1 |
Seo, S., & Kim, K. (2017a). Bearing strength of filler joint in EG-frame system for the construction of underground wall in building, Journal of the Architectural Institute of Korea Structure & Construction, 32(10), 3-11 (in Korean)/
|
|
2 |
Shin, W. S., & Son, C. B. (2016). Development of Evaluation Methodology on the Image of Construction Industry, Journal of the Architectural Institute of Korea, Structure & Construction Section, 32(4), 41-48/
|
|
3 |
Park, G.I., & Lee, S.J. (2016). Topology optimization for plane structures using isogeometric approach, Journal of the Architectural Institute of Korea, 32(2), pp.3-10./
|
|
4 |
Kim, J. (2016). "Real Estate Appraisal Method of the Remodeled Office Building: Focusing of Income Capitalization Method", Journal of the Architectural Institute of Korea Structure & Construction Vol.32 No7/
|
|
5 |
Kim, C., Eom, T., Park, H., Kim, T. (2016) Seismic Performance of Lightly Reinforced Concrete Beam-Column Connections for Low-Rise Buildings. Journal of the Architectural Institute of Korea Structure & Construction, 32(3), 19-32./
|
|
6 |
Kim, E. J., Kim, J. H,. Huh, Y. K. (2016). A Case Study on Practical Uses of BIM in Building Construction, Journal of the Architectural Institute of Korea Structure & Construction, 32(12), pp. 69-75./
|
|
7 |
Jun, J.S., Park, J.S., Oh, S.K., Lim, N.K. (2016). A proposal of selection of index of evaluation waterproof and anti-corrosion material to be applied on the interior of water supply facilities, Journal of the Architectural Institute of Korea, 32(10), 31-38 [in Korean]./
|
|
8 |
Jongwon Lee, "Crack Detection Method of Tapered Cantilever Pipe-type Beam with a Tip Mass", JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA Structure & Construction, 32.4, 3-10, 2016./
|
|
9 |
S. C. Jeong and H. K Lee, "A Study on the Comparative Analysis of the Quality Management System of Temporary Equipment and Materials", Journal of the Architectural Institute of Korea Structure & Construction, Vol. 32, No. 9, pp. 43-50, 2016./
|
|
10 |
Kim, J., (2016) 'Effects of Delayed Construction of Outrigger Joints on Lateral-Load-Resisting Capabilities of RC High-Rise Buildings under Construction.' Journal of Architectural Institute of Korea (Structure), 32(1), 3-13/
|
|