A Study on the Establishment of the Construction Failure Information Classification (건설실패정보 분류체계 구축에 관한 연구)

  • Park Chan-Sik;Jeon Yong-Seok;Shin Young-Hwan;Jang Nae-Chun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.97-105
    • /
    • 2003
  • Although Construction Failure Information has been reported in literatures, reports of research, and etc., it Is difficult to utilize the information because the information classification does not exist. Therefore, this study investigated and analyzed literatures of domestic and abroad research Institutions and suggested the Construction Failure Information Classification(CFIC). The CFIC is composed of four classified items; facility general information, failure situation information, failure cause Information, and failure counterplan information. Each item is divided sub-items. Through CFIC, Construction Failure Information can be standardized and utilized for useful data to prevent recurrences of construction failure.

A Web-Based Construction Failure Information System using Case-Based Reasoning (사례기반추론을 이용한 웹 기반 건설실패사례 정보시스템)

  • Park, Yong-Sung;Oh, Chi-Don;Jeon, Yong-Seok;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.257-267
    • /
    • 2008
  • In order to encourage construction practitioners to acknowledge failures and disseminate the information, the failure information must be documented and accumulated with a well-structured format, which contains not only the fact and result but also the circumstance and cause of the failure. In the Korean construction industry, many failures are not explained clearly and often not even reported publicly, partly because due to the lack of understanding positive aspects of failures, which can improve construction practices as a result of learning from failures. The purpose of this study is to develop a web-based construction failure information system using the case-based reasoning techniques, which can systematically accumulate, manage, and share the valuable failure information using a structured failure cases database. It can be utilized for planning proactive solutions on future failures by searching the very similar past failure cases.

Design of Construction Failure Index Quantification System for Risk Management Standardization (리스크 관리 표준화를 위한 건설실패지수 정량화 시스템 설계)

  • Kim, Woong-Bo;Park, Seok-Cheon;Kim, Sung-Chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.518-521
    • /
    • 2015
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크 관리(Risk Management) 체계를 수립하여 활용하고 있다. 하지만 국내 시공사와 발주사들은 과거 자신의 경험과 직관에 의존하여 리스크를 다루고 있을 뿐 공사와 관련된 요인을 체계적으로 분류하고 수치화하여 관리하는 곳은 거의 찾아 볼 수가 없는 실정이다. 따라서 본 논문에서는 건설 리스크 관리수준 향상을 위해 건설실패지수를 활용한 기업단위의 정량화 시스템을 설계하고, 이를 표준화하기 위한 정부 연계 시스템 구성에 대해 연구하였다.

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

A Study of Pre-assessment Framework for Business Environment for Delivering Projects in a New Overseas Market (해외 신규 시장의 프로젝트를 수행하기 위한 사업환경 사전조사 프레임웍에 관한 연구)

  • Oh, Jungkeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.78-90
    • /
    • 2015
  • Due to a significant decrease in the number of construction projects in the domestic market of Korea, overseas expansion of the Korean construction companies has been accelerated in recent years. However, the practice of bidding at a low price and lacking information about foreign new markets caused many companies to fail in their entries to these markets. As a measure to prevent such failures, this study has developed a framework which first defines the key research items that must be identified beforehand and then classifies them into a structured way so that the construction companies can actually use this framework to be better prepared for their forays into the new markets. The framework was actually applied for a construction project in Morocco, and its usefulness was proven by the user's successful participation into the project, nevertheless the application and result was limited. Although perhaps this framework should be applied to many more construction projects for its validity to be verified and for its structure to be better standardized, the framework still has its value due to the following two reasons: first, it has systemized the research items that had been only conceptually defined but had never been organized, and second it can be utilized as a investigation tool at the marketing stage.

A Framework for Identifying and Analyzing IT Project Risk Factors (IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구)

  • Jangho Choi;Chanhee Kwak;Heeseok Lee
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.87-110
    • /
    • 2017
  • Analyzing and finding the risk factors in information technology (IT) projects have been discussed because risk management is an important issue in IT project management. This study obtained the risk factor checklists with priorities, analyzed the causal relationship of risk factors, and determined their influences on IT project management. However, only few studies systematically classified IT project risk factors in terms of risk exposure. These studies considered both the probability of occurrence and the degree of risk simultaneously. The present study determined 53 IT project risk factors on the basis of literature and expert group discussions. Additionally, this study presented clustering analysis based on the data of 140 project managers. The IT project risk factor classification framework was divided into four areas (HIHF, HILF, LIHF, and LILF). The present results can be used to help IT project managers establish effective risk management strategies and reduce IT project failures. This study also provides academic implication because it considers both the probability of occurrence and the degree of influence of risk factors.