• Title/Summary/Keyword: 가동중정비

Search Result 31, Processing Time 0.031 seconds

Development of Maintenance Effectiveness Monitoring Program for APR1400 Safety Related Systems (APR1400 안전관련계통 정비효과감시 프로그램 개발)

  • Yeom, Dong Un;Hyun, Jin Woo;Song, Tae Young
    • Journal of Energy Engineering
    • /
    • v.23 no.2
    • /
    • pp.191-198
    • /
    • 2014
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. MR programs are developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has developed the MR program for APR1400 safety related systems to establish the advanced maintenance system and will verify the suitability of the MR program through evaluating initial performance. Consequently, it is expected that the safety of the new plant will be improved by developing and implementing the MR program.

How to Manage Aging Aircraft (노후 항공기 관리방안)

  • Choe, Se-Jong;Kim, Cheon-Yong
    • 한국항공운항학회:학술대회논문집
    • /
    • 2016.05a
    • /
    • pp.202-208
    • /
    • 2016
  • 최근 5년간 발생한 국적 항공기 사고 23건 중 헬기사고가 16건으로 전체 항공사고의 70%를 차지한다. 현재 국내에서 고정익 항공기 549대, 회전익 항공기 186대가 각각 운영(군 경찰 보유헬기 제외)되고 있음을 감안하면 회전익 항공기 사고가 훨씬 높은 편이며, 고정익 항공기 가동시간에 비하여 가동률이 매우 낮은 회전익 항공기를 고려하면 비행시간당 항공기 사고 비율은 회전익 항공기가 월등하게 높은 편이다. 또한 고정익 항공기의 평균기령은 10.9년인데 비하여 산림항공본부를 비롯한 헬기운영업체에서 운영 중인 회전익 항공기의 평균기령은 18.9년으로 회전익 항공기가 전체적으로 노후화 되어 있으나, 국적항공사에 운영 중인 노후 항공기 관리프로그램을 회전익 항공기 운영사에서는 운영하지 않고 있다. 따라서 본 연구를 통하여 노후 항공기 운영현황을 검토하여 노후 회전익 항공기 운영기준을 수립하고 노후 회전익 항공기의 정비프로그램을 정립하여 회전익 항공기의 지속감항성을 확보할 수 있는 방안과 수명주기 설정을 마련하고자 한다.

  • PDF

The Flood Elevation Reduction Effect by Sluice Operation at Multistage Movable Weir System (다단식 하단방류형 가동보 수문시스템에서 수문개도 조작에 의한 홍수위 저감효과)

  • Lee, Ji Haeng;Han, Il Yeong;Ra, Sung Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.367-367
    • /
    • 2016
  • 우리나라는 하상계수가 큰 하천의 특성 때문에 콘크리트 구조의 고정보를 설치하여 하천수위를 유지하고, 취수용으로 사용하여 왔다. 그러나 고정보는 유수방해, 토사퇴적으로 인한 홍수위 상승 등의 다양한 문제를 야기시키고 있다. 이에 따라 4대강에는 다양한 형상과 운영방식이 적용된 가동보가 설치되었으며, 소하천과 중규모 하천 역시 하천기능의 복원을 위한 정비사업이 진행되고 있다. 하천관리의 목표는 하천의 이수, 치수 및 생태환경 기능의 종합적이며, 유기적인 관계를 조화롭게 유지하면서 각 기능을 극대화시키는 것이다. 우선, 토사의 퇴적을 사전에 예방하고, 퇴적된 토사는 유수에 따라 배출될 수 있도록 하단방류 형식으로 개선되어야 한다. 또한 홍수기에는 통수가 원활하도록 보의 기능을 해제할 수 있어야 하는 한편, 하류구간이 범람하지 않도록 상류구간에서의 완충기능을 가져야 한다. 이러한 요구조건을 충족하기 위해서 다단형태의 하단방류형 가동보 수문 시스템을 고려할 수 있다. 다단형태의 하단방류형 가동보 수문시스템은 경사 하천에 가동보에 의해 물을 저수하고, 저수된 물을 보 상류에서 유입되는 유입수량 만큼만을 수문 하단 개도부를 통하여 방류하도록 하여, 일정량이 항상 저류되면서 퇴적토사가 배출되도록 하여 수질을 개선하는 방식이다. 본 연구에서는 금강의 지류인 치성천 9Km 구간을 대상으로 HEC-RAS 4.1 모형을 적용하여 하단방류형 가동보를 하류부터 상류구간까지 다단형태로 설치하였을 경우, 하천의 저류와 분배기능 회복에 따른 홍수위 저감 효과를 고정보 설치의 경우와 비교 분석하였다. 홍수소통 능력을 검토하기 위해서 연구대상 구간을 200년 빈도의 확률홍수량 별로 10개 구간으로 나누어 검토한 결과, 고정보 설치의 경우에는 여유고 기준을 초과하는 부분이 나타났으나, 다단식 하단방류형 가동보를 설치하고, 수문개도를 조작하여 운영할 경우에는 여유고 기준을 초과하는 부분이 없어, 홍수위 저감 효과를 기대할 수 있는 것으로 나타났을 뿐만 아니라, 홍수기이후에도 하천유지용수 기준을 만족하는 것으로 나타났다. 또한 설치 및 유지관리의 비용측면과 용수확보 및 홍수피해 절감의 편익측면에서도 50년 운영주기의 비용편익성은 양호한 것으로 나타났으며, 생태환경보전과 친수공간 확보측면의 편익성을 추가로 고려할 경우, 경제성은 충분히 확보될 것으로 판단되었다.

  • PDF

Analysis of Flow Characteristics According to Operation of Movable Weir Gate (가동보 수문 운영에 따른 흐름특성 분석)

  • Seo, Il-Won;Kim, Sung-Eun;Shin, Jae-Hyun;Kim, Tea-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.143-143
    • /
    • 2011
  • 4대강 살리기 사업에서 국가하천 주요 구간에 대규모 보가 건설되고 있다. 이로 인해 치수 및 하천환경에 많은 문제점이 야기될 수 있으며, 발생 가능한 하천관리의 문제점을 최소화하기 위해서는 하천정비에 따른 수리학적 영향을 검토할 필요가 있다. 보의 설치는 유지유량 및 수심 확보의 목적을 지니고 있지만, 기존 하천에 설치된 보는 대부분 고정보로서 흐름의 정체를 유발시키는 단점이 있다. 최근에는 가동보가 설치되어 일정 이상의 초과 유량 및 수위를 조절할 수 있도록 탄력적인 보 운영이 이루어지고 있다. 본 연구에서는 낙동강 본류에 건설 중인 강정보 설치지점 직상 하류 구간에 대하여 가동보의 설치 및 운영에 따른 보주변의 흐름특성을 RMA2와 FLOW-3D를 이용하여 모의하였다. 2개의 수문으로 구성되어 있는 강정보의 수문 운영을 2년 빈도 및 100년 빈도 홍수량에 대하여 좌측 또는 우측 단일수문 완전개방 및 부분개방, 양측 수문의 완전개방 및 부분개방에 따른 보 상류단 수위의 변화 및 하류단에 형성되는 주흐름의 변화를 분석하였다. 2년 빈도 홍수량에서의 가동보 지점의 유속이 100년 빈도 홍수량에 대한 가동보 지점의 유속보다 크게 발생하였다. 양측 수문을 완전히 개방하였을 때 주흐름이 우안방향으로 휘는 현상이 발생하였으며, 우측 수문 단일개방에서 주흐름의 우측 휨 현상이 뚜렷이 나타나고 있어 양측 수문 개방에서의 주흐름이 우측 수문에서 발생되는 흐름에 의해 지배되고 있는 것으로 판단된다. 100년 빈도 홍수량에 대한 모의에서 수문 개방방식에 따른 보 상류부의 홍수위 변화가 크게 나타나지 않았으며, 2년 빈도 홍수량에서는 수문 개방 방식에 대한 보상류의 수위가 차이를 보였다. 가동보의 $30^{\circ}\sim60^{\circ}$ 부분개방에 대한 모의결과에서는 부분개방의 정도가 커짐에 따라 수문 지점에서의 유속이 크게 발생하였다.

  • PDF

FEG Development of MCR HVAC System for NPP (원자력발전소 주제어실 공기조화계통 기능적설비그룹 개발)

  • Hyun, Jin Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.21-25
    • /
    • 2012
  • Functional Equipment Group(FEG) of Nuclear Power Plant(NPP) is the bundling of multiple equipment subcomponents around a major equipment with a common system isolation characteristic or out-of-service consideration. The main purpose of FEG is to reduce out-of-service time to enhance maintenance effectiveness. KHNP(Korea hydro & Nuclear Power Co.) needs to develop these FEGs to successfully perform On-line Maintenance(OLM) which will be expected to institute in the future. Recently, there has been growing interest in OLM in KHNP. The aim of this paper is to suggest the way of FEG development and to build the FEG of MCR(Main Control Room) HVAC(Heat, Ventilation and Air Conditioning) system. The results of this study might be make good use of OLM and be helpful for equipment maintenance for MCR HVAC system.

Development of Engineering Program for APR1400 Feedwater Supplying System (APR1400 급수공급계통 엔지니어링 프로그램 개발)

  • Yeom, Dong Un;Ju, Tae Young;Hyun, Jin Woo
    • Journal of Energy Engineering
    • /
    • v.26 no.2
    • /
    • pp.12-22
    • /
    • 2017
  • Korea Hydro & Nuclear Power Co. (KHNP) has implemented engineering programs for operating nuclear power plants. Engineering programs are maintenance rule (MR), functional importance determination (FID), single point vulnerability (SPV) and functional equipment group (FEG). Recently, KHNP has developed engineering programs for APR1400 feedwater supplying system to establish the advanced engineering system and will verify the suitability of engineering programs through implementing in new nuclear power plant. Consequently, it is expected that the reliability of APR1400 feedwater supplying system will be improved by implementing engineering programs.

Development of an Integrity Evaluation System (WIES) for Fuel Channels in CANDU Reactors (중수로 연료관 건전성 평가시스템(WIES) 개발)

  • Choi, Sung-Nam;Kim, Hyung-Nam;Yoo, Hyun-Joo;Kwon, Dong-Kee;Hwang, Won-Gul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.9
    • /
    • pp.1273-1279
    • /
    • 2010
  • Pressure tubes at the CANada Deuterium Uranium (CANDU) nuclear power plants are periodically inspected in accordance with the CSA N285.4 code. If flaws that do not satisfy the criteria given in CSA N285.4 are detected, the code permits a fitness-for-service assessment to determine the acceptability of the flawed pressure tubes. In this paper, the Wolsong In-service Evaluation System (WIES) is introduced; this system has been developed for the assessment of the flawed pressure tubes and is based on CSA N285.8. Since the system evaluates the integrity of flawed pressure tubes exactly and promptly during an in-service inspection, it will help in operating the Wolsong nuclear power plants without prolonging the outage period.

A Study on the Significance of Unit Capacity Factor (Utilization Rate) of Nuclear Power Plants and Measures for Increasing (원전 이용률의 의의 및 증진방안 고찰)

  • Don Kug Lee;Chi Bum Bahn
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.18 no.2
    • /
    • pp.87-100
    • /
    • 2022
  • Unit capacity factor (utilization rate) of nuclear power plants (NPPs) is an important performance indicator. Since the first commercial operation of Kori Unit 1 began in April 1978, the utilization rate of domestic NPPs has gradually increased, reaching 90% from the end of the 1990s. However, due to various issues such as the Fukushima accident in 2011, corrosion of the CLP, the utilization rate dropped to 65~80%. In the early 1980s, the utilization rate of the U.S. NPPs was around 60%. However, since 2004, it has been consistently maintained above 90%. Therefore, in this study, we first examined the causes of declining the utilization rate in domestic NPPs. Next, the significances of the utilization rates are reviewed in five aspects: investment capability, electricity rate, safety and export, etc., with discussion on the current status of the utilization rates in the U.S. Based on this, three key factors are derived as the reasons of the increasing: equipment reliability program, on-line maintenance and the pursuit of institutional rationality. And finally, by synthesizing above results, the measures for increasing the utilization rate of domestic NPPs are proposed in terms of equipment management, institutional improvements, and personnel resources.

Integrated System Design of Stream Generator Tube and Chemistry Inspection Information for Nuclear Power Plant (원전 증기발생기 세관 및 수질 검사정보 통합시스템 설계)

  • 신진호;이봉재
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.10c
    • /
    • pp.271-273
    • /
    • 2002
  • 증기발생기(SG : Steam Generator)는 다수의 세관으로 구성되어 원자로에서 발생한 열을 이용하여 발전기 터빈을 구동시키는 원동력인 증기를 생성해 주는 기능을 하는 원자력발전소의 핵심 설비이다. 증기발생기 세관의 건전성을 확보하기 위해 매주기 계획예방정비, 즉 가동중 검사마다 정기적인 와전류 검사를 수행하고, 검사결과에 따라 전열관 보수 등과 같은 제반 조치를 취하고 있다. 현재 검사데이터 DB 구축은 일부 발전소에 개발되어 운영 중에 있고, 세관 DB와는 별도로 통계정보만을 관리하는 증기발생기 성능관리시스템이 운영되고 있으며, 또한 각 발전소마다 수질을 계측하여 수화학 성분을 감시하는 수질관리시스템이 운용되고 있다. 이러한 이원화된 DB 및 시스템을 통합하고 연계하여 전 원전의 증기발생기를 종합적으로 관리 할 수 있는 시스템의 필요성이 대두되었다. 따라서 본 논문에서는 현장에 보관되어 있는 모든 세관 검사데이터를 취득하여 대용량 데이터베이스를 설계 및 구축하고 이기종의 분산된 수질관리시스템 DB를 연계하여, 증기발생기의 설계/제작부터 검사결과 Mapping, 추이 분석을 통한 수명 평가에 이르는 전 과정을 통합 관리할 수 있는 시스템을 설계하고 그 구현방안을 제시한다.

  • PDF

Review on the Working Hours of Radiation Work Plan for ECT through In-service Inspection (원전 가동중 ECT 검사 방사선 작업시간 고찰)

  • Chae, Gyung-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.