Performance assessment of repair techniques of large diameter water pipes |
Ho-Min Lee
(Water & Wastewater Research Center, K-water)
Jeong-Soo Park (Water & Wastewater Research Center, K-water) Gimoon Jeong (Water & Wastewater Research Center, K-water) Cheol-Ho Bae (Water & Wastewater Research Center, K-water) |
1 | Azraai, S.N.A., Lim, K.S., Yahaya. N. and Noor. N.M. (2015). Infill Materials of Epoxy Grout for Pipeline Rehabilitation and Repair, Malaysian J. Civil Eng., 27(1), 162-167. |
2 | American Water Works Association Research Foundation (AWWARF). (2002). Prioritization Water Main Replacement and Rehabilitation. |
3 | American Water Works Association(AWWA). (2012). Pipeline Repair for Water Utilities DVD. |
4 | AWWA. (2014). M28 Rehabilitation of Water Mains 3rd Ed. |
5 | Korea Agent for Technology and Standards(KATS). (2007a). Test pieces for tensile test for metallic materials(KS B 0801). |
6 | KATS. (2007b). DC arc welding machine(KS C 9602). |
7 | KATS. (2018). Covered electrodes for mild steel(KS D 7004). |
8 | Ministry of Environment(MOE). (2020). 2020 Statistics of waterworks. |
9 | Pipeline Research Council International(PRCI). (2006). Pipeline Repair Manual. |
10 | Rogers, P.D. and Grigg, N.S. (2009). Failure assessment modeling to prioritize water pipe renewal: Two case studies, J. Infra. Syst., 15(3), 162-171. DOI |