• Title/Summary/Keyword: 건설공사비관리

Search Result 654, Processing Time 0.021 seconds

A Study on Improvement through a Survey on the Condition of Construction Waste Treatment of Public Institutions (공공발주기관의 건설폐기물처리 실태조사를 통한 개선에 관한 연구)

  • Park, Jeong-Gwon;Lee, Myeong-Eun;Kim, Chang-Hak
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.141-150
    • /
    • 2022
  • The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.

Empirical Study for the Appraisal System of Execution Capacity using Correlation Analysis (상관관계분석을 이용한 시공능력평가 제도의 실증적 고찰)

  • Jeong, Keun Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.3-14
    • /
    • 2018
  • The system to appraise the execution capabilities of construction companies had been began as the Construction Contract Restriction System in 1958, was changed as the Construction Subcontract Restriction System in 1961, and finally has been operated as the Appraisal and Public Announcement of Execution Capacity (APAEC) from 1996. The APAEC system has been utilized as a firm and unique tool for assessing the execution capacities of construction companies despite many problems and continuous system changes. In spite of numerous studies to improve the APAEC system, however, efforts to analyze the system from the empirical point of view were insufficient. In this study, we analyze the status of APAEC system through analyzing correlations among assessment results of the APAEC, earned values of construction works, construction management performance indexes, and macroeconomic indexes for the past 10 years from 2007 to 2016. As a result of the analysis, it was found that Appraisal Value of Execution Capacity (AVEC) is excessively inflated in engineering and landscaping areas compared to Earned Value of Construction Work (EVCW) and the correlations between the AVECs and EVECs are not high in the areas of engineering, industrial equipment, and landscaping. In addition, technical appraisal values are excessively inflated in engineering and landscaping areas and correlations between AVEC and its components are high in the areas of engineering & building, industrial equipment, and large companies, but low in the areas of engineering, building, landscaping, and small and medium companies. Finally, the concentration of the AVEC is intensifying more and more and the concentration deteriorates construction management performance indexes and macroeconomic indexes. If we continuously improve the APAEC system based on the implications derived in this study, the APAEC system will be able to maintain it's position of a firm and unique means to access the execution capacities of construction companies.

Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency (교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구)

  • Kwon, O-Bin;Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.49-60
    • /
    • 2010
  • Cost Estimating allows each entity in a construction project to plan, distribute, and control its required construction cost for the project. However, existing 2D design based estimating has problems, such as inaccuracy and inefficiency caused by missing, duplicated, or erroneous calculations. In this situation, current estimations for school facilities have more difficulties in forecasting construction costs due to an inadequate work breakdown structure for BOQ (Bill of Quantity) and insufficient guidelines for Basis of Estimate. In this study, therefore, an effort was made to increase the efficiency of estimating for school facilities by applying a 3D modeling based BIM tool to quantity and cost estimates. In addition, this study suggested a reasonable work breakdown structure for BOQ that was appropriate when 3D modeling was applied, and verified it through a case study. The authors tried to provide a BIM-based estimating method for school facilities to obtain greater accuracy and efficiency by having more information in an earlier stage.

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

A Study on Variation Control in Building Construction Process (건축공사 공정중심의 변이관리에 관한 연구)

  • Oh Sang-Jun;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.117-126
    • /
    • 2001
  • The purpose of this study is to present a way of Variation Control in building construction process. The study suggest a way of the application method of shielding, decoupling concept and also Poka-yoke device to control variation that occurs from uncertainty in construction industry with lots of waste factors. The main contents of the study are as follows; (1) It's suggested strategy to apply shielding, decoupling as variation control technique. (2) Current Poka-yoke devices are investigated and analyzed. As a future research, it is required to study continuously on the more effective application method of Poka-yoke device and on existing examples in domestic construction sites for the process improvement.

  • PDF

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation (운반작업의 영향요소분석을 통한 덤프트럭의 운반속도 산정방법에 관한 연구)

  • Park, Hyeon-Yong;Tae, Yong-Ho;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.97-105
    • /
    • 2007
  • In many construction projects, such as dams, highways, airports, buildings, industrial plants, and sewerage and drainage systems earthmoving operation is defined the movements of a certain quantity of earth to alter the surface configuration or conditions so that projects requirement can be met. Accurate calculation of travel time is essential for determining productivity of earthmoving operations, and for ultimately selecting the most cost-effective fleet configuration for executing the work. Also transportation work that utilizes dump truck consists average So in the whole expenses earthmoving operation, and is an important cost factor for cost management. Therefore this study proposes a methodology for optimum transfer speen based on the analysis of factors affecting earthmoving operation in different road types by collecting the sources of dump truck running speeds and considering the main factors affecting the earthmoving operation.

A Study on Economic Evaluation Method of Coupler Splice for High Strength(SD500) Reinforcement (SD500 고강도 철근용 커플러이음의 경제성 평가에 관한 연구)

  • Kim, Jae-Yeob;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.136-145
    • /
    • 2007
  • This study analyzes the current usage of SD500 high-strength re-bar in domestic construction sites. Also, an evaluation method was developed to measure economic efficiency of lap splice and coupler splice, which are most commonly used in connection SD500. The evaluation method was applied to construction sites in Seoul in December 2006, and the result revealed that coupler splice is relatively superior in terms of cost efficiency when the re-bar diameter is bigger and the concrete strength is lower.

Application and Adequacy Evaluation of Mobile Sewage Treatment Facilities for Concrete Wastewater Treatment Generated during Construction (공사 중 발생되는 콘크리트 폐수처리를 위한 이동식 오수처리 시설의 적용 및 적정성 평가)

  • Wooseok Jeong;Kyungik Gil
    • Journal of Wetlands Research
    • /
    • v.25 no.2
    • /
    • pp.91-98
    • /
    • 2023
  • Some concrete wastewater generated during construction is in the form of non-point pollution sources that workers, managers, and users are unaware of, and it is not easy to manage as it flows through sewage pipes. Due to these characteristics, construction sludge is inflow into rivers and sewage pipes in the form of non-point pollution sources in an unmanaged state. This study applied the D.W.S method to the concrete retaining wall removal method installed on the road, and the resulting concrete wastewater was physically and chemically treated through a mobile sewage treatment facility, and it was examined whether it met the removal efficiency and wastewater discharge acceptance standards. Accordingly, it is intended to meet the standards for effluent concentration of wastewater during construction by removing 73.5% of BOD and 89.1% of SS through physical and chemical treatment through portable sewage treatment facilities during construction. In addition, we would like to review the adequacy and economic analysis of calculating environmental conservation costs for physicochemical treatment through portable sewage treatment facilities and sewage treatment generated during construction.