1 |
Jang, J. W., Jeon, B. G., Kim, M. J. and Kim, S. K. (2020). "Equipment path planning for an intelligent equipment control platform." Journal of the Korea Institute of Construction Engineering and Management 2020 Conference, pp. 55 (in Korean).
|
2 |
Kim, S. K. (2013). "3D-based earthwork planning and CO2 emission estimation for automated earthworks." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 33, No. 3, pp. 1191-1202 (in Korean).
DOI
|
3 |
Kim, S. K. and Lim, S. Y. (2017). "A study on the improvement of a fleet management system for construction equipment." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 37, No. 6, pp. 1063-1076 (in Korean).
DOI
|
4 |
Lim, S. Y. (2020). A study on the development of construction equipment fleet management system for the improvement in productivity of large earthwork sites, Doctoral Dissertation, Seoul National University of Science & Technology (in Korean).
|
5 |
Lim, S. Y. and Kim, S. K. (2020). "Productivity analysis using a fleet management system for construction equipment." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 40, No. 1, pp. 587-595 (in Korean).
|
6 |
Patle, B. K., Ganesh, L., Pandey, A., Parhi, D. R. K. and Jagadeesh, A. (2019). "A review: On path planning strategies for navigation of mobile robot." Defence Technology, Vol. 15, No. 4, pp. 582-606.
DOI
|
7 |
Science and Technology Strategy Institute (STSI) (2019). Planning report for a development of smart construction technology, Ministry of Land, Infrastructure, and Transport, MLIT, Report#1615010364 (in Korean).
|
8 |
Seo, J. W., Kwon, S. H., Lee, Y. S., Lee, I. W., Shin, H. S., Choi, S. J., Jung, W. Y., Kim, S. K. and Lee, S. R. (2020). Development of intelligent construction fleet management, MLIT Smart Construction R&D Proposal 20SMIP-B157089-01 (in Korean).
|