• 제목/요약/키워드: $CO_2$ generator

검색결과 215건 처리시간 0.023초

증기발생기 수위제어의 확률론적 안정성 (Nonlinear Stochastic Stability for Steam Generator Water Level Control System)

  • Park, You-Cho;Chung, Chang-Hyun;Oh, Je-Kyun
    • Nuclear Engineering and Technology
    • /
    • 제27권2호
    • /
    • pp.155-164
    • /
    • 1995
  • 증기발생기 수위조절계통의 무작위추출 비선형 제어계통의 경우로 연구되었다. 무작위 변수로는 시간불연속 계통의 추출시간간격 이 고려되었다. Lyapunov 함수를 구하지 않는 확률론적 Lyapunov 방법이 용되었다. 유도된 안정성 요건은 CANDU 형 원자로인 월성 1호기의 자료를 이용하여 시간 존속 모사로 검증하였다.

  • PDF

서울대기중 아질산기체의 계절별 농도변화 (Concentration and Seasonal Variation of Gaseous Nitrous Acid in Seoul Air)

  • 이용근;김종욱;이동수;백선영
    • 한국대기환경학회지
    • /
    • 제10권1호
    • /
    • pp.24-31
    • /
    • 1994
  • Hourly variation of gaseous nitrous acid( HNO$_2$) concentration in Seoul air was monitored from Jan. 11 to SeP. 12, Nitrous acid concentration was determined by DS/IC over nine months of observation, HNO$_2$ range from 0.04 ppb to 5.5 ppb. Gor-tex tube as gaseous HNO$_2$generator in this study is thought to be more convenient and reproducible device than previous generator. As a result of NaOH instead of Na$_2$ CO$_3$/NaHCO$_3$ solution as the IC eluent, we could obtain more stable baseline. The concentration of the NaOH eluent was 15 mM . The limit of detection(3$\sigma$) of the liquid- Phase and gas phase nitrous acid of this method are 1.1ng/$m\ell$ , 0.04 n $\ell$ / $\ell$, respectively. The precisions evaluated by 10 replicate analysis of standard solution and standard gas generated are $\pm$1.59, $\pm$2. 89% RSD, respectively. Due to the lack of standard material for air, direct assessment of the accuracy was not possible. This study was applied to the analysis of Seoul ambient air and their results are reported herein.

  • PDF

경북지역 현대화 원예시설의 관리실태 조사분석 (Analysis of Research for the Actual State and Management of Automated Horticultural Facilities)

  • 정현교;이기명;박규식
    • 생물환경조절학회지
    • /
    • 제5권2호
    • /
    • pp.174-186
    • /
    • 1996
  • This study was carried out in order to understand the plan, design, constructing and actual condition of management of modernized horticultural facilities in Kyungpook Province which had been constructed from 1992 to 1995 funded by Government support. The aim of this study is to provide reference data for success of the forth project. It was performed by making up a question about driving of project and management condition of equipment after constructing. The results obtained from this study are as follows: 1. 73.5% of facilities horticulture farmhouse recognized that the prospect of greenhouse is bright, but 92.5% of the farmhouse also recognised that they need technical consultation on protected horticulture farming. Therefore, technical educations would must be enhanced about foundation of greenhouse and cultivation technique. 2. The holding times of explanatory meetings, cause of understanding to farmhouse, were one or two times in greenhouse construction, and 62.5% of the farmhouse expressed the insufficiency at the explanation and educational data. For this reason, it was judged that the construction contract had been delayed more than 5 months in 49.3% of the farmhouse after the decision of project budget. 3. In constructing after a contract, the rates of construction delay is 53.4% and defect occurrence is 41.1%. The biggest reasons of construction delay was insufficiency of worker and materials supply. Each percentage is 29.1%. And the reason of defect occurrence is badness of machinery equipment(62.9% ). 4. In management of greenhouse, a pipe-constructed plastic film greenhouse changes plastic film every one and three years because of sticking dust on plastic film. It was needed to about in cleaning technique of coverings. Because that used 3-5 years only half of the expected life span. 5. The order of broken rating in the subsidiary equipment is like this lollop ventilator (42.8%), a general control system(33.3%) especially, in the case of a general control system, the rate of all family can control is 52.7%. so, it is time to develop easy control equipment which every one could use as soon as possible. 6. When choose heat generator as decide capacity, the most priority is the mount of heat generator the percent is 45.5% heat generator and as decide model, the private purchase's percent is 77.3%. It is higher than a public bidding heat generator the percent is 22.7% heat generator when it compare with a public bidding. In the case of $CO_2$ generator, using rate is only 19.0%. The using rate is very low, so it needs education how to use depends on the way of the subsidiary equipment. 7. In the case of seedlings, it is asked to use factory-processed seedling effectively. because it's difficult to get security of labors(58.8%), hoped crops (55.9%) access same crops(29.4%) much more and changing of crops depends on market situation. that is the main reason the lack of knowhow.

  • PDF

이원 촉매를 이용한 과산화수소 가스발생기 성능평가 및 응용 가능성 (Performance evaluation and Applicable Possibility of $H_2O_2$ Gas Generator using Dual Catalyst System)

  • 랑성민;안성용;임하영;권세진
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2006년도 제26회 춘계학술대회논문집
    • /
    • pp.347-350
    • /
    • 2006
  • 로켓 추진제 등급에 속하는 고농도 과산화수소는 상온에서 저장 가능한 단일추진제로써 최근 환경 문제가 대두되면서 재조명을 받고 있다. 본 연구에서는 과산화수소를 추진제로 사용하고 저/고온부 촉매, 즉 이원 촉매 시스템을 이용하는 가스발생기에 대한 연구를 수행하였다. 저온에서 반응 특성이 우수하고 냉시동이 가능한 $K_2MnO_4$와 고온용 촉매인 $La_{0.8}Sr_{0.2}CoO_3(LSC)$ 촉매를 결합한 결과 기존의 낮은 성능을 가지는 단일 촉매 가스발생기에 비해 매우 높은 효율을 보였다. 이는 로켓 상단의 자세제어, 소형 위성용 추력기, 터보 펌프 구동을 위한 가스발생기 등으로 확장될 수 있다.

  • PDF

방사성폐기물인증프로그램 개발 방안 (Plan to Develop the Radioactive Waste Certification Program)

  • 정희준;이재민;황주호;김헌;정의영
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2005년도 춘계 학술대회
    • /
    • pp.205-210
    • /
    • 2005
  • 개정예정인 중${\cdot}$저준위 방사성폐기물 처분시설 인도규정에서는 방사성폐기물 처분을 위해 폐기물 발생자가 방사성폐기물의 처분요건 적합성을 입증하도록 권고하고 있다. 이에 따르면 중${\cdot}$저준위 방사성폐기물의 처분을 위해서는 폐기물의 핵종농도, 물리화학적 특성 및 그 건전성 등이 확보 되어야하며 폐기물 발생자는 이러한 정보를 처분사업자에게 전달하도록 규정되어 있다. 또한 처분 사업자는 처분시설의 안전성 평가를 통해 부지특성을 고려한 방사성폐기물 인수기준(Site Specific Waste Acceptance Criteria, SWAC)을 규정하며, 발생자는 이 기준에 따라 중${\cdot}$저준위 방사성폐기물을 관리, 처리, 인도하도록 규정되어 있다. 상기 규정과 기준을 준수하기위해 폐기물 발생자는 처분대상이 되는 폐기물을 처분시설로 운반하기 이전에 처분적합성을 사전에 입증하여야 하며 이를 위하여 관련 제도 및 절차인 방사성폐기물인증프로그램을 개발하여야 한다. 본 연구에서는 원자력 선진국들에서 시행하고 있는 방사성폐기물인증프로그램에 대한 심층 분석을 통해 국내 원전에 적용 가능한 인증프로그램 초안을 개발하였고, 그 적용성을 검증하기 위하여 현재 울진 1, 2 발전소에서 시범 적용하고 있다. 앞으로 시범적용 결과분석을 통해 국내 여건에 부합하는 방사성폐기물인증프로그램을 개발하고자 한다.

  • PDF

Analysis of activated colloidal crud in advanced and modular reactor under pump coastdown with kinetic corrosion

  • Khurram Mehboob;Yahya A. Al-Zahrani
    • Nuclear Engineering and Technology
    • /
    • 제54권12호
    • /
    • pp.4571-4584
    • /
    • 2022
  • The analysis of rapid flow transients in Reactor Coolant Pumps (RCP) is essential for a reactor safety study. An accurate and precise analysis of the RCP coastdown is necessary for the reactor design. The coastdown of RCP affects the coolant temperature and the colloidal crud in the primary coolant. A realistic and kinetic model has been used to investigate the behavior of activated colloidal crud in the primary coolant and steam generator that solves the pump speed analytically. The analytic solution of the non-dimensional flow rate has been determined by the energy ratio β. The kinetic energy of the coolant fluid and the kinetic energy stored in the rotating parts of a pump are two essential parameters in the form of β. Under normal operation, the pump's speed and moment of inertia are constant. However, in a coastdown situation, kinetic damping in the interval has been implemented. A dynamic model ACCP-SMART has been developed for System Integrated Modular and Advanced Reactor (SMART) to investigate the corrosion due to activated colloidal crud. The Fickian diffusion model has been implemented as the reference corrosion model for the constituent component of the primary loop of the SMART reactor. The activated colloidal crud activity in the primary coolant and steam generator of the SMART reactor has been studied for different equilibrium corrosion rates, linear increase in corrosion rate, and dynamic RCP coastdown situation energy ratio b. The coolant specific activity of SMART reactor equilibrium corrosion (4.0 mg s-1) has been found 9.63×10-3 µCi cm-3, 3.53×10-3 µC cm-3, 2.39×10-2 µC cm-3, 8.10×10-3 µC cm-3, 6.77× 10-3 µC cm-3, 4.95×10-4 µC cm-3, 1.19×10-3 µC cm-3, and 7.87×10-4 µC cm-3 for 24Na, 54Mn, 56Mn, 59Fe, 58Co, 60Co, 99Mo, and 51Cr which are 14.95%, 5.48%, 37.08%, 12.57%, 10.51%, 0.77%, 18.50%, and 0.12% respectively. For linear and exponential coastdown with a constant corrosion rate, the total coolant and steam generator activity approaches a higher saturation value than the normal values. The coolant and steam generator activity changes considerably with kinetic corrosion rate, equilibrium corrosion, growth of corrosion rate (ΔC/Δt), and RCP coastdown situations. The effect of the RCP coastdown on the specific activity of the steam generators is smeared by linearly rising corrosion rates, equilibrium corrosion, and rapid coasting down of the RCP. However, the time taken to reach the saturation activity is also influenced by the slope of corrosion rate, coastdown situation, equilibrium corrosion rate, and energy ratio β.

와류생성기를 부착한 선박의 속도성능에 대한 수치적 추정 (Computational Prediction of Speed Performance for a Ship with Vortex Generators)

  • 최정은;김정훈;이상봉;이홍기
    • 대한조선학회논문집
    • /
    • 제46권2호
    • /
    • pp.136-147
    • /
    • 2009
  • The computational prediction method of speed performance for a ship with vortex generators is proposed. The Reynolds averaged Navier-Stokes equation has been solved together with the application of Reynolds stress turbulence model. The computations are carried out under identical conditions of the experimental method, i.e., towing and self-propulsion calculations without and with vortex generators. The speed performance in full scale is obtained through analyzing the computational results in model scale according to the revised model-ship performance analysis method of ITTC'78 with considering the vortex generators into account. The characteristics of resistance, self-propulsion and wake characteristics on the propeller plane are investigated. The proposed computational prediction clearly shows the effect of vortex generators and can be applicable to the design tool for vortex generators.

발전용 소재 단조기술 및 국내 단조업계 동향 (Recent Trend to the Forging Technology of Power Plant Components and Status of Forging Company)

  • 김정태;장희상;김동권;김영득;김동영
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2007년도 춘계학술대회 논문집
    • /
    • pp.38-41
    • /
    • 2007
  • The increase of $CO_2$ emission by increasing of fossil fuel usage has been understood a major cause of global warming. The supply of electric energy is heavily dependent on the massive thermal power and nuclear power plant before developing the renewable energy to supply the electric energy stably at a low price. The large and sound forged components of pressure vessel, turbine and generator are widely used in power plant such as wind power, hydroelectric power generation, nuclear power and thermal power plant. This paper is discussed the trend of manufacturing technology for pressure vessel and turbine to satisfy the required condition of utility company. It is also introduced a strategy of forging industry to cope with carbon tax.

  • PDF

Development of a Highly Efficient Boiler System Using a Diesel Engine

  • Lee, D.-H;Lee, D.-Y;Jo, M.-C;Cho, H.-N;Kim, Y.-S
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제28권2호
    • /
    • pp.367-375
    • /
    • 2004
  • We have developed a highly efficient boiler system using the 2,600cc Diesel engine. In this system, the co-generation concept is utilized in that the electric power is produced by the generator connected to the engine, and waste heat is recovered from both the exhaust gases and the engine itself by the shell-and-tube heat exchangers. The heat exchanger connected to the engine outlet is specially designed such that it not only recovers waste heat effectively from the exhaust gases, but significantly reduces an engine noise. It is found that the total efficiency(thermal efficiency plus electric power generation efficiency) of this system reaches maximum 96.3% which is about 15% higher than the typical Diesel engine boiler system currently being used worldwide.

An Experimental Study of Ventilation Effectiveness in Mechanical Ventilation systems using a Tracer Gas Method

  • Lee, Jae keun;Kang, Tae-Wook;Lee, Kam-Gyu;Cho, Min-Chul;Shin, Jin-Hyuk;Kim, Seong-Chan;Koo, Jeong-Hwan;Lee, Jong ho
    • Journal of Mechanical Science and Technology
    • /
    • 제14권11호
    • /
    • pp.1286-1295
    • /
    • 2000
  • The ventilation effectiveness is evaluated as a function of air exchange rate and supply / extract locations in a simplified model chamber using a tracer gas technique of CO$_2$ gas injected into a supply duct. Ventilation systems consist of supply and extract fans, a CO$_2$gas generator, a CO$_2$gas analyzer and a test chamber. The ventilation effectiveness is evaluated using a step-down method based on ASTM Standard E741-83. The room mean age of the model chamber is decreased with increasing air exchange rate fanged from 6to 10 air changes per hour. The ventilation effectiveness of the mechanical inlet/natural extract system is better than that of the mechanical extract system.

  • PDF