• Title/Summary/Keyword: (Preliminary) Feasibility Study

Search Result 306, Processing Time 0.022 seconds

A Study of the Benefit Cost of The Railway Nosie (철도소음의 편익비용 추정)

  • Park, Byung-Eun;Jang, Bong-Hee;Han, Sung-Woo;Kim, Dong-Gi;Park, Kwang-Heyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.1465-1468
    • /
    • 2006
  • Railway is superior to the other land transportation systems in aspects of environmental problems. Environmental problems are not considered during a preliminary feasibility study. Investment for railway is low because of low B/C(benefit/cost)ratio in the economical efficiency analysis during the preliminary feasibility study. The body of this paper studies the railway noise which can reflect environmental problems an assessment of environmental impact. The body of this paper studies the presumption of The Benefit Cost of railroad noise arresting it will be able to reflect the evaluation environmental matter of the effect which it gives to an environment.

  • PDF

A Study on Refinement of Benefit Evaluation Methods for Preliminary Feasibility Study of Port Construction (항만건설 예비타당성 조사의 편익 산정 개선에 대한 연구)

  • Shin, Seungsik
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.4
    • /
    • pp.17-38
    • /
    • 2015
  • The purpose of this study is to suggest new methods for evaluating the benefits of a preliminary feasibility study for port construction. For this purpose, this study analyzes the problem of barge loading and unloading systems, and suggests new methods such as using neighboring same kinds of ports first. The study also estimates the benefits for ports that have been evaluated by the existing theory, using the newly suggested methods. The result suggests that there is a possibility to reduce the level of economic feasibility for both general and container-exclusive ports by applying the newly suggested methods.

Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로)

  • Ahn, Sang-Jin;Park, Eun-Ji;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.1
    • /
    • pp.124-145
    • /
    • 2014
  • Market failure occurs when Pareto efficiency is not achieved through market mechanism. In order to solve this problem, government intervene market; paying great attention to the optimum state of resource allocation. However, as the size of government investment in R&D goes up, many professionals emphasize the importance in efficient management system. This work is the result of exploratory study to look into life-cycle management of governmental R&D program. Literature reviews and empirical research on governmental R&D programs elicit improvements for effective life-cycle management of governmental R&D program as follows: consistent discrimination between capital expenditure and recurring expenditure, dual management system by spending properties, implementing total cost management system in capital expenditure, and discrimination between preliminary feasibility study with confirming total program cost in recurring expenditure.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

A Study on Meta Analysis of Preliminary Feasibility for Government R&D Programs to Improve Planning Project of the Government Funded Research Institutes (정부출연연구기관 주요사업 연구기획 강화를 위한 예비타당성조사 사업 메타분석연구)

  • Lee, Jong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.445-453
    • /
    • 2017
  • The Korean government's recent R&D policy has focused on encouraging government-funded research institutes (GRIs) to develop mid-term, long-term, and large-scale R&D projects. It is necessary to prepare thoroughly for the new R&D strategy, but there is no systematic accumulation of planning expertise, and there has been continued demand for good examples of research planning. Therefore, this study analyzes the reports of preliminary feasibility for government R&D programs through a meta-analysis of detailed evaluation items and contents to help researchers enhance their project-planning ability. The evaluation items that can be applied to R&D planning for GRI were reviewed, and twelve detailed evaluation items were selected through content analysis. The results of this study could contribute to practical R&D project planning and the improvement of evaluations.

Development of a Feasibility Evaluation Model for Apartment Remodeling with the Number of Households Increasing at the Preliminary Stage (노후공동주택 세대수증가형 리모델링 사업의 기획단계 사업성평가 모델 개발)

  • Koh, Won-kyung;Yoon, Jong-sik;Yu, Il-han;Shin, Dong-woo;Jung, Dae-woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.22-33
    • /
    • 2019
  • The government has steadily revised and developed laws and systems for activating remodeling of apartments in response to the problems of aged apartments. However, despite such efforts, remodeling has yet to be activated. For many reasons, this study noted that there were no tools for reasonable profitability judgements and decision making in the preliminary stages of the remodeling project. Thus, the feasibility evaluation model was developed. Generally, the profitability judgements are made after the conceptual design. However, decisions to drive remodeling projects are made at the preliminary stage. So a feasibility evaluation model is required at the preliminary stage. Accordingly, In this study, a feasibility evaluation model was developed for determining preliminary stage profitability. Construction costs, business expenses, financial expenses, and generally sales revenue were calculated using the initial available information and remodeling variables derived through the existing cases. Through this process, we developed an algorithm that can give an overview of the return on investment. In addition, the preliminary stage feasibility evaluation model developed was applied to three cases to verify the applicability of the model. Although applied in three cases, the difference between the model's forecast and actual case values is less than 5%, which is considered highly applicable. If cases are expanded in the future, it will be a useful tool that can be used in actual work. The feasibility evaluation model developed in this study will support decision making by union members, and if the model is applied in different regions, it will be expected to help local governments to understand the size of possible remodeling projects.

Development of bonding processes for micro-optical and thermo-fluidic components (광/열유체 부품의 접합공정 개발)

  • 김정호;이지혜;유중돈;최두선
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.137-140
    • /
    • 2002
  • The main objectives in the first year include selection of the MEMS bonding methods and feasibility study of selected methods. The ultrasonic bonding method is chosen for MEMS packaging, and the processes to provide localized heating are proposed. The ultrasonic bonding process is analyzed using a lumped model. Preliminary experiments using the eutectic solder and copper pin were performed to verify possibility to MEMS packaging. The preliminary results show possibility of the ultrasonic bonding method for MEMS packaging.

  • PDF

A Study on Improvement of Feasibility Evaluation for Public Projects (공공사업 타당성 평가의 개선 방안에 관한 연구)

  • Park, Seung-Jun
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.2
    • /
    • pp.163-168
    • /
    • 2017
  • The feasibility evaluation of public projects has been carried out mainly in the economic analysis. However, items of political, technological and balanced regional development aspects are further evaluated by applying analytic hierarchy process, This paper suggests to analyzes preliminary feasibility study of construction and research & development project during the past three years and to verify correlation between B/C ratio and AHP weight. The result shows that the correlation between cost benefit ratio and the weight of the hierarchy is 0.744 in construction projects and 0.899 in research & development project. Namely, AHP weight be under the control of B/C ratio and is devoted to its role against expectation. Therefore it must be sufficiently discussed in various designs of studies to maximize the effects of AHP analysis.

A Feasibility Study on In-Vessel Core Debris Cooling through Lower Cavity Flooding

  • Yang, Soo-Hyung;Baek, Won-Pil;Chang, Soon-Heung
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.11a
    • /
    • pp.309-314
    • /
    • 1996
  • Feasibility study has been accomplished to evaluate the effectiveness of the in-vessel core debris cooling through lower cavity flooding using two dimensional finite difference scheme. The volume of cerium pool and decay power rate generated in corium pool were evaluated as important parameters to the temperature distribution on the reactor vessel lower head through previous works. In this study, the corium volume based on the System 80+ core structure and time dependent decay power rate are considered for feasibility evaluation. In addition, preliminary plans for the in-vessel core debris cooling through lower cavity flooding as severe accident management strategy, i.e. flooding timing, method and capacity, are suggested based on the result of the numerical study, international tendency related to in-vessel core debris cooling through lower cavity flooding.

  • PDF