1 |
Haghayeghi, M. (2003), "The coming of conflict to the Caspian Sea", Problems of Post-Communism, 50(3), 32-41.
DOI
|
2 |
Henley, J. and Kumamoto, H. (1981), Reliability engineering and risk assessment, Prentice Hall, Englewood Clift, N J.
|
3 |
Hoyland, A. and Rausand, M. (1994), Systems Reliability Theory Models and Statistical Methods, John Willey and Sons, New York.
|
4 |
HSE, Health and Safety Executive (2019), Feasibility of storybuilder software tool for major hazards intelligence Prepared by the Health and Safety Laboratory for the Health and Safety Executive, 2010. Available at: www.hse.gov.uk. Accessed on 02.01.2019.
|
5 |
Jackson, P.S., Hockenbury, R.W. and Yeater, M.L. (1981), "Uncertainty analysis of system reliability and availability assessment", Nucl. Eng. Des, 68, 5-29.
|
6 |
Kahraman, C. (2001), Capital budgeting techniques using discounted fuzzy cash flows. (Eds., Ruan, D.; Kacprzyk, J. and Fedrizzi, M.), Soft Computing for Risk valuation and Management: Applications in Technology, Environment and Finance, Physica-Verlag, Heidelberg, 375-396.
|
7 |
Kang, J. Sun, L. and Soares, C.G. (2018), "Fault tree analysis of floating offshore wind turbines", Renew. Energ., 1-13.
|
8 |
Kaufmann, A. and Gupta, M.M. (1985), Introduction to Fuzzy Arithmetic: Theory and Applications, Van Nostrand Reinhold, New York.
|
9 |
Lees, F.P. (1996), Loss Prevention in the Process Industries. 2nd Ed., Boston.
|
10 |
Lees, F.P. (2005), Loss Prevention in the Process Industries. Butterworths, London. Third edition. 9, 05-122.
|
11 |
Li, Y. and Liao, X. (2007), "Decision support for risk analysis on dynamic alliance", Decision Support Syst., 42, 2043-2059.
DOI
|
12 |
Liang, G.S. and Wang, M.J. (1993), "Fuzzy fault-tree analysis using failure possibility", Microelectron. Reliab., 33, 583-597.
DOI
|
13 |
Lind, N.C. (1983), "Models of human error in structural reliability", Struct. Saf., 1, 166-175.
|
14 |
Marco, E.G.V.C. (2018), "The likelihood interpretation as the foundation of fuzzy set theory", Int. J. Approx. Reason., 90, 333-340.
DOI
|
15 |
Mareike, L. and Athanasios, K. (2018), "A review of reliability-based methods for risk analysis and their application in the offshore wind industry", Renew. Sust. Energ. Rev., 91, 1065-1076.
DOI
|
16 |
Onisawa, T. (1988), "An approach to human reliability in man-machine systems using error possibility", Fuzzy Set. Syst., 27, 87-103.
DOI
|
17 |
Nagi, A., Mohamed, D., Ismail, E., Chai, Sh. and Abdusalam, A. (2018), "Risk assessment of LNG and FLNG vessels during maneuvering in open sea", J. Ocean Eng.Sci., 3, 56-66.
DOI
|
18 |
Nguyen, H.T. and Walker, E.A. (2000), A first course in fuzzy logic. Chapman and Hall/CRC, Florida.
|
19 |
Oil and gas UK (2018), Available at: https://oilandgasuk.co.uk/wp-content/uploads/woocommerce_uploads/2015/10/HS029-2009-CURRENTAccident-Statistics.pdf Accessed on 20. March. 2018.
|
20 |
OWJE (2019), Available at: http://mapas.owje.com/maps/607_Northern-Caspian-Sea-Region-Map.html Accessed on 21. January. 2019.
|
21 |
Ren, J., Jenkinson, I., Wang, J., Xu, D.L. and Yang, J.B. (2008), "A methodology to model causal relationships on offshore safety assessment focusing on human and organisational factors", J. Saf. Res., 39(1), 87-100.
DOI
|
22 |
Ren, J., Wang, J., Jenkinson. I., Xu, D.L. and Yang, J.B. (2007), "A Bayesian network approach for offshore risk analysis through linguistic variables", China Ocean Eng., 21(3), 371-388.
|
23 |
RFERL (2018), Available at: http://www.rferl.org/content/History_BP_Oil_Spill_Haunt_Caspian_Sea/2052194.html, Accessed on 27. Dec. 2018.
|
24 |
World Atlas (2019), Available at: http://www.worldatlas.com/aatlas/infopage/caspiansea.htm Accessed on 21.Jan. 2019.
|
25 |
Visser, J.P. (1998), Developments in HSE Management in oil and gas exploration and production, (Eds.,Hale A.R. and Baram, M.), Safety management, the challenge of change. Oxford: Pergamon.
|
26 |
Wang, Y. (2004), Development of a computer-aided fault tree synthesis methodology for quantitative risk analysis in the chemical process industry, Ph.D. thesis.
|
27 |
Wilcox, C.R. and Ayyub, M.B. (2003), "Uncertainty modelling of data and uncertainty propagation for risk studies", Proceedings of the IEEE 4th International Symposium on Uncertainty Modelling and Analysis.
|
28 |
Wu, W.S., Yang, C.F., Chang, C.H., Chateau, P.A. and Chang, Y.C. (2015), "Risk assessment by integrating interpretive structural modelling and Bayesian network, case of offshore pipeline project", Reliab. Eng. Syst.Saf., 142, 515-524.
DOI
|
29 |
Yang, T. and Hung, C.C. (2007), "Multiple-attribute decision-making methods for plant layout design problem", Robot. Comput.-Integrated Manufact., 23, 126-137.
DOI
|
30 |
Yuhua, D. and Dataob, Y. (2005), "Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis", J. Loss Prevent. Proc., 18, 83-88.
DOI
|
31 |
Zadeh, L.A. (1965), "Fuzzy sets", Inform. Control., 8, 338-353.
DOI
|
32 |
Zhao, R. and Govind, R. (1991), "Defuzzification of fuzzy intervals", Fuzzy Set. Syst., 43, 45-55.
DOI
|
33 |
Miller, D.P. and Swain, A.D. (1987), Human error and human reliability in G Salvendy, Handbook of human factors, John Wiley and sons, Inc., New York.
|
34 |
Keller, J.M. and Tahani, H. (1992), "Implementation on conjunctive and disjunctive fuzzy logic rules with neutral networks", Int. J. Approx.Reason., 6, 221-240.
DOI
|
35 |
Klir, G.J. and Yuan, B. (1995), Fuzzy Sets and Fuzzy Logic: Theory and Application. Prentice Hall, New Jersey.
|
36 |
Krishna, K., Wang, Y., Saraf, S.R., Rogers, W.J., Baldwin, J.T., Gupta, J.P. and Mannan, M.S. (2003), "Hydroxylamine production: Will a QRA help you decide?", Reliab. Eng. Syst. Safe., 81, 215-224.
DOI
|
37 |
Martins, M.R., Pestana, M.A., Souza, G.F.M. and Schleder, A.M. (2016), "Quantitative risk analysis of loading and offloading Liquefied Natural Gas (LNG) on a floating storage and regasification unit (FSRU)", J. Loss Prevent. Proc., 43, 629-653.
DOI
|
38 |
Mather, A. (2009), FPSO Handbook. Witherby seamanship international Ltd. ISBN: 9781905331574.
|
39 |
Mokhtari, K. (2011), Advanced Risk Management in Offshore Terminals and Marine Ports, PhD Thesis. Liverpool John Moores University.
|
40 |
Mokhtari, K. (2012), RISK MANAGEMENT - A Guideline for QHSES and Risk Managers in Offshore and Marine Industries, LAMBERT Academic Publishing in Germany, April, 2012. ISBN: 9783848410286.
|
41 |
Singer, D.A. (1990), "Fuzzy set approach to fault tree and reliability analysis", Fuzzy Set. Syst., 34, 145-155.
DOI
|
42 |
Zimmerman, H.J. (1996), Fuzzy sets theory and its applications, Kluwer academic publishers, Boston.
|
43 |
Zuijderduijn, C. (1999), Risk management by Shell refinery/chemicals at Pernis, The Netherlands; Implementation of SEVESO-II based on build up experiences, using a Hazards and Effects Management Process.
|
44 |
Rosqvist, T. (2003), On use of experts judgment in the quantification of risk assessment, Dissertation for the degree of Doctor of Technology, Helsinki University of Technology, Espoo, Finland.
|
45 |
Saaty, T.L. (2001), Decision Making with Dependence and Feedback: Analytic Network Process, RWS Publications, Pittsburgh.
|
46 |
Mokhtari, K. and Ren, J. (2014), "A risk management methodology for maritime logistics and supply chain applications", Ocean Syst. Eng., Publisher: Korean Society of Ocean Engineers,4(2), 137-150.
DOI
|
47 |
Murtaza, M.B. (2003), Fuzzy-AHP Application to Country Risk Assessment. American Business Review. Middle Tennessee State University, TN.
|
48 |
Nagi, A., Ashraf, Z., Mohamed, D., Ismail, E., Ahmed, M. and Wenming, S. (2018), "Operational risk assessment of offshore transport barges", Int. J. Ocean Eng., 156, 333-346.
DOI
|
49 |
Sentz, K. and Ferson, S. (2002), Combination of evidence in Dempster-Shafer theory. SAND 2002-0835.
|
50 |
Sharp, D. (2009), Upstream and offshore energy insurance, Witherbys insurance, ISBN: 9781856093514.
|
51 |
Takagi, H. and Hayashi, I. (1991), "NN-driven fuzzy reasoning", Int. J. Approx. Reason., 5, 191-212.
DOI
|
52 |
Tarila, Z. and Edward, G.O. (2017), "Senior managers and safety leadership role in offshore oil and gas construction projects", Procedia Eng., 196, 1011-1017.
DOI
|
53 |
Thacker, B. and Huyse, L. (2003), Probabilistic assessment on the basis of interval data, In 44th AIAA/ASME/ASCE/AHS Structures, Structural Dynamics, and Materials Conference Published by the American Institute of Aeronautics and Astronautics, Inc, 2003.
|
54 |
RIVM (2019), National institute for public health and the environment of Netherland, RIVM Report 620801001, 2008. Available at: https://www.rivm.nl/en.Accessed on: 08.05.2019.
|
55 |
Trbojevic, V.M. and Carr, B.J. (2000), "Risk based methodology for safety improvements in ports", J. Hazard.Mater., 71, 467-480.
DOI
|
56 |
UNCTAD (2006), United Nation Conference on Trade and Development. Maritime security: Elements of an analytical framework for compliance measurement and risk assessment.
|
57 |
ABS, American Bureau Shipping (2019), Thesis Bow-tie, Solution for the management of risk, 2007. Available at: www.absconsulting.com Accessed on: 08.01.2019.
|
58 |
Abrahamsson, M. (2000), Uncertainty in quantitative risk analysis-characterization and methods of treatment. Report No: 1024 (ISSN: 1402-3504), Department of Fire Safety Engineering, Lund University, Sweden.
|
59 |
ABS, American Bureau Shipping (2019), A guide for risk evaluations for the classification of marine-related facilities 2003. Available at: www.absconsulting.com Accessed on: 08.01.2019.
|
60 |
ABS, American Bureau Shipping (2019), Risk assessment applications for marine and offshore oil and gas industries, 2000. Available at: www.absconsulting.com Accessed on: 08.01.2019.
|
61 |
Agarwal, H., Renaud, E.J., Preston, L.E. and Padmanabhan, D. (2004), "Uncertainty quantification using evidence theory in multidisciplinary design optimization", Reliab. Eng. Syst. Saf., 85, 281-294.
DOI
|
62 |
AIChE,American Institute of Chemical Engineers(2002),Guidelines for Chemical Process Quantitative Risk Analysis.Second edition, New York.
|
63 |
Andrew, J.D. and Ridley, L.M. (2002), "Application of the cause-consequence diagram method to static systems", Reliab. Eng. Syst. Saf., 75, 47-58.
DOI
|
64 |
Andrews, J.D. and Moss, R.T. (2002), Reliability and Risk Assessment.Second edition, Professional Engineering Publishing, UK.
|
65 |
Aneziris, O.N., Papazoglou, I.A., Konstantinidou, M. and Nivolianitou, Z. (2014), "Integrated risk assessment for LNG terminals", J. Loss Prevent. Proc., 28, 23-35.
DOI
|
66 |
Anoop, M.B., Balaji, R.K. and Gopalakrishnan, S. (2006), "Conversion of probabilistic information into fuzzy sets for engineering decision analysis", Comput. Struct., 84, 141-155.
DOI
|
67 |
Barannik, V., Borysova, O. and Stolberg, F. (2004), "The Caspian Sea region: Environmental change", Royal Swedish Academy of Sciences, 33, 1-2.
|
68 |
Ayyub, B. and Klir, J.G. (2006), Uncertainty Modelling and Analysis in Engineering and the Sciences, Chapman and Hall/CRC.
|
69 |
Bae, H., Grandhi, V.R. and Canfield, A.R. (2004), "An approximation approach for uncertainty quantification using evidence theory", Reliab. Eng. Syst. Saf., 86, 215-225.
DOI
|
70 |
Balli, S. and Korukoglu, S. (2009), "Operating system selection using fuzzy AHP and TOPSIS methods", Math. Comput. Appl., 14(2), 119-130.
|
71 |
Bellamy, L.J., Alea, B.J.M., Geyerc, T.A.W., Goossensd, L.H.J., Haled A.R., Ohe, J., Mude, M., Bloemhofe, A., Papazoglouf, I.A. and Whistong, J.Y. (2007), "Story builder, a tool for the analysis of accident reports", Reliab. Eng. Syst. Safe., 92, 735-744.
DOI
|
72 |
Blom, H.A.P., Everdij, M.H.C. and Daams, J. (1999), ARIBA Final Report Part II: Safety Cases for a new ATM operation, NLR report TR-99587, Amsterdam.
|
73 |
CIS, Chemical Industries Association (1992), A guide to Hazard and Operability Studies.
|
74 |
CCPS, Centre for Chemical Process Safety (2000), Guideline for Chemical Process Quantitative Risk Analysis, New York: Centre for Chemical Process Safety, American Institute of Chemical Engineers (AIChE).
|
75 |
Chang, D.Y. (1996), "Applications of the extent analysis method on fuzzy AHP", Eur. J. Operational Res., 95, 649-655.
DOI
|
76 |
Chen, C.T. (2000), "Extensions of the TOPSIS for group decision-making under fuzzy environment", Fuzzy Set. Syst., 114, 1-9.
DOI
|
77 |
Cheng, C.W. and Lan, A.L.H. (2004), "Web access failure analysis fuzzy reliability approach", Int. J. Comput. Internet Management, 12(1), 65-73.
|
78 |
Chiara, V. and Giuseppe, M. (2014), "Risk analysis of LNG terminal: Case study", Chem. Eng. T., 36, 277-282.
|
79 |
Clemen, R.T. and Winkler, R.L. (1999), "Combing probability distribution from experts in risk analysis", Risk Anal., 19(2), 187-203.
DOI
|
80 |
CMPT. (1999), A Guide to quantitative risk assessment for offshore installations. The centre of marine and petroleum technology, UK.
|
81 |
CNN Report. (2019), Available at: https://edition.cnn.com/2013/10/17/world/europe/chechnya-fast-facts/index.html. Accessed on 21. January. 2019.
|
82 |
Cockshott, J.E. (2005), "Probability bow-ties. A transparent risk management tool", Process Saf. Environ. Protection, 83(4), 307-316.
DOI
|
83 |
DETR. Department of Transport, Port Marine Safety Code (2000), ISBN: 1 85112 365 2.
|
84 |
Dickson, G.C.A. (2003), Risk Analysis. The Institution of Risk Management, IRM, Witherby Publishing.
|
85 |
DNV, Det Norske Veritas (2000), Frequency analysis of accidental oil releases for FPSO operations in the Gulf of Mexico. Final Report, Houston.
|
86 |
Elliott, M., Boyes, S. and Smyth, K. (2019), The Marine risk assessment and management using the Bow-tie approach and its practical applications.Institute of Estuarine and Coastal Studies (IECS), University of Hull, Hull HU6 7RX, UK. Available at: http://coastal-futures.net/wp-content/uploads/2016/02/Elliott-The-Bow-Tie-Approach-risk-assessment-ilovepdf-compressed.pdf. Accessed on: 08.01.2019.
|
87 |
Dokas, I.M., Karras, D.A. and Panagiotakopoulos, D.C. (2009), "Fault tree analysis and fuzzy expert systems: Early warning and emergency response of landfill operations", Environ. Model. Softw., 24, 8-25.
DOI
|
88 |
Druschel, R.B., Ozbek, M. and Pinder, G. (2006), "Application of Dempster-Shafer theory to hydraulic conductivity", Proceedings of the CMWR-XVI, Conference Programme Copenhagen, Denmark.
|
89 |
Edwards, C.J. (1999), "Developing a safety case with an aircraft operator", Proceedings of the 2nd Annual Two-Day Conference on Aviation Safety Management, May 1999.
|
90 |
Ertugrul, D. and Karakasoglu, N. (2007), Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods, Expert Systems with Applications, Article in Press.
|
91 |
Ferdous, R., Khan, F., Sadiq, R., Amyotte, P. and Veitch, B. (2009), "Handling data uncertainties in event tree analysis", Process Saf. Environ. Protection, 87, 283-292.
DOI
|
92 |
GAO, United States Government Accountability Office (2019), Port risk management: Further Refinements Needed to Assess Risks and Prioritize Protective Measures at Ports and Other Critical Infrastructure. Report to Congressional Committees, 2005. Available at: https://www.gao.gov/new.items/d0691.pdf. Accessed on: 09.01.2019.
|
93 |
GEXCON (2019), World leading Company in the fields of safety and risk management, Available at: https://www.gexcon.com.Accessed on: 07.01.2019.
|
94 |
Groeneweg, J. (1998), Controlling the controllable. Leiden: DSWO Press.
|