age compare with other HSC, but the compressive strength of G4F HSC, which is vary according to curing temperature and condition, most high at the age after 7 days. Total passed charge of HSC get larger in the order G4FS

Applicable Building Range for the Introduction of the Building Separation and Dismantling System (건축물 분별해체 제도 도입을 위한 적용 대상 건축물 범위 설정)

  • Park, Ji-Sun;Song, Tae-Hyeob;Choi, Dong-Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.1 no.3
    • /
    • pp.189-196
    • /
    • 2013
  • In order for efficient recycling and eco-friendly treatment of construction waste, there is a need to apply a building separation and dismantling technique early on in the stage of waste generation. This study was conducted to analyze the relevant domestic circumstances and propose the applicable range of buildings in order to introduce a building separation and dismantling system to Korea. For this purpose, related policies and systems implemented overseas and the current situation of buildings were examined, and the workability of separation and dismantling of buildings according to their uses was compared. Also, the economic impact of the separation and dismantling system was examined and a survey was conducted, seeking the opinions of the relevant companies regarding the need for the system and the selection criteria for eligible buildings. Based on the results, it was determined that it would be impossible to apply the separation and dismantling system to all buildings in Korea, considering the current technical power and economic situation, and that the system should be introduced in phases, according to the building classification determined based on floor area and use, as the cost may vary depending on a number of variables including the level of difficulty and field conditions.

Factors Affecting the BIM Acceptance of Construction Managers (건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구)

  • Chung, Yongche;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.11-23
    • /
    • 2015
  • Construction Management(CM) and Building Information Management(BIM) have a lot in common that they need to establish a cooperation system among different disciplines and promote smooth communication among project stakeholders throughout the project life-cycle. BIM can be an effective information management tool for CM's business and improve their service value. However, BIM uses by Construction Managers(CMr) are very limited. The objective of this study is to analyze the intention of CMrs to adopt BIM and establish effective BIM use strategy in the CMr's point of view. This study utilizes Technology Acceptance Model(TAM) as a research method, and the results show that 1) CMrs think it is more important whether BIM is required to be adopted in their business process at the social or industry level than that BIM can improve their personal competence, recognition, and impressions through their voluntary BIM adoption; 2) that CMrs think it is important to figure out business processes where BIM can be smoothly incorporated; and 3) that CMrs hesitate the use and trial of BIM in their realworld business although they agree that BIM needs to be eventually adopted in their business in the future. Based on these results, directions for establish a strategy for BIM adoption were proposed at the CMr's point of view