1 |
Govers, C.P.M., What and How about Quality function Deployment (QFD). International Journal of Production Economics, 1996, Vol. 46, p 575-585.
|
2 |
Bae, S.T., Signalman Action Analysis for Container Crane Controlling. Journal of Korea Multimedia Society, 2009, Vol. 12, No. 12, p 1728-1735.
|
3 |
Bicknell, B. and Bicknett, K.D., The Road Map to Repeatable Success; using QFD to Implement Change, CRC Press, Boca Raton, FL, 1995.
|
4 |
Gi, D.H. and Kim, W.G., Crane died Status and safety measures. Journal of the Korean Society of Safety, 2005, Vol. 20, No. 1, p 137-142.
|
5 |
Ho, J.K., The Development of Tools Selecting Tower Crane and Reviewing the Safety. Korean Society for internet Information(Fall), 2005, Vol. 6, No. 2, p 811-814.
|
6 |
Jang, G.H. and Park, C.S., Development of an Enhanced PQ model for contractor qualification. Architecture Institute of Korea, 1995, Vol. 15, No. 2, p 667-671.
|
7 |
Jeon, J.H. and Han, M.Y., A Study on using Counter Weight Technology for a Crane's Energy Saving and Improving performance. The Korean Society of Mechanical Engineers(Fall), 2002, p 1051-1056.
|
8 |
Jeong, D.K. and Yun, G.B., A Study on Fatigue Life Assessment Procedure for a Container Crane. Journal of the Korean institute of industrial safety, 1999, Vol. 14, No. 2, p 11-18.
|
9 |
Kim, J.S., A study on the High speed Railway Route Selection-Focusing on 4 design tools, 2011. Seoul Nation University of Science and Technology, Master's degree Thesis, 2011.
|
10 |
Kim, Y.S., Cho, J.K., Kim, M.J., Cho, K.M., and Hyun, C.T., A Productivity Analysis of Tower Crane Installation Progress Based on Simulation Technique. The Korea Institute of Building Construction, 2010, Vol. 10, No. 2, p 33-40.
DOI
|
11 |
Masood, A.B., A combined AHP-GP model for quality control systems. International Journal of Production Economics, 2001, Vol. 72, No. 1, p 27-40.
DOI
|
12 |
Kim, J.H., Sohn, S.G., and Lee, K.T., Empirical Study on Efficiency Of Government Contract in Korea. korean jounal of management accounting research, 2011, Vol. 1, No. 1, p 133-154.
|
13 |
Lee, B.W., A Study on Core Competences of ITS Project Managers using QFD and AHP. Seoul Nation University of Science and Technology, Master's degree Thesis, 2010.
|
14 |
Lee, H.J., The Development of Evaluation Indicators for the Performance of Defense Core-Technology R&D Projects Using SMR/AHP. Seoul Nation University of Science and Technology, 2010, Doctor degree Thesis.
|
15 |
Ohk, S.M., Park, T.J., and Ryu, K.R, Optimization of the work plan of the real-time automation Jean Ji Jean Crane. Korea Institute of Intelligent Systems(Fall), 2006, p 336-344.
|
16 |
Park, J.H., Park, T.J., Im, H.G., and Seo, E.H., Analysis of Crane Accidents by Using a Man-Machine System Model. Journal of the Korean Society of Safety, 2007, Vol. 22, No. 2, p 59-66.
|
17 |
Vaidya, O.S. and Kumar, S., Analytic hierarchy process : An overview of applications. European Journal of Operational Research, 2006, Vol. 169, p 1-29.
DOI
|
18 |
Won, Y.W., Kim, K.Y., and Yun, D.K., Consistency Check of a House of Quality Chart by Limiting Probability Concept and Median Rank. The Journal of Society of Korea Industrial and Systems Engineering, 2010, Vol. 33, No. 3, p 22-29.
|
19 |
Wu, D., Lin Y., Wang, X., Wang, X., and Shunde G., Algorithm of Crane Selection for Heavy Lifts. Journal of computing in civil engineering ASCE, 2011, p 57-65.
|
20 |
Yang, Y. and Mitsuo GEN, Resource Allocation Problem for a Quay Cranes and Berths Scheduling by Hybrid Evolutionary Algorithm, 2008, feedback. Applied Mathematics and Computation, 2006, Vol. 180, p 63-75.
DOI
|
21 |
Yun, T.W., Kim, H.Y., and Lee, K.J., A Study on Evaluating Method for the Capability of Construction Firms(Final). Korea Institute of construction technology, 1989, Vol. 12, p 1-208.
|
22 |
Ko, B.I., Park, J.H., Im, H.G., and Seo, E.H., Compared to the ergonomic evaluation of international relevant standards for crane accident prevention. The Ergonomics Society of Korea(Fall), 2006, p 389-392.
|