1 |
Wang, K.-J. and Lin, S.-H.; 'Capacity expansion and allocation for a semiconductor testing facility under constrained budget,' Production Planning and Control, 13 : 429-437, 2002
DOI
ScienceOn
|
2 |
Bard, J. F., Srinivasan, K., and Tirupati, D.; 'An optimization approach to capacity expansion in semiconductor manufacturing facilities,' International Journal of Production Research, 37 : 3359-3382, 1999
DOI
|
3 |
Chakravorty, S. S. and Atwater, J. B.; 'A comparative study of line design approaches for serial production systems,' International Journal of Operations and Production Management, 16 : 91-108, 1996
|
4 |
Kirkpatrick, S., Gelatt Jr. C. D., and Vecchi, M. P.; 'Optimization by simulated annealing,' Science, 220 : 671-680, 1983
DOI
ScienceOn
|
5 |
Quadt, D.; Lot-sizing and scheduling for flexible flow lines, Lecture notes in economics and mathematical systems, Springer, Berlin Germany. 2004
|
6 |
McMillian, P. R. and Frazier, G. V.; 'Using simulated annealing to solve a multiobjective assembly line balancing with parallel workstations,' International Journal of Production Research, 36 : 2717-2741, 1998
DOI
ScienceOn
|
7 |
Wu, S. D., Erkoc, M., and Karabuk, S.; 'Managing Capacity in the high-tech industry : A review of literature,' The Engineering Economist, 50 : 125-158, 2005
DOI
ScienceOn
|
8 |
Erel, E. and Sarin, S. C.; 'A survey of the assembly line balancing procedures,' Production Planning and Control, 9 : 414-434, 1998
DOI
|
9 |
Becker, C. and Scholl, A.; 'A survey on problems and methods in generalized assembly line balancing,' European Journal of Operational Research, 168 : 694-715, 2006
DOI
ScienceOn
|
10 |
Gupta, J. N. D., Hariri, A. M. A., and Potts, C. N.; 'Scheduling a two-stage flowshop with parallel machines at the first stage,' Annals of Operations Research, 69 : 171-191, 1997
DOI
|
11 |
Scholl, A. and Becker, C.; 'State-of-the-art exact and heuristic solution procedures for simple assembly line balancing,' European Journal of Operational Research, 168 : 666-693, 2006
DOI
ScienceOn
|
12 |
Wang, K.-J., Wang, S.-M., and Yang, S.-J.; 'A resource portfolio model for equipment investment and allocation of semiconductor testing industry,' European Journal of Operational Research, 179 : 390-403, 2007
DOI
ScienceOn
|
13 |
Alisanto, D., Khoo, L. P., and Jiang, P. Y.; 'An immune algorithm approach to the scheduling of a flexible PCB flow shop,' International Journal of Advanced Manufacturing Technology 22 : 819-827, 2003
DOI
|
14 |
Johnson, D. S., Aragon, C. R., McGeoch, L. A., and Schevon, c.; 'Optimization by simulated annealing : an experimental evaluation; part I, graph partitioning,' Operations Research, 37 : 865-892, 1989
DOI
ScienceOn
|