Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.

A Study about Improvement Idea for Performance-based Project Delivery system (성능발주방식의 개념 정의 및 활용방안에 관한 연구 - 공동주택 성능표시 제도를 바탕으로 한 발주자를 위한 체크리스트 -)

  • Lee, Ha-Seung;Baek, Hun-Ku;Shin, Seung-Ha;Lee, Jung-Won;Kim, Kyung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.634-637
    • /
    • 2008
  • Performance-based Project Delivery System(PPDS) is one of Project Delivery System that when owner ask for performance than constructor feel free to choose materials, technology, an engineering method. PPDS rank higher position than Performance Warranty Contract and Technical Proposal Bid. This study aims to propose Improvement Idea for PPDS that based Housing Performance Grading Indication System. 'Request-performance Checklist' is used as communication means(between owner and constructor) and a kind of corroborative facts make the procedures achievement of project like contract easier.

  • PDF

이슈 & 이슈 - 시설공사 물품구매 발주 관행 개선

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.269
    • /
    • pp.58-63
    • /
    • 2012
  • 국민권익위원회는 지난 11월 1일 공공기관이 물품구매와 관련한 계약을 할 때 생길 수 있는 불합리한 관행을 개선하기 위해 '물품구매 계약의 합리성 제고 방안'을 마련하여 관계 부처인 기획재정부 및 행정안전부에 제도개선을 권고했다. 권익위는 '국가를 당사자로 하는 계약에 관한 법률 시행령'에 시설공사와 물품구매 등에 대한 정의 규정을 신설하는 등의 발주방식 판단기준을 마련할 것을 권고했다. 또한 시설공사를 물품제조나 구매로 발주하지 못하도록 입찰공고 시에 발주방식 준수의무를 '정부 입찰계약 집행기준'과 '지방자치단체 입찰 및 계약집행 기준'에 포함하는 방안도 제시했다. 아울러 공사나 물품, 용역 등 계약 목적이 겹치거나 혼합될 경우에는 주된 목적으로 발주방식을 결정하도록 하는 내용을 계약법에 신설하는 방안도 권고안에 포함했다. 국민권익위 관계자는 "이번 개선안이 수용되면 물품구매계약 과정에서 발생하는 불합리한 관행 및 제도가 개선되어 물품구매 계약의 합리성이 제고될 것"이라고 밝혔다.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

A Study on Improvement of Report System between Government Agency and construction site (발주청과 건설현장간 보고체계 개선에 관한 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1383-1384
    • /
    • 2011
  • 본 연구는 건설현장에서 발주청으로 보고하는 주기적인 업무보고자료를 대상으로 오프라인이 아닌 온라인 보고방식으로 업무처리절차를 개선하고자 한다. 또한, 온라인 보고시에도 단순 보고형식에서 승인 반려체계를 도입하여 시공사는 감리단에게, 감리단은 발주청에게 승인요청절차를 거쳐 승인 또는 반려처리함으로서 온라인으로 업무처리가 가능하도록 발주청과 건설현장간에 보고체계를 개선하고자 한다.

A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF