A study on the machine load on shield advancing between soil ground and mix ground included core stone |
Kim, Ki-Hwan
(Geotechnical Business Division, Sambo Engineering Co., Ltd.)
Kim, Hyouk (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Mun, Cheol-Hwa (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Kim, Young-Hyu (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Kim, Dong-Ho (Geotechnical Business Division, Sambo Engineering Co., Ltd.) Lee, Jae-Yong (Geotechnical Business Division, Sambo Engineering Co., Ltd.) |
1 | Kim, K.H., Kim, H., Mun, C.H., Kim, Y.H., Kim, D.H., Lee, J.Y. (2017), "A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid)", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 985-997. DOI |
2 | MTR Corporation Limited (2011a), Contract 1109 - Particular Specification, Tunnel Boring Machine (TBM) and Lining. |
3 | MTR Corporation Limited (2011b), Geotechnical Baseline Report (Revision C), Shatin to Central Link, Detailed Design for Sung Wong Toi to Ho Man Tin. |