1 |
Sanders, M. D. (2014). Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects.
|
2 |
DOE. (2015). M&V Guidelines: Measurement and Verification for Performance-based Contracts. Version 4.0.
|
3 |
Lawrence Berkeley National Laboratory (2013). EnergyIQ. http://energyiq.lbl.gov
|
4 |
Autodesk (2016), Autodesk Green Building Studio, http://gbs.autodesk.com
|
5 |
Gaasch, W. H., Travis, J., Zhao, F., Kaplan, M., & Muth, C. (2014). A Comparison of Methods for Early-Stage Retrofit Analyses
|
6 |
EPA. (2016). The difference between source and site. energy. https://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/use-portfolio-manager/understand-metrics/difference
|
7 |
SAREK. (2016). RTS-SAREK. https://www.dcs.co.kr/product/product_introduce.php?product=sarek
|
8 |
Thermal dynamics. (2016) Ground Loop Design. http://www.groundloopdesign.com
|
9 |
KEMCO (2016). The Building Energy Efficiency Certification, http://www.kemco.or.kr/building/v2/buil_cert/buil_cert_1_5.asp
|