Browse > Article
http://dx.doi.org/10.7836/kses.2014.34.2.016

Renewable Energy Configuration Plan of Micro Grid in Gapa Island  

Kim, Dong-Wan (Multidisciplinary Graduate School Program For Wind Energy, Jeju National University)
Ko, Ji-Han (Multidisciplinary Graduate School Program For Wind Energy, Jeju National University)
Kim, Seong Hyun (Department of Electrical Engineering, Jeju National University)
Kim, Homin (Department of Electrical Engineering, Jeju National University)
Kim, Eel-Hwan (Department of Electrical Engineering, Jeju National University)
Publication Information
Journal of the Korean Solar Energy Society / v.34, no.2, 2014 , pp. 16-23 More about this Journal
Abstract
This paper presents a renewable energy configuration plan of Micro grid in Gapa Island. To analyze the characteristics of Micro grid, BESS (Battery Energy Storage System), PMSG (Permanent Magnet Synchronous Generator) and SCIG (Squirrel Cage Induction Generator) are first modelled. The PMSG and SCIG will operate with basis on the real power curve. when the total power demand is larger than the total power generation, the BESS will be operated and the SOC (State Of Charge) is reduced. If the value of SOC could drop down to limited value, the system may be broken because of the voltage drop of BESS. To solve this problem, a DG (Diesel Generator) is used to charge the BESS and keep the voltage value of BESS with in a allowance limit. This paper represents simulation result when PMSG, SCIG connected to the Micro grid installed in Gapa Island. The simulation is carry out by using PSCAD/EMTDC program with actual line constant and transformer parameter in Gapa Island.
Keywords
Microgrid; BESS; PMSG; SCIG; SOC; PSCAD/EMTDC;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Kyebyung Lee, Kwang M. Son, Silsoo Jang, Implementation of Microgrid using Energy Storage System, Trans. KIEE, Vol 59, No 2, Feb. 2010   과학기술학회마을
2 Jin Kyung-Min, Kim Seong Hyun, Kim Eel-Hwan, Estimation of minimum BESS capacity for regulating the output of wind farms considering power grid operating condition in Jeju Island, Journal of the Korean Solar Energy Society, Vol 33, No 4, 2013   과학기술학회마을   DOI   ScienceOn
3 Jong-Yul Kim, Seul-Ki Kim, June-Ho Park, Contribution of an Energy Storage System for Stabilizing a Microgrid during Islanded Operation, Journal of Electrical Engineering & Technology, Vol 4, No 2, 2009   과학기술학회마을   DOI
4 Wujong Lee, Hyunsik Jo, Hank Ju Lee, Hanju Cha, Seamless Transfer Operation Between Grid-connected and Stand-Alone Modeinthe Three-phase Inverter, Trans. KIEE, Vol 62, No 2, 2013   과학기술학회마을   DOI   ScienceOn
5 Seung-Ho Song, Tae-Hwa Kwon, Firing Angle Control of Soft Starter for Reduction of Inrush Current during Grid Connection of Induction-type Wind Generator, Trans. KIEE, Vol 10, 2005   과학기술학회마을
6 Ji-Heon Lee, Myong-Bo Shim, Hye-Yeon Lee, Byung-Moon Han, Seung-Chul Yang, Operational Analysis of Energy Storage System to Improve Performance of Wind Power System with Induction Generator, Trans. KIEE, Vol 58, No 6, Jun, 2009   과학기술학회마을
7 Ahmed A. Daoud, Sobhy S. Dessouky, Ahmed A. Salem, Control Scheme of PMSG Based Wind Trubine for Utility Network Connection, 10th International Conference on Environment and Electircal Engineering(EEEIC), May, 2011