1 |
Kuik, R., Salomon, M. Van Wassenhove, L. N., and Maes, J.; "Linear Programming, Simulated Annealing and Tabu Search Heuristics for Lotsizing in Bottleneck Assembly Systems," IIE Transactions, 25(1) : 62-72, 1993
DOI
|
2 |
Stadtler, H.; "Improved rolling scheduling for the dynamic single-level lot-sizing problem," Management Science, 46(2) : 318-326, 2000
DOI
ScienceOn
|
3 |
Tempelmeier, H. and Helber, S.; "A Heuristic for Dynamic Multi-Item Multi-Level Capacitated Lotsizing for General Product Structures," European Journal of Operational Research, 75 : 296-311, 1994
DOI
ScienceOn
|
4 |
Rojanasoonthon, S. and Bard, J.; "A GRASP for parallel machine scheduling with time windows," INFORMS Journal on Computing, 13(1) : 32-51, 2005
DOI
ScienceOn
|
5 |
Tempelmeier, H, and Derstroff, M.; "A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times," Management Science, 425 : 738-757, 1996
DOI
ScienceOn
|
6 |
Aiex, R. M, Resende, M G. C., and Ribeiro, C. C.; "Probability distribution of solution time in GRASP: An experimental investigation," Journal of Heuristics, 8 : 343-373, 2002
DOI
ScienceOn
|
7 |
Sahling, F., Buschkuhl, L., Tempelmeier, H., and Helber, S.; "Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and -optimize heuristic," Computers and Operations Research, 36 : 2546-2553, 2009
DOI
ScienceOn
|
8 |
Drexl, A. and Haase, K.; "Proportional lot sizing and scheduling," International Journal of Production Economics, 40 : 73-87, 1995
DOI
ScienceOn
|
9 |
Eppen, G. D. and Martin, R. K.; "Solving multi-item capacitated lot-sizing problems using variable redefinition," Operations Research, 35 : 832-848, 1987
DOI
ScienceOn
|
10 |
Ertogral, K. and Wu, S. D.; "Auction-theoretic coordination of production planning in the supply chain," IIE Transactions, 32 : 931-940, 2000
DOI
ScienceOn
|
11 |
Kimms, A.; "Competitive Methods for Multi-level Lot Sizing and Scheduling : Tabu search and Randomized Regrets," International Journal of Production Research, 34(8) : 2279-2298, 1996
DOI
ScienceOn
|
12 |
Ross, A. D.; A Two-Phsed Approach to the Supply Network Reconfiguration Problem. European Journal of Operational Research, 122 : 18-30, 2000
DOI
ScienceOn
|
13 |
Stadtler, H.; "Mixed Integer Programming Model Formulations for Dynamic Multi-Item, Multi-Level Capacitated Lotsizing," European Journal of Operational Research, 94 : 561-581, 1996
DOI
ScienceOn
|
14 |
Meas, J., McClain, J. O., and Van Wassenhove, L. N.; "Mutilevel Capacitated Lotsizing Complexity and LP-based Heuristics," European Journal of Operational Research, 53 : 131-148, 1991
DOI
ScienceOn
|
15 |
Florian, M., Lenstra, J. K., and Rinnooy Kan, A. H. G.; "Deterministic Production Planning Algorithms and Complexity," Management Science, 26 : 669-679, 1980
DOI
ScienceOn
|
16 |
Hung, Y. F. and Chien, K. L.; "A Multi-Class Multi-Level Capacitated Lot Sizing Model," Journal of the Operational Research Society, 51(11) : 1309-1318, 2000
DOI
ScienceOn
|
17 |
Almeder, C.; "A hybrid optimization approach for multilevel capacitated lot-sizing problems," European Journal of Operational Research, 2009, In press
|
18 |
Bahl, H. C. and Ritzman, L. P.; "An Integrated Model for Master Scheduling, Lot Sizing and Capacity Requirements Planning," Journal of the Operational Research Society, 35 : 389-399, 1984
DOI
ScienceOn
|
19 |
Fleischmann, B.; "The discrete lot-sizing and scheduling problem," European Journal of Operational Research, 44 : 337-348, 1990
DOI
ScienceOn
|
20 |
Hung, Y. F. and Hu, Y. C,; "Solving Mixed Integer Programming Production Planning Problems with Setups by Shadow Price Information," Computers and Operations Research, 25 : 1027-1042, 1998
DOI
ScienceOn
|
21 |
Kuik, R. and Salomon, M.; "Batching Decisions: Structure and Models," European Journal of Operational Research, 75 : 243-260, 1994
DOI
ScienceOn
|
22 |
Akartunali, K. and Miller, A.; "A heuristic approach for big bucket multi-level production planning problems," European Journal of Operational Research, 193 : 394-411, 2009
DOI
ScienceOn
|
23 |
Trigeiro, W. W., Thomas, L. J. and McClain, J. O.; "Capacitated lot-sizing with setup times," Management Science, 35 : 353-366, 1989
DOI
ScienceOn
|
24 |
Bahl, H. C., Ritzman, L. P., and Gupta, J. N. D.; "Determining Lot Sizes and Resource Requirement: a Review," Operations Research, 35 : 329-345, 1987
DOI
ScienceOn
|
25 |
Feo, T. A. and Resende, M. G. C.; "Greedy randomized adaptive search procedures," Journal of Global Optimization, 6 : 109-133, 1995
DOI
|
26 |
Vergana, F, E., Khouja, M., and Michalewicz, Z.; "An Evolutionary Algorithm for Optimizing Material Flow in Supply Chain," Computers and Industrial Engineering, 43 : 407-421, 2002
DOI
ScienceOn
|
27 |
Kimms, A.; "A genetic algorithm for multi-level, multi-machine lot sizing and scheduling," Computers and Operations Research, 26(8) : 829-848, 1999
DOI
ScienceOn
|
28 |
Roundy, R. O.; "Efficient, Effective Lot Sizing for Multi stage Production Systems," Operations Research, 41 : 371-385, 1993
DOI
ScienceOn
|
29 |
Jayaraman, V. and Ross, A.; "A Simulated Annealing Methodology to Distribution Network Design and Management," European Journal of Operational Research, 144 : 629-645, 2003
DOI
ScienceOn
|
30 |
Karmarkar, U. and Schrage, L.; "The deterministic dynamic product cycling problem," Operations Research, 33 : 326-345, 1985
DOI
ScienceOn
|