Evaluation of shield TBM segment acting load through monitoring data back analysis |
Lee, Gyu-Phil
(KICT Geotechnical Engineering Research Institute)
Chang, Soo-Ho (KICT Geotechnical Engineering Research Institute) Bae, Gyu-Jin (KICT Geotechnical Engineering Research Institute) Choi, Soon-Wook (KICT Geotechnical Engineering Research Institute) Ahn, Chang-Yoon (HDC Civil Engineering Team) |
1 | International Tunnelling Association Working Group 2 (2000), "Guidelines for the design of shield tunnel lining", Tunnelling and Underground Space Technology, Vol. 15, No. 3, pp. 307-311. |
2 | Japan Society of Civil Engineers (2006), "Standard specifications for tunneling -2006: Shield Tunnels", pp. 39-55. |
3 | Kim, H., Kim, H., Shin, K., Ahn, S. (2017), "A Study on the factors influencing the segment lining design solved by beam-spring model in the shield tunnel", Journal of the Korean Tunnelling and Underground Association, Vol. 19, No. 2, pp. 179-194. DOI |
4 | Lee, G.-P., Hwang, J.-H., Shin, H.-S., Hong, S.-K. (2010), "Mechanical behaviour of waterway culvert structure assembled by precast segments", Journal of the Korean Tunnelling and Underground Association, Vol. 12, No. 2, pp. 193-200. |
5 | Lee, G.P., Park, Y.T., Choi, S.W., Bae, G.J., Chang, S.H., Kang, T.S., Lee, J.S. (2012), "An experimental study on mechanical behavior of shield segment with high-strength concrete and high-tension rebar", Journal of the Korean Tunnelling and Underground Association, Vol. 14, No. 3, pp. 215-230. DOI |
6 | Lee, H.-S., Moon, H.-K. (2016), "Numerical study on the connection type of inner-slab in double deck tunnel", Journal of the Korean Tunnelling and Underground Association, Vol. 18, No. 5, pp. 441-451. DOI |
7 | Ove Arup & Partners Ltd (2012), "Steel fibre reinforced precast concrete segmental tunnel lining designdesk study report", pp. 12-13. |