Browse > Article
http://dx.doi.org/10.22937/IJCSNS.2022.22.9.13

Public-Private Partnership in the System of Economic Development of the Country  

Muliar, Volodymyr (Polissya National University)
Ryda, Tetyana (State Tax University)
Dolot, Volodymyr (polyclinic department No. 2 of the KNP "DCL No. 9 of Podilsky district of Kyiv")
Didych, Oleg (Lviv Polytechnic National University)
Grechanyk, Bogdan (National Technical University of Oil and Gas)
Chornysh, Iurii (Lviv State University of Security Life Activity)
Publication Information
International Journal of Computer Science & Network Security / v.22, no.9, 2022 , pp. 83-88 More about this Journal
Abstract
The main purpose of the study is to determine the key aspects of the public-private partnership system in the context of the economic development of the state. At first glance, the mutually exclusive interests of the state and business do not contribute to the development of common and agreed development goals. At the same time, ignoring the versatility of interests and the aggravation of the discussion regarding the two sides under consideration, the study of the theoretical foundations of the interaction between the public and private sectors of the economy allows us to draw the following conclusion: world economic theory from classical political economy to new institutionalism has a clear structured position on the ancient historical depth of existence of the form of partnerships Based on the results of the study, the main elements of the public-private partnership system in the context of the economic development of the state were identified.
Keywords
Public-Private Partnership; Economic Development; System;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Kryshtanovych, S., Treshchov, M., Durman, M., Lopatchenko, I., & Kernova, M. Gender Parity In Public Administration In The Context Of The Development Of European Values In The Management System. Financial and Credit Activity: Problems of Theory and Practice, 4(39), 2021, 475-481. https://doi.org/10.18371/.v4i39.241416   DOI
2 Kryshtanovych, M., Romanova, A., Koval, I., Lesko, N., & Lukashevska, U. Research of problems and prospects of state development in the pedagogical process. Revista Tempos E Espacos Em Educacao, 14(33), 2021, e16534. https://doi.org/10.20952/revtee.v14i33.16534   DOI
3 Cheng, Z., Ke, Y., Lin, J., Yang, Z., & Cai, J. (2016). Spatiotemporal dynamics of public private partnership projects in China. International Journal of Project management, 34(7), 1242-1251. https://doi.org/10.1016/j.ijproman.2016.05.006   DOI
4 Zhou, J., Li, W., Wang, J. X., Ding, S., & Xia, C. Y. (2019). Default prediction in P2P lending from highdimensional data based on machine learning. Physica A: Statistical Mechanics and its Applications, 534, 122370. https://doi.org/10.1016/j.physa.2019.122370   DOI
5 Chan, A. P. C., Lam, P., Wen, Y., Ameyaw, E., Wang, S. Q., & Ke, Y. (2015). Cross-sectional analysis of critical risk factors for PPP water projects in China. Journal of Infrastructure Systems, 21(1), 04014031. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000214   DOI
6 Almarri, K., Alzahrani, S., & Boussabaine, H. (2019). An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), 1696-1711. https://doi.org/10.1108/ECAM-04-2018-0177   DOI
7 Cruz, C. O., & Marques, R. C. (2013a). Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(9), 1082-1090. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000710   DOI
8 Tuncikiene, Zivile, Grencikova, A., & Skackauskiene, I. (2014). Development of public and private sector partnership: managerial aspects. Business: Theory and Practice, 15(1), 11-21. https://doi.org/10.3846/btp.2014.02   DOI
9 Karlavicius, L. V., Karlaviciene, B., & Grigoniene, I. (2006). Public - private partnership - a new way to attract investments. Business: Theory and Practice, 7(1), 32-36. https://doi.org/10.3846/btp.2006.05   DOI
10 Zheng, X., Liu, Y., Jiang, J., Thomas, L. M., & Su, N. (2021). Predicting the litigation outcome of PPP project disputes between public authority and private partner using an ensemble model. Journal of Business Economics and Management, 22(2), 320-345. https://doi.org/10.3846/jbem.2021.13219   DOI
11 Dewulf, G., & Garvin, M. J. (2020). Responsive governance in PPP projects to manage uncertainty. Construction Management and Economics, 38(4), 1-15. https://doi.org/10.1080/01446193.2019.1618478   DOI
12 Mahfouz, T., & Kandil, A. (2012). Litigation outcome prediction of differing site condition disputes through machine learning models. Journal of Computing in Civil Engineering, 26(3), 298-308. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000148   DOI
13 Marques, R. C., & Berg, S. (2011). Risks, contracts, and private-sector participation in infrastructure. Journal of Construction Engineering and Management, 137(11), 925-932. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000347   DOI
14 Chowdhury, A. N., Chen, P.-H., & Tiong, R. L. K. (2012). Establishing SPV for power projects in Asia: an analysis of critical financial and legal factors. Journal of Business Economics and Management, 13(3), 546-566. https://doi.org/10.3846/16111699.2011.643446   DOI
15 Kryshtanovych, M., Kryshtanovych, S., Chubinska, N., Khromova, Y.,& Sylkin, O. The System of Public Administration in Educational Institutions in Rural Regions in the Context of the Development of Educational Culture. Revista Brasileira De Educacao Do Campo, 7, 2022, e14140. https://doi.org/10.20873/uft.rbec.e14140   DOI