1 |
Stevens, C. R. (2005). "Signals and meters at roundabouts." Mid-Continent Transportation Research Symposium, Ames, Iowa, August 2005.
|
2 |
Tianzi, C., Shaochen, J. and Hongxu, Y. (2013). "Comparative study of VISSIM and SIDRA on signalized intersection." Procedia-Social and Behavioral Sciences, Vol. 96, pp. 2004-2010.
DOI
|
3 |
TRB (2010). "Highway capacity manual 2010." Transportation Research Board, National Research Council, Washington D.C.
|
4 |
Yin, D. and Qiu, T. Z. (2011). "Comparison of macroscopic simulation models in modern roundabout analysis." Transportation Research Record: Journal of the Transportation Research Board, Vol. 2265, pp. 244-252.
DOI
|
5 |
Zadid, M. A. and Yue, W. L. (2009). "Comparison of a roundabout model using AASIDRA and PARAMICS." 32nd Australasian Transport Research Forum (ATRF), Auckland, New Zealand.
|
6 |
Akcelik, R. (2006a). "Analysis of roundabout metering signals." AITPM National Conference, Melbourne, Australia.
|
7 |
Akcelik, R. (2006b). "Operating cost, fuel consumption and pollutant emission savings at a roundabout with metering signals." ARRB 22nd Conference, Canberra, Australian Capital Territory, Australia.
|
8 |
An, H. K., Yue, W. L. and Holyoak, N. (2014a). "Signal metering roundabout evaluation using fuzzy logic." The 32nd Conference of Australian Institutes of Transport Research (CAITR), University of New South Wales, Sydney, Feb 2014.
|
9 |
Akcelik, R. (2011). "Roundabout metering signals: capacity, performance and timing." Procedia-Social and Behavioral Sciences, Vol. 16, pp. 686-696.
DOI
|
10 |
Akcelik, R., ASSOCIATES. (2009). SIDRA INTERSECTION User Guide (for Version 6), AKCELIK and Associates Pty Ltd, Melbourne, Australia.
|
11 |
An, H. K., Kim, Y. S., Bae, G. M. and Yue, W. L. (2014b). "Comparative analysis of Roundabout and Metering Roundabout with 3-legs, 4-legs(with 1 lane)." Korea Planners Association 2014 National Conference, Chungbuk University, Korea (in Korean).
|
12 |
AZHAR, A. M. and SVANTE, B. (2011). "Signal control of roundabouts." Procedia-Social and Behavioral Sciences, Vol. 16, pp. 729-738.
DOI
|
13 |
Jiban, S. (2009). METERING ROUNDABOUT CAPACITY AND PERFORMANCE ANALYSIS USING aaSIDRA 2.0 SOFTWARE, Master Dissertation, University of South Australia, Adelaide, South Australia, Australia.
|
14 |
Kim, T. Y., Kim, K. H. and Park, B. H. (2010). "A study of effectiveness of entry/exit flare at roundabout." Journal of Korean Society of Transportation, Vol. 28, No. 6, pp. 25-32 (in Korean).
|
15 |
Lim, J. K., Kim, T. Y. and Park, B. H. (2010). "Effectiveness questions on the installation of right-turn bypass lane in roundabout." Journal of the Korean Society of Road Engineers, Vol. 12, No. 12, pp. 29-37 (in Korean).
|
16 |
Qian, H. B., Li, K. P. and Sun, J. (2008). "The development and enlightenment of signalized roundabout." Intelligent Computation Technology and Automation (ICICTA), 2008 International Conference, IEEE, 2, pp. 538-542.
|