A study on the optimal reinforced zone of a small sectional shield TBM tunnel in difficult ground |
Kang, Byung-Yun
(Soosung Engineering)
Park, Hyung-Keun (School of Civil Engineering, Chungbuk National University) Cha, Jae-Hoon (Geotechnical and Tunnel Dept., Soosung Engineering) Kim, Young-Jin (Geotechnical and Tunnel Dept., Soosung Engineering) |
1 | Architecture and Civil Engineering Dictionary (1994), Korea dictionary research publishing, pp. 1401. |
2 | Cho, W.S. (2016), Numerical analysis on the behavior of shield TBM cable tunnel, Master Thesis, Inha University, pp. 104. |
3 | Cho, W.S., Song, K.I., Kim, K.Y. (2014), "The study on the effect of fracture zone and its orientation on the behavior of shield TBM cable tunnel", Korean Tunnelling and Underground Space Association, Vol. 16, No. 4, pp. 403-415. DOI |
4 | Gong, Q., Yin, L., Ma, H., Zhao, J. (2016), "TBM tunneling under adverse geological conditions: An overview", Tunnelling and Underground Space Technology, Vol. 57, pp. 4-17. DOI |
5 | Hunt, S.W. (2017), Tunneling in cobbles and boulders, Breakthroughs in Tunneling Short Course, Chicago, USA, pp.1-46. |
6 | Im, J.C., Hong, S.W. (2001), "A case study on the decision of boulder layer in Busan subway construction site", Korean Tunnelling and Underground Space Association, Vol. 3, No. 3, pp. 50-57. |
7 | Jeong, H.Y., Zhang, N., Jeon, S.W. (2018), "Review of technical issues for shield TBM tunneling in difficult grounds", Korean Society for Rock Mechanics and Rock Engineering, Vol. 28, No. 1, pp. 1-24. |
8 | Kim, K.Y. (2015), A study on cutter exchange cycle in earth pressure balance shield TBM method during the drilling of complex strata for city railway construction, Master Thesis, Seoul National University of Science and Technology, pp. 71. |
9 | Kim, S.S. (2001), A study on forecasting ultimate displacement in tunneling, Master Thesis, Inha University, pp. 58. |
10 | Korean Agency for Technology and Standards (1992), KS F 2302 (in Korean). |
11 | Kwak, C.W., Park, I.J. (2015), "Numerical simulation for surface settlement considering face vibration of TBM tunnelling in mixed-face condition", Korean Tunnelling and Underground Space Association, Vol. 17, No. 3, pp. 333-339. DOI |
12 | Lee, S.W. (2008), Development of simulation model for urban subway tunnel construction based on simulation, Master Thesis, Inha University, pp. 61. |
13 | Ministry of Land, Transport and Maritime Affairs (2011), Road Design Manual-Tunnel (in Korean), pp. 1118. |
14 | Kim, J.W. (2013), Case study on the effectiveness of injection in LW grouting, Master Thesis, Pukyong National University, pp. 101. |
15 | Nam, K.C., Heo, Y., You, K.H. (2003), "The effects of the face reinforcement at shallow tunnels in fractured rock masses", Korean Tunnelling and Underground Space Association, Vol. 5, No. 4, pp. 323-336. |
16 | Oh, T.S. (2014), Model testing and analysis on shield TBM excavation for railway tunnel in mixed ground, Ph.D. Thesis, Seoul National University of Science and Technology, pp. 124. |
17 | Seo, M.B. (2016), Ground reinforcement effect of short-period vibration grouting, Ph.D. Thesis, Korea National University of Transportation, pp. 130. |