1 |
2014 Energy Consumption Survey, Korea Energy Economics Institute.
|
2 |
J.H. Huh, "Building Energy Management", KIASEBS, Vol.4 No.2, pp. 18-24
|
3 |
G. Wang, L. Song, Air handling unit supply air temperature optimal control during economizer cycles, Energy and Buildings, 49 (2012) 310-316.
DOI
|
4 |
C.S.P. W.J.Suh, Issues and Limitations on the Use of a Whole Building Simulation Tool for Energy Diagnosis of a Real-life Building, AIK, 28(1) (2012) 273-283.
|
5 |
Y. Yao, L. Wang, Energy analysis on VAV system with different air-side economizers in China, Energy and Buildings, 42 (8) (2010) 1220-1230.
DOI
|
6 |
A.A. Chowdhury, M.G. Rasul, M.M.K. Khan, Modelling and analysis of air-cooled reciprocating chiller and demand energy savings using passive cooling, Applied Thermal Engineering, 29 (8-9) (2009) 1825-1830.
DOI
|
7 |
J.E. Son, K.H. Lee, Cooling energy performance analysis depending on the economizer cycle control methods in an office building, Energy and Buildings, 120 (2016) 45-57.
DOI
|
8 |
C.H.C. Steven T. Taylor, Economizer High Limit Controls and Why Enthalpy Economizers Don't Work, ASHRAE, 52 (11) (2010).
|
9 |
L.S. Gang Wang, Energy Analysis, Optimal High-Limit Control and Engineering Approach of Air-Side Economizers, ASHRAE Transactions, 120 (2014) 383-396.
|
10 |
M.L. G. Wang, Optimal Outside Air Control for Air Handling Units with Humidity Control, Proceedings of International Conference for Enhanced Building Operations (2006).
|