1 |
Hung, Y. F. and Chen, I. P.(1998), A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabrication, Production Planning & Control, 9(7), 714-722
DOI
ScienceOn
|
2 |
Wein, L. M.(1998), scheduling semiconductor wafer fabrication' IEEE Transactions on Semiconductor Manufacturing, 1(3), 115-130
|
3 |
Nakata, T., Matsui, K., Miyake, Y. and Nishioka, K.(1999), Dynamic bottleneck control in wide variety production factory, IEEE Transactions on Semiconductor Manufacturing, 12(3), 273-280
DOI
ScienceOn
|
4 |
Lu, S. C. H. and Kumar, P. R,(1991), Distributed scheduling based on due dates and buffer priorities, IEEE Transactions on Automatic Controls, 36, 1406-1416
|
5 |
Baek, D.H., Yoon, W.C and Park, S.C.,(1998), A spatial rule adaptation procedure for reliable production control in a wafer fabrication system, International Journal of Production Research 36(6), 1475-1491
|
6 |
Lin, J, T., Wang, F. and Yen, P.(2001), Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab, International Journal of Production Research 39(6), 1221-1238
|
7 |
Egbelu, D. R and Beale, M.(1984), Characterization of automatic-guided vehicle dispatching rules, International Journal of Production Research 22, 359-374
|
8 |
Pinedo(2001), Scheduling 2/E: Theory, Algorithma, and Systems, Prentice Hall
|