Investigation on ground displacements induced by excavation of overlapping twin shield tunnels |
Qi, Weiqiang
(School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijinig)
Yang, Zhiyong (School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijinig) Jiang, Yusheng (School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijinig) Yang, Xing (School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijinig) Shao, Xiaokang (School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijinig) An, Hongbin (China Railway 12th Bureau Group Co., Ltd.) |
1 | Melis, M., Medina, L. and Rodriguez, J.M. (2002), "Prediction and analysis of subsidence induced by shield tunnelling in the Madrid metro extension", Can. Geotech. J., 39, 1273-1287. https://doi.org/10.1139/t02-073. DOI |
2 | Miliziano, S. and de Lillis, A. (2019), "Predicted and observed settlements induced by the mechanized tunnel excavation of metro line C near S Giovanni station in Rome", Tunn. Undergr. Sp. Tech., 86, 236-246. https://doi.org/10.1016/j.tust.2019.01.022. DOI |
3 | Nawel, B. and Salah, M. (2015), "Numerical modeling of two parallel tunnels interaction using three-dimensional finite elements method", Geomech. Eng., 9(6), 775-791. https://doi.org/10.12989/gae.2015.9.6.775. DOI |
4 | O'Reilly, M.P. and New, B.M. (1982), "Settlements above tunnels in the United Kingdom - Their magnitude and prediction", Proc. Tunn., IMM, London, 173-181. |
5 | Ding, Z., Wei, X.J. and Wei, G. (2017), "Prediction methods on tunnel-excavation induced surface settlement around adjacent building", Geomech. Eng., 12(2), 185-195. https://doi.org/10.12989/gae.2017.12.2.185. DOI |
6 | Zheng, G., Lu, P. and Diao, Y. (2015), "Advance speed-based parametric study of greenfield deformation induced by EPBM tunneling in soft ground", Comput. Geotech., 65, 220-232. https://doi.org/10.1016/j.compgeo.2014.12.013. DOI |
7 | Sugiyama, T., Hagiwara, T., Nomoto, T., Ano, Y., Mair, R.J., Bolton, M.D. and Soga, K. (1999), "Observations of ground movements during tunnel construction by slurry shield method at the docklands light railway Lewisham extension-East London", Soils Found., 39(3), 99-112. https://doi.org/10.3208/sandf.39.3_99. DOI |
8 | Yamaguchi, I., Yamazaki, I. and Kiritani, Y. (1998), "Study of ground-tunnel interactions of four shield tunnels driven in close proximity, in relation to design and construction of parallel shield tunnels", Tunn. Undergr. Sp. Tech., 13(3), 289-304. https://doi.org/10.1016/S0886-7798(98)00063-7. DOI |
9 | Broere, W. and Festa, D. (2017), "Correlation between the kinematics of a tunnel boring machine and the observed soil displacements", Tunn. Undergr. Sp. Tech., 70, 125-147. https://doi.org/10.1016/j.tust.2017.07.014. DOI |
10 | Celestino, T.B., Gomes, R.A.M.P. and Bortolucci, A.A. (2000), "Errors in ground distortions due to settlement trough adjustment," Tunn. Undergr. Sp. Tech., 15, 97-100. https://doi.org/10.1016/S0886-7798(99)00054-1. DOI |
11 | Eskandari, F., Goharrizi, K.G. and Hooti, A. (2018), "The impact of EPB pressure on surface settlement and face displacement in intersection of triplet tunnels at Mashhad metro", Geomech. Eng., 15(2), 769-774. https://doi.org/10.12989/gae.2018.15.2.769. DOI |
12 | Festa, D., Broere, W. and Bosch, J.W. (2015), "Kinematic behaviour of a tunnel boring machine in soft soil: Theory and observations", Tunn. Undergr. Sp. Tech., 49, 208-217. https://doi.org/10.1016/j.tust.2015.03.007. DOI |
13 | Frydman, S. (2011), "Characterizing the geotechnical properties of natural, Israeli, partially cemented sands", Geomech. Eng., 3(4), 323-337. https://doi.org/10.12989/gae.2011.3.4.323. DOI |
14 | Karakus, M., Ozsan, A. and Basarir, H. (2007), "Finite element analysis for the twin metro tunnel constructed in Ankara Clay, Turkey", Bull. Eng. Geol. Environ., 66, 71--79. https://doi.org/10.1007/s10064-006-0056-z. DOI |
15 | Sugimoto, M., Sramoon, A., Konishi, S. and Sato, Y. (2007), "Simulation of shield tunneling behavior along a curved alignment in a multilayered ground", J. Geotech. Geoenviron. Eng., 133(6), 684-694. https://doi.org/10.1061/(ASCE)1090-0241(2007)133:6(684). DOI |
16 | Qi, W.Q., Yang, Z.Y., Jiang, Y.S., Shao, X.K. and Yang. X. (2021), "Structural Deformation of Existing Horseshoe-Shaped Tunnels by Shield Overcrossing", KSCE J. Civ. Eng., 25(2), 735-749. https://doi.org/10.1007/s12205-020-0599-8. DOI |
17 | Liu, B., Yu, Z.W., Hang, Y.H., Wang, Z.L., Yang, S. and Liu, H. (2020), "A simplified combined analytical method for evaluating the effect of deep surface excavations on the shield metro tunnels", Geomech. Eng., 23(5), 405-418. https://doi.org/10.12989/gae.2020.23.5.405. DOI |
18 | Loganathan, N. and Poulos, H.G. (1998), "Analytical prediction for tunneling-induced ground movements in clays", J. Geotech. Geoenviron. Eng. 124, 846-856. https://doi.org/10.1061/(ASCE)1090-0241(1998)124:9(846). DOI |
19 | Rezaei, A.H., Shirzehhagh, M. and Golpasand, M.R.B. (2019), "EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements", Geomech. Eng., 19(2), 153-165. https://doi.org/10.12989/gae.2019.19.2.153. DOI |
20 | Standing, J.R. and Selemetas, J.R. (2013), "Greenfield ground response to EPBM tunnelling in London Clay", Geotechnique 63(12), 989-1007. https://doi.org/10.1680/geot.12.P.154. DOI |
21 | Verruijt, A. and Booker, J.R. (1996), "Surface settlements due to deformation of a tunnel in an elastic half plane", Geotechnique, 46(4), 753-756. https://doi.org/10.1680/geot.1996.46.4.753. DOI |
22 | Wan, M.S.P., Standing, J.R., Potts, D.M. and Burland, J.B. (2017), "Measured short-term ground surface response to EPBM tunnelling in London clay", Geotechnique, 67(5), 420-445. https://doi.org/10.1680/jgeot.16.P.099. DOI |
23 | Kim, K., Oh, J., Lee, H., Kim, D. and Choi, H. (2018), "Critical face pressure and backfill pressure in shield TBM tunneling on soft ground", Geomech. Eng., 15(3), 823-831. https://doi.org/10.12989/gae.2018.15.3.823. DOI |
24 | Zadeh, L.A. (1968), "Probability measures of fuzzy events", J. Math. Anal. Appl., 23(2), 421-427. https://doi.org/10.1016/0022-247x(68)90078-4. DOI |
25 | Ocak, I. (2013), "Interaction of longitudinal surface settlements for twin tunnels in shallow and soft soils: The case of Istanbul Metro", Environ. Earth. Sci., 69, 1673-1683. https://doi.org/10.1007/s12665-012-2002-7. DOI |
26 | Rowe, R.K. and Lee, K.M. (1992), "Subsidence owing to tunnelling II: Evaluation of a prediction technique", Can. Geotech. J., 29, 941-954. https://doi.org/10.1139/t92-105. DOI |
27 | Attewell, P.B. and Woodman, J.P. (1982), "Predicting the dynamics of ground settlement and its derivatives caused by tunnelling in soil", Ground Eng., 15(8), 9-6. |
28 | Dias, D. and Kastner, R. (2013), "Movements caused by the excavation of tunnels using face pressurized shields -Analysis of monitoring and numerical modeling results", Eng. Geol., 152, 17-25. https://doi.org/10.1016/j.enggeo.2012.10.002. DOI |
29 | Fang, K., Yang, Z., Jiang, Y., Sun, Z. and Wang, Z. (2020), "Surface subsidence characteristics of fully overlapping tunnels constructed using tunnel boring machine in a clay stratum", Comput. Geotech., 125, 103679. https://doi.org/10.1016/j.compgeo.2020.103679. DOI |
30 | Hasanpour, R., Chakeri, H., Ozcelik, Y. and Denek, H. (2012), "Evaluation of surface settlements in the Istanbul metro in terms of analytical, numerical and direct measurements", Bull. Eng. Geol. Environ., 71, 499-510. https://doi.org/10.1007/s10064-012-0428-5. DOI |
31 | Mair, R.J., Taylor, R.N. and Bracegirdle, A. (1993), "Subsurface settlement profiles above tunnels in clays", Geotechnique, 43, 315-320. https://doi.org/10.1680/geot.1993.43.2.315. DOI |
32 | Nelson, J.T. and Watry, D.L. (2015), Vibration Control at Sound Transit, Springer, Berlin, Heidelberg, Germany, 313-320. |
33 | Peck, R.B. (1969), "Deep excavations and tunneling in soft ground", Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico City, Mexico. |
34 | Mollon, G., Dias, D. and Soubra, A.H. (2013), "Probabilistic analyses of tunneling-induced ground movements", Acta Geotech. 8, 181-199. https://doi.org/10.1007/s11440-012-0182-7. DOI |
35 | Kim, D., Pham, K., Park, S., Oh, J.Y. and Hangseok, C. (2020), "Determination of effective parameters on surface settlement during shield TBM", Geomech. Eng., 21(2), 153-164. https://doi.org/10.12989/gae.2020.21.2.153. DOI |
![]() |