• Title/Summary/Keyword: 건설기준

Search Result 3,066, Processing Time 0.031 seconds

Project of Improving Good Agriculture Practice and Income by Intergrated Agricultural Farming (미얀마 우수농산물 재배기술 전수사업)

  • Lee, Young-Cheul;Choi, Dong-Yong
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.16 no.1
    • /
    • pp.193-206
    • /
    • 2014
  • The objectives of the project are to increase farmers' income through GAP and to reduce the loss of agricultural produce, for which the Korean partner takes a role of transferring needed technologies to the project site. To accomplish the project plan, it is set to implement the project with six components: construction of buildings, installation of agricultural facilities, establishment of demonstration farms, dispatching experts, conducting training program in Korea and provision of equipments. The Project Management Committee and the Project Implementation Team are consisted of Korean experts and senior officials from Department of Agriculture, Myanmar that managed the project systematically to ensure the success of the project. The process of the project are; the ceremony of laying the foundation and commencing the construction of training center in April, 2012. The Ribbon Cutting Ceremony for the completion of GAP Training Center was successfully held under PMC (MOAI, GAPI/ARDC) arrangement in SAl, Naypyitaw on June 17, 2012. The Chairman of GAPI, Dr. Sang Mu Lee, Director General U Kyaw Win of DOA, officials and staff members from Korea and Myanmar, teachers and students from SAl attended the ceremony. The team carried out an inspection and fixing donors' plates on donated project machineries, agro-equipments, vehicles, computers and printer, furniture, tools and so forth. Demonstration farm for paddy rice, fruits and vegetables was laid out in April, 2012. Twenty nine Korean rice varieties and many Korean vegetable varieties were introduced into GAP Project farm to check the suitability of the varieties under Myanmar growing conditions. Paddy was cultivated three times in DAR and twice in SAl. In June 2012, vinyl houses were started to be constructed for raising seedlings and finished in December 2012. Fruit orchard for mango, longan and dragon fruit was established in June, 2012. Vegetables were grown until successful harvest and the harvested produce was used for panel testing and distribution in January 2013. Machineries for postharvest handling systems were imported in November 2012. Setting the washing line for vegetables were finished and the system as run for testing in June 2013. New water tanks, pine lines, pump house and electricity were set up in October 2013.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

Deriving Key Risk Sub-Clauses which the Engineer of FIDIC Red Book Shall Agree or Determine according to Sub-Clause 3.7 -based on FIDIC Conditions of Contract for Construction, Second Edition 2017- (FIDIC Red Book의 Engineer가 합의 또는 결정해야할 핵심 리스크 세부조항 도출 -FIDIC Red Book 2017년 개정판 기준으로-)

  • Jei, Jae Yong;Hong, Seong Yeoll;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.239-247
    • /
    • 2023
  • The FIDIC Red Book is an international standard contract condition in which the Employer designs and the Contractor performs the construction. The Engineer of FIDIC Red Book shall agree or determine any matter or Claim in accordance with Sub-Clause 3.7 neutrally, not as an agent of the Employer. This study aimed to derive Key Risk Sub-Clauses out of 49 Sub-Clauses that the Engineer of FIDIC Red Book recently revised in 18 years shall agree or determine according to Sub-Clause 3.7 using the Delphi method. A panel of 35 experts with more than 10 years of experience and expertise in international construction contracts was formed, and through total three Delphi surveys, errors and biases were prevented in the judgment process to improve reliability. As for the research method, 49 Sub-Clauses that engineers shall agree on or determine according to Sub-Clause 3.7 of the FIDIC Red Book were investigated through the analysis of contract conditions. In order to evaluate the probability and impact of contractual risk for each 49 Sub-Clause, the Delphi survey conducted repeatedly a closed-type survey three times on a Likert 10-point scale. The results of the first Delphi survey were delivered during the second survey, and the results of the second survey were delivered to the third survey, which was re-evaluated in the direction of increasing the consensus of experts' opinions. The reliability of the Delphi 3rd survey results was verified with the COV value of the coefficient of variation. The PI Risk Matrix was applied to the average value of risk probability and impact of each of the 49 Sub-Clauses and finally, 9 Key Risk Sub-Clauses that fell within the extreme risk range were derived.

Assessment of future hydrological behavior of Soyanggang Dam watershed using SWAT (SWAT 모형을 이용한 소양강댐 유역의 미래 수자원 영향 평가)

  • Park, Min Ji;Shin, Hyung Jin;Park, Geun Ae;Kim, Seong Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4B
    • /
    • pp.337-346
    • /
    • 2010
  • Climate change has a huge impact on various parts of the world. This study quantified and analyzed the effects on hydrological behavior caused by climate, vegetation canopy and land use change of Soyanggang dam watershed (2,694.4 $km^2$) using the semi-distributed model SWAT (Soil Water Assessment Tool). For the 1997-2006 daily dam inflow data, the model was calibrated with the Nash-Sutcliffe model efficiencies between the range of 0.45 and 0.91. For the future climate change projection, three GCMs of MIROC3.2hires, ECHAM5-OM, and HadCM3 were used. The A2, A1B and B1 emission scenarios of IPCC (Intergovernmental Panel on Climate Change) were adopted. The data was corrected for each bias and downscaled by Change Factor (CF) method using 30 years (1977-2006, baseline period) weather data and 20C3M (20th Century Climate Coupled Model). Three periods of data; 2010-2039 (2020s), 2040-2069 (2050s), 2070-2099 (2080s) were prepared for future evaluation. The future annual temperature and precipitation were predicted to change from +2.0 to $+6.3^{\circ}C$ and from -20.4 to 32.3% respectively. Seasonal temperature change increased in all scenarios except for winter period of HadCM3. The precipitation of winter and spring increased while it decreased for summer and fall for all GCMs. Future land use and vegetation canopy condition were predicted by CA-Markov technique and MODIS LAI versus temperature regression respectively. The future hydrological evaluation showed that the annual evapotranspiration increases up to 30.1%, and the groundwater recharge and soil moisture decreases up to 55.4% and 32.4% respectively compared to 2000 condition. Dam inflow was predicted to change from -38.6 to 29.5%. For all scenarios, the fall dam inflow, soil moisture and groundwater recharge were predicted to decrease. The seasonal vapotranspiration was predicted to increase up to 64.2% for all seasons except for HadCM3 winter.

Study on the Strategy for Managing Aggregate Supply and Demand in Gyeongsangbuk-do, South Korea (경상북도 골재수요-공급 관리 전략 연구)

  • Jin-Young Lee;Sei Sun Hong;Chul Seoung Baek
    • Economic and Environmental Geology
    • /
    • v.57 no.2
    • /
    • pp.161-175
    • /
    • 2024
  • Aggregate typically refers to sand and gravel formed by the transportation of rocks in rivers or artificially crushed, constituting a core resource in the construction industry. Gyeongsangbuk-do, the largest administrative area in South Korea, produces various sources of gravel, including forest, land (excluding other sources), river, and crushed stone. As of 2022, it has extracted approximately 6.96 million cubic meters of aggregate, with permitted production totaling around 4.07 million cubic meters and reported production of about 2.88 million cubic meters. The aggregate demand in Gyeongsangbuk-do is estimated to be 12.39 million cubic meters according to the estimation method in Ready-Mix Concrete. From the supply perspective, about 120 extraction sites are operational, with most municipalities maintaining an appropriate balance between aggregate demand and supply. However, in some areas, there is inbound and outbound transportation of aggregate to neighboring regions. Regions with significant inbound and outbound aggregate transportation in Gyeongsangbuk-do are areas connected to Daegu Metropolitan City and Pohang City along the Gyeongbu rail line, showing a high correlation with population distribution. Gyeongsangbuk-do faces challenges such as population decline, aging rural areas, and insufficient balanced regional development. Analysis using GIS reveals these trends in gravel demand and supply. Currently in this study, Gyeongsangbuk-do meets its demand for aggregate through the supply of various aggregate sources, maintaining stable aggregate procurement. River and terrestrial aggregates may be sustained as short-term supply strategies due to the difficulty of longterm development. Considering the reliance on raw material supply for selective crushing, it suggests the need for raw material management to maintain stability. Gyeongsangbuk-do highlights quarries in the forest as an important resource for sustainable aggregate supply, advocating for the development of large-scale aggregate quarries as a long-term alternative. These research findings are expected to provide valuable insights for formulating strategies for sustainable management and stable utilization of aggregate resources.

Example of Legislation on the Space Relations of Every Countries in the World and Main Contents of the Space Exploration Promotion Act and Future Task in Korea (세계 각국의 우주관계 입법례와 우리나라 우주 개발진흥법의 주요내용 및 앞으로의 과제)

  • Kim, Doo-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.20 no.1
    • /
    • pp.9-43
    • /
    • 2005
  • The Korean government established her first "National Space Program" in 1996, and revised it in 2000 and 2005. As embedded in the National Space Program, Korea aims to become one of the world's top countries in space technology by 2010. All of 13 satellites are planned to be put into orbit as schematized, which include 7 multi-purpose satellites, 4 science satellites and 2 geostationary orbit satellites. The Space Center in Korea is to be built at Woinara-Do, Bongrae-Myon, Koheung-Goon, Junlanam Province on the southern coast of the Korean peninsular. The first phase of the construction of the space center will be finished by 2007 for launch of KSLV-l. This will make Korea be the 13th advanced country in space development having a launching site in the world. The "Space Center" will serve as the infrastructure for the development of space technology and related technology, and plan to launch a low earth orbit satellite in 2007. A second science satellite made in Korea will be launched from the space center by 2007. From 2010, the center will be operated on a commercial basis operating launch facilities for low-to mid-altitude orbit satellites. Since the 'Aircraft Industry Promotion Act' was replaced by the 'Aerospace Industry Development Promotion Acf of 1987, this Act had been amended seven times from 1991 year to 2004. Most of developed countries has been enacted the space law including the public or private items such as an (1)DSA, (2)Russia, (3)the United Kingdom, (4)Germany, (5)France, (6)Canada, (7)Japan, (8)Sweden, (9)Australia, (10)Brazil, (11)Norway, (12)South Africa, (13)Argentina, (14)Chile, (15)Ukrainian etc. As the new Space Exploration Promotion Act was passed by the resolution of the Korean Congress on May 3, 2005, so the Korean government has made the public proclamation the abovementioned Act on May 31, this year. This Act takes effect on December 1, 2005 after elapsing six months from the date of promulgation. The main contents of Space Exploration Promotion Act of 2005 is as the following (1)establishing a basic plan for promoting space exploration, (2)establishment and function of national space committee, (3)procedure and management of domestic and international registration of space objects, (4)licensing of launch by space launch vehicles, (5)lability for damages caused by space accidents and liability insurance, (6) organizing and composition of the space accident investigation committee, (7)Support of non-governmental space exploration project, (8)Requesting Support and Cooperation of Space Exploration, (9)Rescue of Astronauts and Restitution of Space Objects, etc.. In oder to carry out successfully the medium and long basic plan for promoting space exploration and to develope space industry in Korea, I think that it is necessary for us to enlarge and to reorganize the function and manpower of the Space Technology Development Division of the Ministry of Science & Technology and the Korea Aerospace Research Institute. Korea has been carrying out its space program step by step according to the National Space Program. Korea also will continually strengthen the exchange and cooperation with all the countries in the world under the principle of equality, friendship relations and mutual benefits. Together with all other peoples around the globe, Korea will make due contribution towards the peaceful utilization of space resources and promotion of human progress and prosperity.

  • PDF