1 |
Choi, S-W. and Kim, Y-D.; "Minimizing makespan on a two-machine re-entrant flowshop," Journal of the Operational Research Society, 58(7) : 972-981, 2007.
DOI
ScienceOn
|
2 |
Choi, S-W. and Kim, Y-D.; "Minimizing makespan on an m-machine re-entrant flowshop," Computers and Operations Research, 35(5) : 1684-1696, 2008.
DOI
ScienceOn
|
3 |
Choi, S-W. and Kim, Y-D.; "Minimizing total tardiness on a two-machine re-entrant flowshop," Journal of the Operational Research Society, 199(2) : 375-384, 2009.
DOI
ScienceOn
|
4 |
Choi, S-W., Lim, T-K., and Kim Y-D.; "Heuristics for scheduling wafer lots at the deposition workstation in a semiconductor wafer fab," 36(2) : 125-137, 2010.
|
5 |
Kim, Y-D., Kim, J-U., Lim, S-K., and Jun, H-B.; "Duedate based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility," IEEE Transactions on Semiconductor Manufacturing, 11(1) : 155- 164, 1998.
DOI
ScienceOn
|
6 |
Lawler, E. L. and Moore, J. M.; "A functional equation and its application to resource allocation and sequencing problems," Management Science, 16(1) : 77-84, 1969.
DOI
ScienceOn
|
7 |
Lee, C. Y. and Uzsoy, R.; "A new dynamic programming algorithm for the parallel machines total weighed completion time problem," Operational Research Letters, 11 : 73-75, 1992.
DOI
ScienceOn
|
8 |
Lee, G-C.; "Scheduling methods for a hybrid flowshop with dynamic order arrival," Journal of the Korea Institute of Industrial Engineers, 32(4) : 373-381, 2006.
|
9 |
Lim, S-K., Kim, J-G., and Kang, J-G.; "A collaboration system for two-stage semiconductor manufacturing supply chain," Journal of the Korea management Engineers Society, 14(2) : 11-29, 2009.
|
10 |
Sung, C. S. and Choung, Y. I.; "Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing," European Journal of Operational Research, 120(3) : 559- 574, 2000.
DOI
ScienceOn
|
11 |
Thiagarajan, S. and Rajendra, C.; "Scheduling in dynamic assembly job-shops to minimizie the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs," Computers and Industrial Engineering, 49(4) : 463-503, 2005.
DOI
ScienceOn
|
12 |
Webster, S.; "A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems," European Journal of Operational Research, 70(3) : 327- 334, 1993.
DOI
ScienceOn
|
13 |
Webster, S.; "A note on schedule of n jobs on two identical machines to minimize weighted mean flow time," Computers and Industrial Engineering, 26 : 795-796, 1994.
DOI
ScienceOn
|
14 |
Wein, L. M.; "Scheduling semiconductor wafer fabrication," IEEE Transactions on Semiconductor Manufacturing, 1(3) : 115-130, 1988.
DOI
ScienceOn
|
15 |
Bruno, j., Coffiman, Jr., E. G., and Sethi, G.; "Scheduling independent tasks to reduce mean finishing time,ʼ Comunications of the ACM, 17(7) : 382-387, 1974.
DOI
ScienceOn
|