Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation (에이전트기반 시뮬레이션을 활용한 건설프로젝트 조직 내 협업과정의 이해)

  • Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.70-77
    • /
    • 2014
  • Collaborative processes among team members including communication, coordination, and information-handling processes either during pre-construction or project execution are required in order to accomplish the objectives of construction projects. However, current construction management practice does not explicitly take the effect of organizational aspects on project performance into account. This paper introduces a method to understand collaborative processes in an explicit and systematic fashion. An agent-based simulation of collaborative working processes within construction project teams was designed from game theory perspective and implemented. The simulation produced both individual behavior and network dynamics. Individuals represented as agents made efforts to improve performance by communication and coordinating with other members, and overall team network was emerged as a result of interactions among members. Interestingly, it was found that the tendency of forming cohesive subgroups increased when sustaining relations with between-group partners incurs higher cost. The primary contribution of this paper is that it presented an explicit approach to examining collaborative working processes in construction project teams and it extended existing computational organization and network studies by integrating individual behavior models and network models.

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF

XML-base Process Improvement for Change Order of Construction Steel Works (XML 적용 철골공사 설계변경 프로세스 개선)

  • Nam, Gyoung-Woo;Seo, Yong-Chil;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.64-72
    • /
    • 2006
  • The participants of steel works should exchange a variety of information with others through documents. However construction steel works in the multistage contract system has a difficulty in exchanging information through the documents promptly. So if the trouble as change orders arise, conducting steel works will take much time, and the participants may not discuss the trouble sufficiently. Consequently this study improved the current business process of steel works. And this developed business support system(XCOS) based on XML so that participants of steel works achieve a successful management of steel works through conducting business rapidly and correctly.

A Study On Construction Project Expected Effect Collaboration Business Design Management (협업 설계관리를 통한 건설 프로젝트 기대효과에 관한 연구)

  • Nam, Hye-Won;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.589-592
    • /
    • 2007
  • While it is these days, and is increased importance as opposed to design management in managing a construction business necessity as opposed to collaboration business design management between collaboration business business company is regarded as important. An object was put in deriving a flow of a design process about the design management business and a grasp, management element as opposed to management by reason of the first, building design business ability improvement by a study of a book hereby, and an alternative plan of collaboration business design management for use in design optimization of difficulty of a disagreement, workshop modification city design information chase between books by lack of collaboration business between things of each minimization, company was shown with, air in a base in problems grasp as opposed to a collaboration business design by the second" work-site operations and a design process management element. Therefore, this thesis is going to show expected effect of a project about collaboration business design management through systematic practical use about a collaboration business design.

  • PDF

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

U-City Construction Process Modeling based on UML (UML을 이용한 U-City건설사업 프로세스 모델링)

  • Lee, Sung-Pyo;Shin, Yong-Jin
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.467-470
    • /
    • 2009
  • U-City is the key element of the future knowledge-based society where every citizen will be benefited from the most advanced information technology. The following research reengineers the old process to define the rational and efficient process of the U-City construction project(BPR: Business Process Reengineering). In order to achieve the goal, identify and diagnose problem points, outline the improved plan, and readjust the managing system and process to propose better process. And Lastly, redefine the best efficient process by simple modeling using the UML(Unified Modeling Language). The goal of the systematic proposal is to make contributions to a base of the green growth to be the development of the Sustainable U-City.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.