Compensation for Machining Error included by Tool Deflection Using High-Speed Camera |
Bae, J.S.
(인천대학교 기계공학과 대학원)
Kim, G.H. (인하대학교 기계공학과 대학원) Yoon, G.S. (한국생산기술연구원 정밀금형팀) Seo, T.I. (인천대학교 기계공학과) |
1 | S. J. Huang, C. Y. Shy, 1999, IEEE Transactions on Industrial Electronics, Vol. 46, No. I, p. 169 DOI ScienceOn |
2 | T. Watanabe, S. Iwai, 1983, Transactions of the ASME, Journal of Dynamic Systems, Measurement and Control, Vol. 105, p. 192 DOI |
3 | Z. Lechniak, A. Werner, K. Skalski, K. Kedzior, 1998, Journal of Materials Processing Technology, Vol. 76, p. 42 DOI ScienceOn |
4 | 임태순, 이채문, 김석원, 이득우, 2002, 터빈블레이드의 5 축 고속가공에서 최적가공경로의 선정, 한국소성가공학회 2002 금형가공 심포지엄, pp. 53-60 |
5 | C. C. Lo, C. Y. Hsiao, 1998, Computer-Aided Design, Vol. 30, No. 1, p. 55 DOI ScienceOn |
6 | T. I. Seo, M. W. Cho, 1999, Journal of the Korean Society of Precision Engineering, Vol. 16, No.7, p. 203 |
7 | M. W. Cho, G. H. Kim, T. I. Seo, Y. C. Hong, H. H. Cheng, 2002, International Journal of Production Research, Vol. 40, No.9, p. 2159 DOI ScienceOn |
8 | M. W. Cho, T. I. Seo, 2006, International Journal of Machine Tools & Manufacture, Vol. 46, p. 1417 DOI ScienceOn |
9 | R. S. Jober, Y. C. Shin, O. D. I., Nwokah, 1997, Transactions of the ASME, Journal of Dynamic Systems, Measurement and Control, Vol. 119, p. 146 DOI |
10 | E. M. Lim, C. H. Menq, 1997, Transactions of ASME, Journal of Manufacturing Science and Engineering, Vol. 119, p. 402 DOI ScienceOn |
11 | M. W. Cho, T. I. Seo, H. D. Kwon, 2003, Journal of materials Processing Technology, Vol. 136, p. 88 DOI ScienceOn |