1 |
Lee, D. H., & Ock, J. H. (2014). A Study on the Application of the In-Fill Construction Method to High-Rise Unit Modular Buildings. Journal of Architectural Institute of Korea, 30(3), 105-114./
|
|
2 |
Suh, B. G., & Yun, S. H. (2014). BIM based Optimize Method of Finish Material Placing for Modular Unit, Journal of Architectural Institute of Korea, 30(3), 97-104./
|
|
3 |
Choi, S-H, (2014), "Development of Enforcement Rate for Occupational Safety and Health Management Expense by Construction Project Types and Percentage of Completion", Journal of the Korea Institute of Science and Technology information", 30(7)/
|
|
4 |
Yun SY, Park JH, An Experimental Study on the Shear Behaviour of Post-Installed Anchors for Seismic Retrofit. Journal of the Architecture Institute of Korea. 2014 Sep;30(9):41-51./
|
|
5 |
Kim, M. J., Lee, K. H., and Son C. B. (2014). "An Status Analysis on the BIM Utilization and Its Improvement Measures in Domestic Architects." Journal of the Architectural Institute of Korea Structure & Construction, 30(8), pp. 79-87./
|
|
6 |
Kim, B., and Jung, Y. (2014). "A Study on Development of the Probabilistic LCC Analysis (P-LCCA) Model to Building by using Forecast Simulation", Journal of Architectural Institute of Korea, 30(3), pp. 115-122./
|
|
7 |
J.C. Lee, "A Basic Study for $CO_2$ Gas Curing Application to Cementitious Product", J. Architect. Ins. Kor. 30 (2014) 81./
|
|
8 |
Lee, K.S., Huque, Ziaul, Han, S.E., A Study on the Missile-Target Interaction Analysis on the Concrete Dome Structure, Journal of Architectural Institute of Korea, (Structure & Construction Section), 2014, Vol. 30, No.6, pp.11-18./
|
|
9 |
Lee, K.S., Huque, Ziaul, Jeon, D.J., Han, S.E., The Development of Impact Force Model of Large Commercial Aircraft Considering the Fuel Mass Effect. Journal of Architectural Institute of Korea, (Structure & Construction Section), 2014, Vol. 30, No.6, pp.11-18./
|
|
10 |
김민재, 이강협, 손창백, "국내 설계사무소의 BIM 활용실태 분석 및 개선방안", 대한건축학회논문집 구조계, 제30권, 제8호, p.p.79-86, 2014/
|
|