• Title/Summary/Keyword: 건설공사 품질관리

Search Result 263, Processing Time 0.026 seconds

A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors (국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여)

  • Son Hyun-Duck;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.292-295
    • /
    • 2002
  • A purpose of subcontractor management succeed in construction project. Specially in the subcontractor management of quality management, it is necessary that subcontractors not only acquire ISO 9000 quality system certification but also continuously and without a break fulfill ISO 9000 quality system. As a result, we proposed that a general contractor play an important role in a manager of subcontractors to keep up the ISO 9000 duality system of subcontractors.

  • PDF

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

Analysis and Reduction for Risk factors of Construction Projects (건설공사의 리스크인자 분석 및 경감에 관한 연구)

  • Chung Byoung-Hwa;Chung Young-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.62-68
    • /
    • 2001
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce of construction period. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.

A study on the Construction Materials Management using RFID (RFID를 활용한 건설공사 자재관리 방안 연구)

  • Oh, Kun-Soo;Song, Jeong-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.1
    • /
    • pp.242-249
    • /
    • 2010
  • As the scale of domestic building construction becomes larger, more complicated and more specialized, demands for quality improvement, cost reduction and construction period shortening increase. Construction materials management becomes a main factor to perform the project successfully. Therefore, various researches using RFID(Radio Frequency Identification) are being studied to manage the construction materials efficiently. This research aims to suggest the method of construction materials management using RFID in apartment housing. First, the technical properties of RFID are grasped. Second, problems are extracted by analyzing the case studies and related research using RFID in construction field. Third, construction materials are classified according to the construction process and process of materials management is analyzed. Lastly, method of construction materials management using RFID is suggested. The results of this research are expected to contribute the improvement of construction productivity through effective material management.

품질인증제도의 정책방향

  • 윤교원
    • 월간 기계설비
    • /
    • s.66
    • /
    • pp.45-51
    • /
    • 1996
  • 설계 생산 및 서비스 등 일련의 산업활동을 최적상태로 유지와 관리가 가능한 ISO 9000 인증제도는 품질보증시스템에 관한 국제표준으로 세계 76개국에서 국가 규격으로 채택 운영중에 있으며, 동남아(싱가폴)와 중동 및 일본의 건설성은 96년부터 공공공사 입찰 참가자에 대하여 ISO 9000 인증을 의무화할 예정이다. 이렇듯 품질보증체제가 새로운 무역상 기술장벽으로 대두되고 있어 이에 대한 사전 대비책이 필요하다.

  • PDF

Analysis and Prevention Countermeasures of Claim factors in Domestic Apartment Construction (국내 아파트공사의 클레임요인 분석 및 예방대책)

  • Lim Jong-Chan;Song Yong-Sik;Kim sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2002
  • Claims are on an increasing trend in the domestic construction field with changes of negative thought about them. But there are still many factors of causing disputes Potentially due to old customs that an owner is predominant over a contractor. Unless these factors are solved, it is obvious that many disputes will occur henceforward. This study derives claim factors that must be solved first of all through analyzing how claim factors influence construction management factors such as time, cost, quality, and presents countermeasures that may prevent these claims.

  • PDF

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF