Directions to Introduce Warranty Contraction for Pavements in Korea (도로포장 성능보증(Warranty)계약제도 도입방향)

  • Kim, Tae-Song;Koo, Jai-Dongl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.987-990
    • /
    • 2007
  • Warranty contracting is contracting methods that European Countries have applied to asphalt pavement projects from long ago, and in America as the expected effects of the warranty contracting are being verified to introduce it, the number of projects with warranty is being increased rapidly. In Japan, the warranty contracting suitable for Japanese style was established and is being applied. This study investigated and analyzed the present state of the warranty contracting being applied to European countries, America and Japan, and suggested advantages and disadvantages in introducing the warranty contracting into Korea and directions to introduce it. The principal result of this study is that performance bond contract system, performance surety bond system and performance bidding system should be established to introduce the warranty contracting into Korea.

  • PDF

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Market effects analysis of when lowering the threshold value of construction services under WTO GPA (WTO 정부조달협정 건설서비스 양허하한선 인하시의 건설시장 변화와 대응방안)

  • Moon, Hyuk;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.72-82
    • /
    • 2009
  • Lowering threshold value of construction services is extremely sensitive issue to the small and medium enterprises in construction industry. Because it means opening the construction markets where the small and medium construction companies compete intensely. Nevertheless, it is absent that the analysis on the effect of opening the market lowering threshold value of construction services under Government Procurement Agreements or Free Trade Agreement. This research is to analyze the effects of lowering threshold value of construction service which have been agenda repeatedly in the international agreements such as WTO and FTA. The current threshold value of construction services of Korea under WTO GPA are 5million SDR where the government delivers and 15million SDR where the local government or the public institution deliver. However major parties to an entente such as USA and EU have been demanding to lower threshold value of 15 million SDR where the local government or the public institution deliver to 5million SDR. The analysis figure the effect of this lowering threshold value to be a market reduction by 2trillion Won as '07 fiscal year basis. This market shrinkage will effect to the small and medium construction companies in local considerably.

협회소식

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.6 s.191
    • /
    • pp.16-27
    • /
    • 2006
  • 본회(4개 단체와 공동 연명, 국민연금∙건강보험제도 및 임금지급조서 제출제도 개선에 대한 탄원서 제출,국민연금ㆍ건강보험제도및 임금지급조서제출 제도개선탄원서)/ 자동제어협의회(제11차 자동제어설비공사협의회 및 자동제어전문분야 등록업체 간담회 개최, 최동호 상임부회장 취임)/서울특별시회(대표회원 조찬간담회 개최, 지방계약법 해설 강습회 개최, 2006년도 제1차 시공품질 현장점검 실시)/ 부산시회(2006 설비기술 세미나 개최)/ 울산∙경남도회(일용근로자 소득자료 신고 및 4대 보험 관련 간담회 개최)/ 충북도회(가스시설시공업 1종 회원사 간담회 개최)/ 강원도회(저소득층 자녀 학교 급식비 지원금 전달 및 기계설비 분리발주 건의, 제4회 회원 친목 단합대회 개최)

  • PDF

A Eco-friendly Construction Plan of bridge cross over and parallel to rivers (하천 병행 및 횡단교량의 친환경 건설계획)

  • Kim, Young-Sang;Ko, Seung-Young;Kim, Hyoung-Su;Min, Young-Taek
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.131-132
    • /
    • 2009
  • A road construction From Gyegok to Shinduk, korea was ordered for the alternative design by Jeollabuk-do, 2008. The propose of study is to introduce the planning process for a optimal eco-friendly design and construction of bridge cross over and parallel to rivers.

  • PDF

Risk Analysis in Tender Stage for Successful Construction Project in China (중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석)

  • Liu, Yue-Fei;Oh, Jae-Hun;Huh, Young-ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

Implementation Status of TPMS in GS E&C's Overseas Projects (GS건설 해외 Project의 TPMS 적용 현황)

  • Lee, Jun-Bok;Park, Chan-Jeong;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • GS E&C applies TPMS(Total Project Management System) to all construction projects. This system is applied to all overseas projects, it is successfully used not only GS E&C but also subcontractors, vendors and clients. TPMS collects data spontaneously that is used to each participant, improves effectiveness in construction projects and gives transparency to all participants while sharing same information. This paper is aimed to share successful case study focusing on document management system, and how to develop TPMS in the future.

  • PDF

A study on the regulation of durability standard of underground structures monitoring sensors (지하구조물 계측센서의 내구연한 기준에 대한 규정 분석 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.73-81
    • /
    • 2018
  • The purpose of this study is to research the regulation of durability standard of underground structures monitoring sensors. The durability criteria for construction monitoring sensors of domestic construction companies, the standard years of contents such as buildings on the income tax implementation regulations, and the standards of the Public Procurement Service for construction monitoring and construction machinery were analyzed. The durability criterion on products such as the inclination meter and the strain gauge, which are purchased from the Public Procurement Service prior to installation on the underground structure, is 8 to 10 years. It is considered that the monitoring sensor installed in the paperboard and the concrete structure at the time of construction will have considerably shortened service life rather than the useful life of the product itself due to various adverse factors such as groundwater influence and compaction.

The Development of Next Generation Smart PMIS System (차세대 스마트형 PMIS 시스템 개발)

  • Park, Kyung-Mo;Im, Chul-Woo;Kim, Chang-Duk;Jeong, Hyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.117-130
    • /
    • 2013
  • It is a difficult thing to administer a various task in the construction site because, the person placing an order are eagerly demanding for the reduction of project duration as the trend of construction are becoming larger and international. The advanced country have made an effort to development PMIS based on the Web, which to exchanges a various construction information such as Time Management/Construction Management/Resource Management/Document Management to solve these problems since 2000. However, the expectation to develop a smart PMIS that can deal with a more quick change of a various process are becoming lager as the lively supply of IT equipment such as smart phone and table PC. The research are aim to develop the next generation smart PMIS, which is link with the table PC and smart phone for a site manager to use the system based on the web in the movement. Also, it has an object in view to introduce the development process and the major function of the next generation PMIS.

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.