A Study on the Guideline of construction cost according to Size of position and Regional characteristics of New Public Libraries (신축 공공도서관의 지위적 역할에 따른 규모와 지역 특성에 따른 건립공사비 기준에 관한 연구)

  • Lee, Chul-Jae;Yun, Ji-Won;Lee, Min
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.113-120
    • /
    • 2017
  • As the functions and roles of public libraries expand, it is time for qualitative growth. In order to improve the quality of public libraries, it is important to plan actual construction costs through systematic feasibility study. Therefore, the purpose of this study is to present the guideline of construction costs considering the size and regional characteristics according to the status role of the new public libraries. The construction costs are based on actual data. The results of the study are as follows. First, we derived the analysis framework according to the size and regional characteristics. The status role of the public libraries was considered theoretically. The size was classified according to status role of the public libraries. Regional characteristics were classified through literature review. Through this, an analysis framework was derived according to size and region. Second, the actual data on construction costs of the new public libraries were examined and analyzed. Basic factors, size, area, and construction costs were analyzed for 285 libraries nationwide that opened from 2010 to 2016. The data of 129 newly opened public libraries were classified. To present construction costs depending on price fluctuation, construction cost index was analyzed as of September 2016. Third, a guideline of construction costs for new public libraries was suggested. The construction cost per $1m^2$ of building area was analyzed. By multiplying 116.70(p), the construction cost index, the construction cost per $1m^2$ of total building area was calculated to be 2,472,350 won. When applying the research result, construction costs can be gained by adding construction cost index of the month.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

A Study of Establishing the Plan of Lodging for the Workers of Gaesung Industrial Complex (개성공단 근로자 기숙사 건립 계획 연구)

  • Choi, Sang-Hee;Kim, Doo-Hwan;Kim, Sang-Yeon;Choi, Eun-Hee
    • Land and Housing Review
    • /
    • v.6 no.2
    • /
    • pp.67-77
    • /
    • 2015
  • Now that it is the current situation that the smooth supply and demand are necessary for 2nd phase of beginning construction and stable development of Gaesung Industrial Complex, this study was willing to offer the planning criteria and model to establish the lodging for the workers in Gaesung Industrial Complex based on the agreement that both South and North Korea agreed in 2007. Regarding the plan, its standard and the alternative were reviewed considering welfare of workers, economic efficiency, technical validity, possibility of agreement and long-term development. The exclusive area per capita was calculated through Labor Standards Act of Korea and status survey of lodging for the workers provided to border line area between China and North Korea and the economic alternative based on one room for 6 persons with the public restroom was compared with that of development type based on one room for 4 persons with indoor restroom. Especially regarding the proposed site, the area with the optimized position was set by considering gradient, accessibility and convenience of development out of the area of Dongchang-ri where was agreed already and the priority of the proposed site that can keep the existing building site and provide was offered. The necessary period for whole construction was set as approximately 36 months. Regarding construction method, RC Rahmen method was selected as the optimized alternative considering the workmanship of manpower of North Korea and conditions of supply and demand of materials and cluster-type vehicle allocation plan based on 4~6 units considering the efficiency of supplying service facilities and convenient facilities along the simultaneous accommodation of 15,000 people was offered. It was analyzed that total business expenses of approximately 80~100 billion Korean Won would required though there were the difference for each alternative in the charged rental way that the development business owner develops by lending the inter-Korea Cooperation Fund and withdraws the rent by the benefit principle. The possibility of withdrawing the rent was analyzed assuming that the period of withdrawing the investment is 30 years. Especially for the operation management after moving, the establishment of the committee of operating the lodging for the workers of Gaesung Industrial Complex (tentative name) was offered with the dualized governance that the constructor takes charge of operational management, collecting fees and management of infrastructure and human resource management is delegated to North Korea.