Feasibility Study on Wind Power Forecasting Using MOS Forecasting Result of KMA |
Kim, Kyoung-Bo
(Korea Meteorological Administration)
Park, Yun-Ho (Korea Meteorological Administration) Park, Jeong-Keun (Ecobrain Co, Ltd) Ko, Kyung-Nam (Test and Evaluation Research Center for Clean Energy Development, Cheju National University) Huh, Jong-Chul (Faculty of Mechanical & System Engineering, Cheju National University) |
1 | 제주지방기상청, 제주지방예보실무지침서, 2008; 173. |
2 | http://anemos.cma.fr/index.php |
3 | 김경보, 이경호, 고경남, 허종철 "KWRF를 이용한 풍력발전 출력 예측 타당성 연구", 한국풍력에너지학회, 춘계학술발표회, 2008. |
4 | 기상청 "강수형태 및 풍향/풍속 MOS 모델 개발과 실시간 운영 체계"디지털예보개발과 기술노트 2007-3. |
5 | 지식경제부 "3차 신재생에너지 기술개발 및 이용․ 보급 기본계획" 2008. |
6 | Nielsen TS, Madsen H, Tfting J. Experiences with statistical methods for wind power prediction.Proceedings of the European Wind Energy Conference, Nice,1999;1066-1069. |
7 | Ernst B, Rohrig K. Online-monitoring and prediction of wind power in German transmission system operation centres. Proceedings of the First IEA Joint Action Symposium on Wind Forecasting Techniques, Nor가oping, 2002; 125-145. |