1 |
Kim, H.N., A Study on Optimization of Manufacturing Flow Line, Using TOC and Pull-Push System, Chungnam National University, 2008.
|
2 |
Grosfeld-Nir, A. and Magazine, M., Gated MaxWIP : a strategy for controlling multistage production system, International Journal of Production Research, 2002, Vol. 40, No. 11, pp. 2557-2568.
DOI
|
3 |
Grosfeld-Nir, A., Magazine, M., and Vanberkel, A., Push and pull strategies for controlling multistage production system, International Journal of Production Research, 2000, Vol. 38, No. 11, pp. 2361-2375.
DOI
|
4 |
Kim, J., Jung, J.Y., and Lee, J., Optimizing Work-In- Process Parameter using Genetic Algorithm, Journal of Society of Korea Industrial Systems Engineering, 2017, Vol. 40, No. 2, pp. 79-86.
|
5 |
Kwon, C.M. and Lim, S.G., Bottleneck Detection Based on Duration of Active Periods, Journal of the Korea Society for Simulation, 2013, Vol. 22, No. 3, pp. 35-41.
DOI
|
6 |
Lee et al., Development of Robotic System based on RFID Scanning for Efficient Inventory Management of Thick Plates, Journal of the Korea Academia-Industrial Cooperation Society, 2016, Vol. 17, No. 10, pp. 1-8.
DOI
|
7 |
Lee, G.H., The performance Evaluation of DBR for An MTO Manufacturing with an Assembly Process, AJU University, 2009.
|
8 |
Lee, H.C. and Seo, D.W., Comparison of DBR with CONWIP in a Production Line with Constant Processing Times, Journal of the Korea Society for Simulation, 2012, Vol. 21, No. 4, pp. 11-24.
DOI
|
9 |
Park, S.G., Performance comparison of process control mechanism due to changes in the production environment, Hongik University Institute of Technology, 2010.
|
10 |
Satya, S.C., An evaluation of the DBR control mechcanism in a job shop environment, Omega, 2001, Vol. 29, No. 4, pp. 335-342.
DOI
|
11 |
Spearman, M.L., Woodruff, D.L., and Hopp, W.J., CONWIP : a pull alternative to kanban, International Journal of Production Research, 1990, Vol. 28, No. 5, pp. 879-894.
DOI
|
12 |
Watson, K.J. and Patti, A., A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime, International Journal of Production Research, 2008, Vol. 46, No. 7, pp. 1869-1885.
DOI
|