• Title/Summary/Keyword: , AHP 분석

Search Result 1,881, Processing Time 0.026 seconds

Implementation of Management performance Analysis System with KDD (KDD에 기반한 경영성과 분석 시스템 구현)

  • An, Dong-Gyu;Jo, Seong-Hun
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.575-592
    • /
    • 2004
  • In modern dynamic management environment, there is growing recognition that? information & knowledge management systems are essential for CEO's efficient/effective decision making. As a key component to cope with this current, we suggest the management performance analysis syystem based on Knowledge Discovery in Database (KDD). The system measures management performance that is considered with both VA(Value- Added), which represents stakeholder's point of view and EVA(Economic Value-Added), which represents shareholder's point of view. The relation ship between management performance and some 80 financial ratios is analyzed, and then important financial ratios are drawn out. In analyzing the relationship, we applied KDD process which includes such as multidimensional cube, OLAP(On-Line Analytic Process), data mining and AHP(Analytic Hierarchy Process). To demonstrate the performance of the system, we conducted a case study using financial data over the 16-years from 1981 to 1996 of Korean automobile industry which is taken from database of KISF AS(Korea Investors Services Financial Analysis System).

  • PDF

A Case Study on Reason Analysis for Schedule Delay of Apartment House (공동주택의 공기지연 원인분석 사레 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

Value Engineering Approach for Heat Curing Method Under Cold Weather Condition (한중콘크리트 보온양생 공법에 대한 VE분석)

  • Woo, Dae-Hun;Kim, Tae-Cheong;Kim, Jong;Jeon, Chung-Keun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.21-23
    • /
    • 2010
  • This study was conducted to draw various decisive elements of a reasonable heat curing method and to examine the importance in deciding a construction method when constructing cold weather concrete. As a result, the items proposed as important elements at the time of decision of a heat curing method included economy, workability, maintainability, insulation capability, reduced construction period and usability. As a result of importance by items under AHP technique, it was found the most important element was insulation capability, followed by reduced construction period and workability. As a result of comparison of a heat supplying and a heat insulation method by dual bubble sheet differed 2 times as much as a heat supplying method, especially the evaluation degree by insulation capability and reduced construction period was high.

  • PDF

Sustainable Transportation Decision-Making Process with the Implementation of a Raster-Based SDSS - A Texas Urban Triangle (TUT) Case -

  • Kim, Hwan-Yong
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.1-7
    • /
    • 2017
  • Urban planning involves many different disciplines. In order for the related stakeholders to have better understanding and acceptable outcomes, planners are required to present a methodology that would properly reflect people's interest. In order to justify the demand and distribute people's interest, planners actively utilized the suitability analysis. Accordingly, a suitability analysis to find the optimal route for high-speed rail was performed in this paper. With ArcGIS and geographic data sets, simple map algebra could be used. The final product of this research was a map indicating the suitable routes for high-speed rail using the shortest path analysis.

An Estimation of Landslide's Vulnerability by Analysis of Static Natural Environmental Factors with GIS (GIS를 이용한 정적 자연환경인자의 분석에 의한 산사태 취약성 평가)

  • Yang, In-Tae
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.61-72
    • /
    • 2005
  • The landslide risk assessment process consists of hazard risk assessment and vulnerability analysis. landslide hazard risk is location dependent. Therefore, maps and spatial technologies such as GIS are very important components of the risk assessment process. This paper discusses the advantages of using GIS technology in the risk assessment process and illustrates the benefits through case studies of live projects undertaken. The goal of this study is to generate a map of landslide vulnerability map by analysis of static natural factors with GIS. A simple and efficient algorithm is proposed to generate a landslide potentialities map from DEM and existing maps. The categories of controlling factors for landslides, aspect of slope, soil, vegetation are defined. The weight values for landslide potentialities are calculated from AHP method. Slope and slope-direction are extracted from DEM, and soil informations are extracted from digital soil map. Also, vegetation informations are extracted from digital vegetation map. Finally, as overlaying, landslide potentialities map is made out, and it is verified with landslide place.

  • PDF

A Study on Measurement of R&D effectiveness using Performance Measures (성과지표를 이용한 R&D 부서의 평가 방법론)

  • Jo Nam-Uk;Kim Tae-Seong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1840-1844
    • /
    • 2006
  • 효과적인 성과지표는 기업 경영의 핵심역량 중의 하나이다. 본 논문에서는 R&D 부서의 성과지표를 수립하는 정량적이고 체계적인 절차를 실제 기업 사례를 통해 제시하고, 각 단계별 성과지표 수립 프로세스와 필요한 방법론을 정의한다. 제안된 방법론은 핵심성공요인 도출, 후보 성과지표 도출, 성과지표 수립, 실행 및 모니터링의 단계를 거쳐 핵심 성과 지표 (Key Performance Indicator)를 수립한다. 성과 지표 수립 단계에서는 성과지표별 가중치 수립을 위해 AHP(Analytical Hierarchy Planning)기법을 사용하였으며, 부서별 효율성을 단일한 지표로 분석하기 위해 실행 단계에서 DEA(Data Envelop Analysis)기법을 사용하였다. 개발된 방법론은 반도체 기업의 R&D 부문 성과 지표 수립 및 평가에 적용되었다.

  • PDF

Application of An Analytical Hierarchy Process to Set Priorities on Standardization Work Items of Next Generation Internet Protocol Television (차세대 IPTV 표준화 항목 우선순위 결정을 위한 계층분석방법 응용)

  • Woo, Hoon-Shik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.192-198
    • /
    • 2010
  • To maximize effectiveness of standardization activities, it is essential to set priorities for determined standardization work items in the next generation internet protocol television (NG-IPTV) technologies. In this study, the analytic hierarchy process(AHP) is employed and applied to ranking of NG-IPTV standardization work items as a multi-criteria decision making tool which involves comprehensive surveys. Survey results are analyzed and we identified a useful three level segmentation of standardization strategic plan which shows standardization work item priorities.

A Study on the Selection of Remodeling Method by User's Request Analysis -Focused on Apartment House- (사용자 요구분석을 통한 리모델링방법 선정에 관한 연구 -공동주택을 중심으로-)

  • Yoon, Yer-Wan;Park, Do-Kyong;Yang, Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.119-128
    • /
    • 2004
  • Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.

Development of a Cross-impact Hierarchical Model for Deciding Technology Priority (기술우선도 결정을 위한 상호영향 계층분석모형의 개발)

  • 권철신;조근태
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.1
    • /
    • pp.1-17
    • /
    • 2002
  • The objective of this paper is to develop a new priority setting algorithm that considers the cross-impact of the future technology alternatives and that satisfies the final goal of the technology management through multi-hierarchy evaluation criteria. By combining the Analytic Hierarchy Process (AHP) model, which is a well-known priority setting model, and Cross Impact Analysis (CIA) model, which is a technological forecasting method that considers cross-impact among R&D Items, we developed an Integrated Cross-Impact Hierarchical (CIH) model, which sets the priority by considering technological forecasting and technology dependency simultaneously. A step-by-step numerical example of the model developed here is presented as backup of its practicality.

A study on the design of an agile supply chain (민첩 공급사슬 설계 방안에 관한 고찰)

  • 문홍일;강무진;김상명;장인성;김기태
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.81-84
    • /
    • 2002
  • With the increasing market dynamics, the concept of agile manufacturing system gets more and more attention. For a manufacturing system to be agile, the supply chain should also have sufficient agility. However, most of the supply chain design methods are based on the human experience or trial-and-errors. In this paper, a systematic methodology is proposed. It takes into account the agility of supply chain, the behavior of which is represented as a beam model in mechanics, composed of supplier, transporter, manufacturer, distributor, and customer.

  • PDF