Case study for technical evaluation and check list to decision of optimized TBM |
Kim, Ki-Hwan
(Geotechnical Business Division, Sambo Engineering Co., Ltd.)
Kim, Hyouk (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Kim, Seong-Cheol (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Kang, Si-On (Geotechnical Business Division, Sambo Engineering Co., Ltd.) |
1 | Kim, K.H., Kim, H., Mun, C.H., Kim, Y.H., Kim, D.H., Lee, J.Y. (2017), "A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid)", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 985-997. DOI |
2 | Kim, K.H., Kim, H., Kim, S.C., Kang, S.O., Mun, C.H. (2020), "The suggestion of tunneling information and detail requirements for EPB shield machine design", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 6, pp. 611-622. DOI |