1 |
박수완 (2009). '상수관로에 대한 시간종속형 공변수를 포함한 포괄적 비례위험모형.' 한국수자원학회논문집, 한국수자원학회, 제42권, 제6호, pp. 445-455
과학기술학회마을
DOI
ScienceOn
|
2 |
Clark, R.M., Stafford, C.L. & Goodrich, J.A. (1982). 'Water distribution systems: A spatial and cost evaluation.' Journal of Water Resources Planning and Management-ASCE, Vol. 108, No. 3, pp. 243-256
|
3 |
Cox, D. R. (1972). 'Regression Models and Life Tables.' Journal of Royal Statistic Society, Vol. 34(B), pp. 187-220
|
4 |
Dandy, G.C. and Engelhardt, M. (2001). 'Optimal scheduling of water pipe replacement using genetic algorithms.' Journal of Water Resources Planning and Management-ASCE, Vol. 127, No. 4, pp. 214-223
DOI
ScienceOn
|
5 |
de Schaetzen, W., Randall-Smith, M.J., Savic, D. and Walters, G.A. (1998). 'A Genetic algorithm approach for rehabilitation in water supply systems.' Proc. Int. Conf. on Rehabilitation Technol. for Water Industry, pp. 1-11
|
6 |
Halhal, D., Walters, G.A., Ouzar, D. and Savic, D.A. (1997). 'Water network rehabilitation with a structured messy genetic algorithm.' Journal of Water Resources Planning and Management-ASCE, Vol. 123, No. 3, pp. 137-146
DOI
ScienceOn
|
7 |
Kim, J.H. and Mays, L.W. (1994). 'Optimal rehabilitation model for water-distribution systems.' Journal of Water Resources Planning and Management-ASCE, Vol. 120, No. 5, pp. 674-692
DOI
ScienceOn
|
8 |
Kleiner, Y. and Rajani, B. (2001). 'Comprehensive review of structural deterioration of water mains: statistical models.' Urban Water, Vol. 3, pp. 131-150
DOI
ScienceOn
|
9 |
Lansey, K.E., Basnet, C., Mays, L.W. and Woodburn, J. (1992). 'Optimal maintenance scheduling for water distribution systems.' Civil Engineering Systems, E & FN Spon, London, Vol. 9, pp. 211-256
DOI
|
10 |
Male, J.W., Walski, T.M. and Slutsky, A.H. (1990). 'Analyzing water main replacement policies.' Journal of Water Resources Planning and Management-ASCE, Vol. 116, No. 3, pp. 362-374
DOI
|
11 |
Park, S. and Loganathan, G.V. (2002). 'Optimal pipe replacement analysis with a new pipe break prediction model.' Journal of the Korean Society of Water and Wastewater, Vol. 16, No.6, pp. 710-716
|
12 |
Park, S., Kim, J.W., Agbenowosi, N. and Jun, H. (2007). 'A methodology to estimate economically optimal replacement time interval of water distribution pipes.' Water Science and Technology: Water Supply, Vol. 7, No. 5, pp. 149-155
DOI
ScienceOn
|
13 |
Ramos, W.L. (1985). 'Benefit/cost analysis procedure for determining water main replacement.' Proc. AWWA Conf. Symp., pp. 125-133
|
14 |
Shamir, U. and Howard, C.D.D. (1979). 'An analytic approach to scheduling pipe replacement.' Journal American Water Works Association, Vol. 71, No. 5, pp. 248-258
|
15 |
Walski, T.M. and Pelliccia, A. (1982). 'Economic analysis of water main breaks.' Journal American Water Works Association, Vol. 74, No. 3, pp. 140-147
|
16 |
Deb, A.K., Hasit, Y.J., Grablutz, F.M. and Herz, R.K. (1998). Quantifying future rehabilitation and replacement needs of water mains. AWWA Research Foundation
|
17 |
Kleiner, Y., Adams, B.J. and Rogers, J.S. (1998). 'Selection and scheduling of rehabilitation alternatives for water distribution systems.' Water Resources Research, Vol. 34, No. 8, pp. 2053-2061
DOI
ScienceOn
|
18 |
Loganathan, G.V., Park, S. and Sherali, H.D. (2002). 'A threshold break rate for pipeline replacement in water distribution systems.' Journal of Water Resources Planning and Management-ASCE, Vol. 128, No. 4, pp. 271-279
DOI
ScienceOn
|