1 |
Alex, J., Benedetti, L., Copp, J., Gernaey, K. V., Jeppsson, U., Nopens, I., Pons, M-N., Rieger, L., Rosen, C., Steyer, J. P., Vanrolleghem, P., and Winkler, S. (2008). Benchmark Simulation Model no. 1 (BSM1), CODEN:LUTEDX/(TEIE-7229)/1-62/(2008), pp. 12-13
|
2 |
Kim, K. (2008). A study on optimum management model for wastewater treatment plant according to increasing water inflow on rainy days. Ph.D Dissertation, Department of Environmental Engineering, University of Seoul, pp. 84-85.
|
3 |
Park, H., and Song S. (2004). "Estimations of efficiency for wastewater treatment plant with changing sludge height and increasing water inflow on rainy days." Journal of Korean Society of Environmental Engineering, Vol. 36, No. 8, pp. 549-558.
DOI
|
4 |
Saman Co. (2007) CSOs treatment plan in wastewater treatment plant. Korea.
|
5 |
Takacs, I., Patry, G., and Nolasco, D. (1991). "A dynamic model of the clarification-thickening process." Water Research, Vol. 25, No. 10, pp. 1263-1271.
DOI
|