Browse > Article
http://dx.doi.org/10.3741/JKWRA.2003.36.5.811

The Propriety of Design Outlet Conduit of Dam by Hydraulic Model Experiments  

Choi, Byong-Kyu ((주)삼안건설기술공사 수력부, 서울시립대학교 토목공학과)
Kang, Tae-Ho ((주)삼안건설기술공사 수력부)
Jung, Yo-Han ((주)삼안건설기술공사 수력부)
Publication Information
Journal of Korea Water Resources Association / v.36, no.5, 2003 , pp. 811-821 More about this Journal
Abstract
In this study is if the design of outlet conduit was appropriate or not by analyzing flow characteristic of outlet conduit with performing hydraulic model experiments. As the results of hydraulic model experiments, the capacity of outlet conduit of elementary design was under estimated, and the designed values of the capacity of outlet conduit of preliminary design based on the values of elementary design was nearly equal to the values of experiments, so the propriety of design was identified. In addition, as the results of examinations of negative pressure of outlet conduit, and propriety of longitudinal sections, the resulting values were within the maximum permissible limits, so it was proved that the design was appropriate. In the base of such processes, the propriety of scale and location of outlet conduit of preliminary design was examined.
Keywords
hydraulic model experiment; outlet conduit model; Hantangang Dam;
Citations & Related Records
연도 인용수 순위
  • Reference
1 윤용남(1994). 수리학. 청문각, pp. 502-507
2 건설교통부(2001). 댐설계기준
3 농업기반공사 농어촌연구원(2000). 제주 성읍댐 물넘이 수리모형실험
4 송재우(2001). 수리학. 구미서관, pp. 391-395
5 한국수자원공사(2002). 한탄강댐 기본설계 보고서
6 이길성, 김남일(1997). '3차원 흐름해석을 위한 여수로 유입수로의 2차원 흐름해석', 대한토목학회 학술발표회 논문집, 대한토목학회, pp. 71-74
7 栢井條介, 中西 徹(1988). '一面 ベルァウス式ダム放流管流入部の水理特性', ダム水理關係表論文集 資料-V, 建設省土木硏究所, pp. 187-192
8 山海堂(1995). ダム水理施設の計算例 實際に投立っ水理計算例
9 山海堂(2000). 建設省 河川砂防施設基準(案) 同解說(設計編)
10 日本公營株式會社(1999). 灰塚ダム水理設計業務報告書
11 건설교통부 국립건설시험소(1997), 남한강 수리모형실험