1 |
Bowles, D.S. (1988). "Verde River Risk Assessment: an Interim Solution Study." paper presented at the 8th annual USCOLD Meeting, Phoenix, AZ, January.
|
2 |
Digest DG471 (2002). "Low-rise building foundations on soft ground, Building Research Establishment."
|
3 |
Gelman, A., Carlin, J.B., Stern, H.S., and Rubin, D.B. (2004). Bayesian Data Analysis. CHAPMAN&HALL/CRC.
|
4 |
Haimes, Y.Y. (1988). "Alternatives to the precommensuration of costs, benefits, risk. and time." Journal of Water Resources Planning and management, ASCE, New York.
|
5 |
Hsu, Y.C., Tung, Y.K., and Kuo, J.T. (2011). "Evaluation of dam overtopping probability induced by flood and wind." Stochastic Environmental Research and Risk Assessment, Vol. 25, No. 1, pp. 35-49.
DOI
|
6 |
Jan C. Grygier, and Jery R. Stedinger (1985). "Algorithms for Optimizing Hydropower System Operation." Journal ofWater Resources Research, Vol. 21, No. 1, pp. 1-10.
DOI
|
7 |
Jensen, J. (2001). "Genetic Evaluation of Dairy Cattle Using Test-Day Models." Journal of Dairy Science, Vol. 84, No. 12, pp. 2803-2812.
DOI
|
8 |
Karlsson, P., and Haimes, Y. (1989). "Risk Assessment of Extreme Events: Application." J. Water Resour. Plann. Manage., Vol. 115, No. 3, pp. 299-320.
DOI
|
9 |
Kreuzer, H., and Bury, K. (1984). "A probability based evaluation of the safety and risk of existing dams, Proceedings of the International Conference on Safety of Dams." Coimbra, April 23-28, Edited by J. Laginha Serafim, University of Coimbra, Portugal.
|
10 |
Kuo, J.T., Hsu, Y.C., Tung, Y.K., Yeh, K.C., and Wu, J.D. (2008). "Dam overtopping risk assessment considering inspection program." Stochastic Environmental Research and Risk Assessment, Vol. 22, No. 3, pp. 303-313.
DOI
|
11 |
Kwon, H.H., and Moon, Y.I. (2006). "Improvement of Overtopping Risk Evaluations Using Probabilistic Concepts for Existing Dams, Stochastic Environmental Research and Risk Assessment." Springer-Verlag, Vol. 20, No. 4, pp. 223-237.
DOI
|
12 |
Kwon, H.H., Moon, Y.I., and Khalil, A.F. (2007). "Nonparametric Monte Carlo Simulation for Flood Frequency Curve Derivation: An Application to a KOREAN Watershed." Journal of the AmericanWater Resources Association, Vol. 43, No. 5, pp. 1316-1328.
DOI
|
13 |
Kwon, H.-H., Kim, J.-G., Lee, J.-S., and Na, B.-K. (2012). "Uncertainty Assessment of Single Event Rainfall-Runoff Model Using Bayesian Model." Journal of Korea Water Resources Association, KWRA, Vol. 45, No. 5, pp. 505-516.
DOI
|
14 |
Lee, J.Y., Lee, J.S., and Kim, K.Y. (2014). "Prediction of Loss of Life in Downstream due to Dam Break Flood." Journal of Korea Water Resources Association, Vol. 47, No. 10, pp. 879-889.
DOI
|
15 |
Na, B.K., Kim, J.Y., Kwon, H.H., and Lim, J.Y. (2014). "Improvement of Hydrologic Dam Risk Analysis Model Considering Uncertainty of Hydrologic Analysis Process." Journal of Korea Water Resources Association, KWRA, Vol. 47, No. 10, pp. 853-865.
DOI
|
16 |
Nelsen, R.B. (2006). "An Introduction to copulas." Springer, New York, pp. 109-155.
|
17 |
Pearl, J. (1988). "Probabilistic Reasoning in Intelligence Systems." Morgan Kaufmann, San Mateo, CA, 1988
|
18 |
Prendergast, J.D. (1979). "Probabilistic Concept for Gravity Dam Analysis." Special Rep, M-265, Construction Engineering Research Lab, U.S. Army Corps of Engineers, Champaign.
|
19 |
Sin, C.S., Ryu, G.J., Jo, K.S., and Bae, B.W. (2007). "Improvement of Hydrological Safety Evaluation Gideline for Existing Dams." Journal of Korea Water Resources Association, KWRA, Vol. 40, No. 10, pp. 44-52.
|
20 |
Sklar, K. (1959). "Fontions de reprartition a n dimensions et leurs marge." Publ. Inst. Statis. Univ. Paris 8, pp. 11.
|
21 |
Srivastava, A. (2008). "Generalized event tree algorithm and software for dam safety risk analysis." Utah State University.
|
22 |
Thompson, K.D., Stedinger, J.R., and Heath, D.C. (1997). "Evaluation and presentation of dam failure and flood risks." Journal of Water Resources Planning and Management, Vol. 123. No. 4, pp. 216-227.
DOI
|