1 |
김채복, 'Cut Tree Approach for the Facility Layout Problem',경영과학, 제11권, 제3호(l994). pp.55-65.
|
2 |
Donaghey, Charles E. and Pire, Vanina F., 'Facility layouts with BLOCPLAN', Industrial Engineering, University of Houston, Houston, TX, 1990
|
3 |
Johnson, Roger V., 'SPACECRAFT for multi-floor layout planning', Management Science, VoI.28, No.4(l982), pp.407-417
|
4 |
MeIIer, R. D., 'The nuiti-bay manyfacturing floor layout problem', Intemational Joumal of Production Research, Vol.35, No.5(1997), pp.1229-1237
|
5 |
Gomory, R. E. and Hu, T. C., 'Multi-terminal network flows', Joumal of SIAM, Vol.9, No.4(l961), pp.551-570
|
6 |
Kochhar, J. S. and Heragu, S. S., 'MULTI-HOPE: a tool for multiple floor layout problems', Intemational Joumal of Production Research, VoI.36, No.12(l998), pp,3421-3435
|
7 |
Drezner, Zvi, 'A heuristic procedure for the layout of a large number of facilities', Management Science, VoI.33, No.7(l987), pp.901-915
|
8 |
김채복, 김영식, 이동훈, "Branch and Bound Algorithmfor the Facility Layout Problem without Shape Distortion', 한국경영과학회지, 제21 권, 제2호(l996). pp.59-70.
|
9 |
김채복, 박세진, 김철중, '감성 측정평가 시뮬레이터의 설비배치', 대한인간공학회지, 제18권, 제2호(1999). pp.121-132
|
10 |
Montreuil, Benoit and Ratliff, H. D., 'Utilizing cut trees as design skeletons for facility layout', lIE Transactions, Vol.2l, No.2(l989), pp.136-143
|
11 |
Bozer, Yavuz A., MeIIer, Russel D. and Erlebacher, Steven J., 'An improvement type layout algorithm for multiple floor facilities', Management Science, Vol.40, No.7(l994), pp. 918-932
|
12 |
Kim, Chae-Bogk, Foote, B. L. and Pulat, P. S., 'Cut-tree construction for facility layout', Computers and Industrial Engineering, Vol.28, No.4(l995), pp.721-730
|