• Title/Summary/Keyword: 거푸집작업

Search Result 80, Processing Time 0.031 seconds

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects (공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스)

  • Koo, Kyo-Jin;Cho, Dong-Hyun;Lee, Jun-Ho;Park, Sang-Hun;Park, Chan-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

Productivity Assessment of Form Works According to Work Elements (공동주택 거푸집공사의 작업요소별 생산성 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Young-Joo;Ha, Min-Su;Kim, Jin-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.161-163
    • /
    • 2010
  • In this study, it was accomplished the analysis of apartment house shape and the work factor productivity of the form work for the application of rational construction cost in apartment house. The form work is highly depended on the manpower in frame construction, and it has been a high impact during estimating of frame work cost.

  • PDF

Correlation between Working tools and musculoskeletal disorders of Formwork (거푸집공사에서 사용되는 작업공구와 근골격계 질환의 상관관계 분석)

  • Kwark, Dong Jin;lim, Jung-Min;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.57-58
    • /
    • 2012
  • Work to repeat the work using the tool since many occupational diseases such as musculoskeletal disorders, such as occupational low back pain is increasing. To solve this problem, previous(or existing) studies for improving the environment of construction workers are working, but the previous study was lack of approach that applied to condition of construction field. Thus, the objective of this paper will analysis the Correlation of musculoskeletal disease which is caused by Working Hand and Working Type for workers. The results of this Research through a die to improve the work environment of workers and prevention of musculoskeletal disorders in order to prepare is to provide basic data.

  • PDF

Study installing a manhole to on-site methods to assemble as use polymer concrete segment (폴리머 콘크리트 세 그먼트를 이용한 현장 조립식 맨홀 설치 연구)

  • Kim, Dong-Hun;Han, Jin-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.315-319
    • /
    • 2007
  • 지하에 설 치된 맨홀의 구조물이 노후되거나, 내부에 수 용된 시설물로 작업 공간이 협소하여 맨홀 구조물을 대개체 할 펼요가 있을 경우, 지금까지는 대부분 현장 콘크리트 타설에 의한 방법을 사용하였다. 이러한 방법은 거푸집 시공, 콘크리트 타설, 콘크리트 양생, 거푸집 철거 등의 공정이 소요되어 공사 기간이 장기화 되고, 도심지에 위치한 맨홀인 경우에는 차량과 보행자의 통행 불편을 초래하기도 하였다. 또한, 통상적으로 사용되고 있는 프리캐스트 맨홀에 비해 시공 품질이 낮아 향후 맨홀의 운용 및 유지관리에 많은 어려움을 겪는 원인이 되기도 하였다. 본 논문에서는 이러한 문제점들을 해결하기 위해, 폴리머 콘크리트를 이용하여 하부, 벽체, 상부로 구성된 다수의 세그먼트를 생산한 후, 현장에서 이들 세그먼트를 조립하여 맨홀을 설치하는 방법을 연구하였다. 가변형 거푸집을 이용한 세그먼트 제작과 조립식 블록에 의한 관구를 사용하여 현장 적용성을 높임은 물론, 프리캐스트로 생산되는 폴리머 콘크리트 맨홀 수준의 시공 품질을 확보할 수 있도록 하였다.

  • PDF

USN-based Real-Time Monitoring System for a Temporary Structure of Concrete Formwork (콘크리트 거푸집 가설구조물 공사 안전관리를 위한 USN 기반의 실시간 모니터링 시스템)

  • Moon, Sung-Woo;Yang, Byong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2D
    • /
    • pp.159-166
    • /
    • 2012
  • During concrete placement, the formwork structure supports the weight of concrete mass. The complexity of the operation can cause concentrated workloads, which in turn brings about a collapse of the temporary structure. As a countermeasure, the operation needs to be constantly monitored to maintain safety and prevent accidents. This paper presents a USN (Ubiquitous Sensor Network)-based safety monitoring system for formwork construction. The system takes advantage of ubiquitous technology in monitoring the behavior of the formwork structure such as deflection, load weight, and tilting. The collected data are sent to the host computer wirelessly for real time monitoring. The data can be then compared with the allowed limits on guidelines. The comparison can indicate whether the concrete placement operation is executed in a safe condition.

Productivity Analysis and Improvement of the System Form Construction in the Apartment Housing Project (공동주택 SYSTEM FORM 공사의 생산성 분석 및 향상방안 제안)

  • Kim Do-Hyeong;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.101-109
    • /
    • 2001
  • Application of system form is very effective to continuous horizontal or vertical walls of the apartment housing. Though the system forms that are used in the construction field have the advantage of concrete quality improvement and increasing number of usages, there are some problems in reaching early planning scheduling goal due to schedule delay and low productivity. This study is initiated to solve the problem and suggest some improvements searching for reasons that diminish the productivity. A case study was done in apartment construction field where system form was used and the productivity is analyzed by work sampling. Finally, productivity improvements for assembly of the form, internal form and external form are suggested, respectively.

  • PDF

Cost Analysis of Construction Phase in Basement Composite Wall Form (지하 합벽 거푸집의 시공단계별 원가 분석에 관한 연구)

  • Choi, Oh-Young;Heo, Kyoung-Moo;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.189-195
    • /
    • 2009
  • Recently, the urban centralization phenomenon appears to be growing. As a result, many vigorous efforts for the use of underground space are being made. In particular, the basement depth of construction in the downtown area has deepened and construction is often done close to adjacent buildings. In this case, generally, the underground construction approach mainly used is the composite basement wall system. However, a cost analysis of the basement composite wall system does not exist. Therefore, in this study, the cost of the composite basement wall system was analyzed. The percentage breakdown of costs were: buttress work processes, 3% form work processes, 26% reinforcement work processes, 12% support work processes, 42% and other processes,17%. Accordingly, it will be necessary when developing new technology and construction methods to determine the development focus.

Performance Evaluation of Recycled Synthetic Resins Euro-form by Injection Modeling Method (합성수지계 사출성형 재생유로폼의 성능 평가에 관한 연구)

  • Chung, Byeung-Yeul;Lee, Hyun-Chul;Kim, Jun-Hee;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.105-113
    • /
    • 2010
  • Method or work type improvement is needed in relation to reducing cost and increasing efficiency by ensuring construction quality and reducing labor in the form work process. This would have a great influence on the entire construction process, and make the process of adopting materials and methods more rational and economic. Hence, this study aimed to develop a Synthetic Resins Euroform that could improve durability, water-proofing, sophistication, and organizational unity through the use of injection modeling. Accordingly, this paper first investigated various performance requirements and necessary techniques, and then verified feasibility by evaluating the physical safety and technical validity when it is applied to construction field. In addition, this study evaluated the constructability, safety performance, environmental performance, and systemic excellence in terms of maintaining convenience of Synthetic Resins Euroform. Moreover, to verify feasibility in the construction field, this study analyzed and evaluated the maximum stress by measuring the load and deformation of the space of the horizontal furring, which is attached to Euroform as an armature.