1 |
Kim, S.H., Kim, J.T., Kang, J.K. (2010), "A study on TBM cutter head aperture ratio through the indoor model experiment", Journal of Korean Tunnelling and Underground Space Association No. 11 Tunnel mechanized construction technology International Symposium, pp. 213-220.
|
2 |
Oh, T.S. (2014), "Model testing and analysis on shield TBM excavation for railway tunnel in mixed ground", Seoul University of Science and Technology, Railroad professional Graduate school, Railroad Construction Engineering Department, Thesis of Doctor of Engineering, pp. 39.
|
3 |
Snowdon, R.A., Ryley, M.D., Temporal, J. (1982), "A study of disc cutting in selected british rocks", International Journal of Rock Mechanics & Mining Sciences & Geomech. Abstr., 19, pp. 107-121.
|
4 |
Chang, S.H., Choi, S.W., Bea, G.J., Jeon, S.W. (2007), "A parametric study of rock properties and mechanical cutting conditions for deriving an optimum design model of a TBM cutterhead equipped with disc cutters", Journal of Korean Society of Civil Engineers, Vol. 27, No. 1C, pp. 87-98.
|
5 |
Emmanuel Detournay, Thomas Richard, Mike Shepherd (2008), "Drilling response of drag bits: Theory and experiment", International Journal of Rock Mechanics and Mining Sciences, Vol. 45, pp. 1347-1360.
DOI
|
6 |
Friant, J.E., Ozdemir, L. (1993), "Tunnel boring technology present and future", Proc of Rapid Excavation and Tunnelling Conference (RETC), pp. 869-888.
|
7 |
Kang, U.M., Kim, Y.M., Hwang, I.J., Kim, S.H. (2015), "Development of scaled shield TBM drag bits evaluation machine", KTA 2015 General Assembly and Annual Conference of Korean Tunnelling and Underground space association, pp. 175-178.
|
8 |
Kim, S.H. (2003), "A study on the development of the tunnel drilling equipment for the tunnel excavation simulation", Journal of Korean Tunnelling and Underground Space Association Vol. 5, No. 2, pp. 199-207.
|
9 |
Kim, S.H., Kim J.T., Jang, I.S. (2012), "A study on the using experimental system for Shield-TBM Drag bit performance evaluation bit design element analysis", KTA 2012 Symposium, pp. 2-10, Korean Tunnelling and Underground space association "Tunnel engineering series 3 tunnel mechanized construction design" pp. 34-35.
|
10 |
Kim, S.H., Kim J.T., Lim, C.H. (2012), "A study on the arrangement design of Shield-TBM cutter bit", Journal of the Korean geotechnical society, Vol. 28, No. 5, pp. 9-10.
|