1 |
Barton, N. (1995), "Permanet support for tunnels using NMT", Research meeting of Korean Society for Rock Mechanics & The Korean Society of Engineering Geology, pp. 1-26.
|
2 |
Dep. of The ARMY Corps. of Engineers (1978), "Engineering and Design Tunnels and Shafts in Rock", ENGINEER MANUAL EM1110-2-2901 15 SEP.
|
3 |
Gwangju Metropolitan Waterworks Authority (2010), "Detailed design report of water conveying tunnel connecting Gwangju city to the Donbok lake".
|
4 |
Korea Water Resources Corporation (1995), "Detailed design report of the step 5 project of capital area multi-regional water supply system".
|
5 |
Korea Water Resources Corporation (1996), "Detailed design report of Daechung-Dam (step 2) multi-regional water supply system".
|
6 |
Korea Water Resources Corporation (2000), "Detailed design report of multi-regional water supply system in the southern part of Jeon-Nam".
|
7 |
Korea Water Resources Corporation (2007), "Water conveying tunnel design & construction management guidelines", pp. 641-642.
|
8 |
Korea Water Resources Corporation (2011), "Dam design standard & explanation", pp. 219-227.
|
9 |
Korea Water Resources Corporation (2011), "Detailed design report of 2nd water conveying tunnel in Han-river downstream".
|
10 |
Korea Water Resources Corporation (2013), "Detailed design report of Yangsan region of Nakdonggang River riverbank filtrate".
|
11 |
Lee, S.D. (2013), "Tunnel mechanics", Published by SSIAIAL, pp. 251, pp. 995-1047.
|
12 |
Rourke, T.D.O'. (1984), "Guidelines for tunnel lining design", American Society of Civil Engineers, New York, pp. 42-43.
|
13 |
Seeber, G. (1999), "Druckstollen and Druckschachte", Bemessung-Konstruktion. Ausfuhrung, ENKE Verlag, Stuttgart/New York.
|
14 |
Seoul Metropolitan Rapip Transit Corporation (1983), "Technique result report for A team region of Seoul Subway 3.4 line", pp. 193-239.
|
15 |
Szechy, K. (1973), "The art of tunnelling", AKADEMIAIKIADO BUDAPEST, pp. 174-304.
|