An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

The Introductory Concept and Expected Effectiveness for Knowledge Management System Based on BPM (BPM 기반의 지식경영시스템 도입 개념과 기대 효과)

  • Kim, Tae-Han;Hwang, Doo-Won;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.859-863
    • /
    • 2007
  • Most of construction companies recognize importance of immaterial assets in an age of unlimited competition. And construction companies that are concerned about Knowledge Management have used the system of it for critical ability of company. But they used the system for the storage of construction knowledge. So, the present KM system was gradually under operating. To introduce KMS based on Business Process Management(BPM), the purpose of this study is to consider BPM and KMS through the existing researches. we deduce the concept for introducing KMS based on BPM and present the expected effectiveness of it. Finally, we present the prototype of system for KMS based on BPM.

  • PDF

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

A Work Process Model for a Quality Management in Steel Frame Work (철골공사의 품질관리 업무 프로세스 모델 개발)

  • Kim, Jong-Seong;Kim, Hyoung-Joong;Byun, Eun-Jung;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.150-158
    • /
    • 2007
  • As higher and bigger buildings, steel structure is so for a basic building structure. Quality management of the steel frame work is started from pre plan phase. And classification and relation of works is very important in quality management. The purpose of this study is developing a quality management model for the better quality management in a steel frame work. This model consider a interrelationship of works and $input^{\circ}{\S}utput$ information, and based on the actual condition of current quality management.

A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

A Development of Mechanism on Supply Chain Information Recognition among intelligent equipment for USN based construction supply chain management process (차세대 지능형 건설물류관리 프로세스 지원을 위한 지능형 장비 간 물류정보인식 메커니즘 개발)

  • Kwon, Sang-Hyuk;Shin, Tae-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Kwon, Soon-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.763-766
    • /
    • 2008
  • The success of a construction project depends on efficient construction supply chain and service informationalization as types and quantities of materials in construction industry geometrically increase because the size of the construction industry increasingly becomes huge, high-rise, and complex. However, the omission of data for each step and the lower effect occurs because of uncertainty and inaccuracy of information as compared to other industries. In addition, it takes many hours to manage the present material states. Currently, IT technology and various mobile devices are being developed through the automation system of next generation intelligent construction supply chain management for the effective supply chain information management but the confusion regarding the recognition and transmission of the supply chain information between the multiple materials and transportation equipment using the IT and wireless network technology occurred. Therefore, the objective of this study is to propose the recognition mechanism which can deduce processes which caused the confusion of the recognition and transmission with supply chain information and solve the problems originated from the processes so as to solve the problems related to the confirmation and the communication of the correct supply chain information.

  • PDF

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF