• Title/Summary/Keyword: 갱폼 공정

Search Result 2, Processing Time 0.017 seconds

Checklist Development for Preventing of Major Accidents of Formwork Using Gang-form (갱폼 공사 중대재해 사고 예방을 위한 체크리스트 개발)

  • Jeong Kyeongtae;Kim Siyu;Oh Jeongeun;Lee Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.5 no.1
    • /
    • pp.9-16
    • /
    • 2023
  • Gang-foam is used in many construction projects because it is not only precise in terms of vertical, horizontal, and specifications, but also easy to install and dismantle. However, major accidents occur every year due to non-compliance with safety rules and work order, also manuals and checklists currently in use are insufficient. Thirty-seven surveys was conducted by analyzing major accident cases of domestic gang-form construction project and deriving 20 risk factors and 43 check points. Based on the survey, the importance and appropriateness of check points were evaluated. As a result of this study, a checklist was presented, check points were placed in the order of importance based on assembly, installation, dismantling, and lifting of the Gang-form process. The checklist was organized so that workers could comply with safety rules and work order. Through this, it is expected to prevent major accidents and contribute to efficient safety management.

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.