Development of the Model Using Queueing Theory for Lifting Planning in Tall Buildings (큐잉이론을 이용한 고층건물 가설리프트 계획모델 구축에 관한 연구)

  • Lee, Hak-Ju;Kim, Dae-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.628-633
    • /
    • 2008
  • Tall building construction has been increasing due to the need to maximize land usage. It causes the increase of vertical transportation for workers and materials, which significantly affects the productivity and lifting planning, therefore, has to be made carefully based on the characteristics of the field. However, the existing method to calculate the number of lift is too simple to consider complex and various characteristics in tall building construction. Accordingly, we developed the model for selecting the best system of vertical transportation by using Queueing theory. To find out the situation of the queue of resources such as material and workers, a simulation program will be applied.

  • PDF

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction (고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델)

  • Ahn Byung-Ju;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.47-58
    • /
    • 2001
  • Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

  • PDF