Browse > Article

Minimization of Total Weighted Earliness and Tardiness on a Single Burn-In Oven U sing a Genetic Algorithm  

Park, You-Jin (Department of Business Administration, College of Social Sciences, Chung-Ang University)
Publication Information
Journal of Korean Society of Industrial and Systems Engineering / v.31, no.4, 2008 , pp. 21-28 More about this Journal
Keywords
Scheduling Problem; Burn-In Oven; Genetic Algorithms; Earliness; Tardiness; Dynamic Programming;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Gupta, S. K. and Kyparisis, J.; "Single Machine Scheduling Research," International Journal of Management Science, 15(3), 207-227, 1987
2 Monch, L., Unbehaun, R. and Choung, Y. I.; "Minimizing earliness-tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint," OR Spectrum, 28, 177-198, 2006   DOI
3 Sidney, J.; Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties. Operations Research, 25(1), 62-69, 1977   DOI   ScienceOn
4 Baker, K. R. and Scudderb, G. R.; "Sequencing with Earliness and Tardiness Penalties : A Review," Operations Researches, 38(1), 22-36, 1990   DOI   ScienceOn
5 Sen, T. and Gupta, S. K.; A State-of-the-Art Survey of Static Scheduling Research Involving Due Dates. International Journal of Management Science, 12(1), 63-69, 1984
6 Ferris, M. C. and Vlach, M.; "Scheduling with earli- ness and tardiness penalties," Naval Research Logistics Quarterly, 39, 229-245, 1992   DOI
7 Mehta, S. V. and Uzsoy, R.; "Minimizing total tardiness on a batch processing machine with incompatible job families," IIE Transactions, 30, 167-178, 1998
8 Pinedo, M.; Scheduling : Theory, Algorithms, and Systems. Prentice-Hall, NJ, 1995
9 Goldberg, D. E.; Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley Longman Publishing, Boston, MA, 1989
10 Ow, P. S. and Morton, T. E.; "The Single Machine Early/Tardy Problem," Management Science, 35(2), 177- 191, 1989   DOI   ScienceOn
11 Chandru, V., Lee, C. Y., and Uzsoy, R.; "Minimizing total completion time on a batch processing machine with job families," Operations Research Letters, 13, 61-65, 1993   DOI   ScienceOn
12 Wang, C. S. and Uzsoy, R.; "A genetic algorithm to minimize maximum lateness on a batch processing machine," Computers and Operations Research, 29 : 1621- 1640, 2002   DOI   ScienceOn
13 Baker, K. R.; Introduction to Sequencing and Scheduling, Wiley, New York, NY, 1974
14 Lakshminarayan, S., Lakshmanan, R., Papineau, R. L., and Rochete, R.; "Optimal single machine scheduling with earliness and tardiness penalties," Operations Research, 26(6), 1079-1082, 1978   DOI   ScienceOn
15 Garey, M. R., Tarjan, R. E., and Wilfong, G. T.; "One- Processor Scheduling with Symmetric Earliness and Tardiness Penalties," Mathematics of Operations Research, 13, 330-348, 1988   DOI   ScienceOn
16 Azizoglu, M. and Webster, S.; "Scheduling a batch processing machine with incompatible job families," Computers and Industrial Engineering, 39, 325-335, 2001   DOI   ScienceOn